Upload Button Icon Add office photos

Filter interviews by

Kloeckner Desma Machinery Production Engineer Interview Questions and Answers

Updated 7 Aug 2023

Kloeckner Desma Machinery Production Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Vishwakarma Government Engineering College, Ahmedabad and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Aptitude Test 

General Mathematics and Logical questions.

Round 2 - HR 

(1 Question)

  • Q1. Introduction, likes dislikes, dreams, Reasons for working in Desma, etc.
Round 3 - Technical 

(1 Question)

  • Q1. Machining parameters, Tools and fixture related questions, CNC Programming software related questions.
Round 4 - One-on-one 

(1 Question)

  • Q1. Questions regarding working hrs, some technical questions related to Material science, Manpower management related questions,etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be well prepared before giving interview.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to calculate oee?
  • Ans. 

    OEE can be calculated by multiplying Availability, Performance, and Quality.

    • Calculate Availability: (Operating Time - Downtime) / Operating Time

    • Calculate Performance: (Ideal Cycle Time * Total Count) / Operating Time

    • Calculate Quality: Good Count / Total Count

    • Multiply Availability, Performance, and Quality to get OEE

    • Example: Availability = (400 - 50) / 400 = 0.875, Performance = (2 * 350) / 400 = 1.75, Quality = 300 / 3

  • Answered by AI
  • Q2. What type of kaizen you performed in your last company
  • Ans. 

    Implemented 5S methodology to improve efficiency and organization in the production line.

    • Implemented visual management tools to streamline workflow

    • Standardized work processes to reduce variability

    • Engaged employees in continuous improvement initiatives

    • Reduced waste by optimizing inventory management

    • Conducted regular Gemba walks to identify improvement opportunities

  • Answered by AI

Production Engineer Interview Questions & Answers

Trelleborg user image Yoganandha Janekunte

posted on 26 Sep 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Overall equipment effectiveness
  • Ans. 

    Overall equipment effectiveness (OEE) is a measure of how well a manufacturing process is performing.

    • OEE is calculated by multiplying availability, performance, and quality rates.

    • It helps identify areas for improvement in production processes.

    • Example: If a machine has an availability of 90%, performance of 95%, and quality of 98%, the OEE would be 83.7%.

  • Answered by AI
  • Q2. Product development
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. 4M , Rejection Anylisis, DWM , OEE , Poka-Yoka etc
Round 3 - HR 

(1 Question)

  • Q1. About responsiblity, Manpower handling , Salery structure etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on ur responsiblity in Company.

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. 1. About your self. 2. Why are you hire ?. 3. What is different between Hard work and Smart work?. 4 . which are you do like Smart work or hard work?.
  • Q2. What will you expect salary?

Interview Preparation Tips

Topics to prepare for MITA Production Engineer interview:
  • Communication Skills
  • Basic knowledge of computer
  • Basic knowledge of your field
Interview preparation tips for other job seekers - Just before when, you will go with a communication skills .
And you are feel the experience in communication field.etc
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Indeed and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. General Questions ❓
  • Q2. Your basic knowledge testing.

Interview Preparation Tips

Topics to prepare for PMT Machines Executive Production interview:
  • Basic technical
Interview preparation tips for other job seekers - Do not come to interview as joining to this company is wasting your time at worst place.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

Related basic knowledge

Round 3 - One-on-one 

(2 Questions)

  • Q1. Self introduction
  • Q2. Technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - No tips
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is line balancing
  • Ans. 

    Line balancing is the process of evenly distributing work tasks among production line workers to optimize efficiency.

    • Line balancing aims to minimize idle time and maximize productivity.

    • It involves analyzing the tasks required in a production process and assigning them to workers in a way that minimizes bottlenecks.

    • The goal is to achieve a smooth flow of work and ensure that no worker is overloaded while others are idle...

  • Answered by AI
  • Q2. Explain oee nd how to calculate
  • Ans. 

    OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a production line or machine is utilized.

    • OEE is calculated by multiplying Availability, Performance, and Quality factors.

    • Availability measures the percentage of time the machine is available for production.

    • Performance measures the speed at which the machine operates compared to its maximum potential.

    • Quality measures the percentage of good-q...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a production engineer with experience in optimizing manufacturing processes and improving efficiency.

    • Experienced in analyzing production data and identifying areas for improvement

    • Proficient in using Lean and Six Sigma methodologies to streamline operations

    • Implemented cost-saving measures that resulted in a 20% reduction in production expenses

    • Collaborated with cross-functional teams to develop and implement new pro

  • Answered by AI
  • Q2. Why you leaving your current company?
  • Ans. 

    Seeking new challenges and growth opportunities.

    • Looking for a company that aligns better with my career goals.

    • Seeking a more dynamic and innovative work environment.

    • Wanting to broaden my skill set and learn new technologies.

    • Desire for increased responsibility and leadership opportunities.

    • Company restructuring or downsizing.

    • Commute or relocation reasons.

    • Personal reasons or family commitments.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just learn about line balancing ,oee,5s,nd basics nd final round will be taken by md Mr jignesh pancal who is veryrude person so don't be smart in front of him just give the straight answer

Production Engineer Interview Questions & Answers

Trelleborg user image Yoganandha Janekunte

posted on 26 Sep 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Overall equipment effectiveness
  • Ans. 

    Overall equipment effectiveness (OEE) is a measure of how well a manufacturing process is performing.

    • OEE is calculated by multiplying availability, performance, and quality rates.

    • It helps identify areas for improvement in production processes.

    • Example: If a machine has an availability of 90%, performance of 95%, and quality of 98%, the OEE would be 83.7%.

  • Answered by AI
  • Q2. Product development
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. 4M , Rejection Anylisis, DWM , OEE , Poka-Yoka etc
Round 3 - HR 

(1 Question)

  • Q1. About responsiblity, Manpower handling , Salery structure etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on ur responsiblity in Company.

Kloeckner Desma Machinery Interview FAQs

How many rounds are there in Kloeckner Desma Machinery Production Engineer interview?
Kloeckner Desma Machinery interview process usually has 5 rounds. The most common rounds in the Kloeckner Desma Machinery interview process are Resume Shortlist, Aptitude Test and HR.
What are the top questions asked in Kloeckner Desma Machinery Production Engineer interview?

Some of the top questions asked at the Kloeckner Desma Machinery Production Engineer interview -

  1. Machining parameters, Tools and fixture related questions, CNC Programming soft...read more
  2. Questions regarding working hrs, some technical questions related to Material s...read more

Tell us how to improve this page.

Kloeckner Desma Machinery Production Engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 2 Reviews and Ratings
Engineer
9 salaries
unlock blur

₹5.6 L/yr - ₹10.7 L/yr

Design Engineer
5 salaries
unlock blur

₹6 L/yr - ₹7.2 L/yr

Junior Engineer
5 salaries
unlock blur

₹3.4 L/yr - ₹5.5 L/yr

Business Development Engineer
5 salaries
unlock blur

₹8.2 L/yr - ₹9.8 L/yr

HR Officer
5 salaries
unlock blur

₹3.6 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Kloeckner Desma Machinery with

BHEL

4.1
Compare

TCS

3.7
Compare

Mahindra & Mahindra

4.1
Compare

Hindustan Unilever

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview