I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
The weight of concrete per cubic metre varies depending on the mix and density.
The weight of normal concrete is around 2400 kg/m³
Lightweight concrete can weigh as little as 1600 kg/m³
Heavyweight concrete can weigh up to 3800 kg/m³
The weight of concrete can also be affected by the aggregates used
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
posted on 13 Aug 2022
I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
My strength is my ability to lead and motivate a team towards achieving goals.
Effective communication skills
Strong decision-making abilities
Ability to delegate tasks efficiently
Positive attitude towards challenges
Experience in managing teams
Motivational skills
Goal-oriented mindset
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
posted on 29 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
posted on 21 Feb 2022
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu
posted on 22 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
I applied via Walk-in
About your job, location, CTC
based on 25 reviews
Rating in categories
Deputy Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant General Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager Materials
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
DPT.Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Ramky Infrastructure
McNally Bharat Engineering
Consolidated Construction Consortium
SPML Infra