Filter interviews by
Troubleshooting involves identifying, analyzing, and solving problems in a systematic manner.
Identify the problem by gathering information and observing the issue
Analyze the possible causes of the problem using logical reasoning and data
Develop a plan to address the root cause of the issue
Implement the solution and test to ensure it resolves the problem
Document the troubleshooting process for future reference
A fishbone diagram, also known as Ishikawa diagram, is a visual tool used to analyze potential causes of a problem.
Also known as Ishikawa diagram
Used to analyze potential causes of a problem
Categories typically include people, process, environment, equipment, and materials
Cycle time is the total time taken to complete a process, while takt time is the time available to complete a process.
Cycle time includes both processing time and any wait time in between tasks
Takt time is calculated as available production time divided by customer demand
For example, if a production line has a cycle time of 10 minutes and a takt time of 5 minutes, it means the line can produce 2 units every 10 minutes
I applied via Referral and was interviewed in May 2019. There were 4 interview rounds.
I am excited about the opportunity to work at KIA because of the company's reputation, growth potential, and the chance to learn a new language.
I am confident in my ability to adapt and learn quickly, including picking up the local language over time.
I believe that my skills and experience in production engineering are valuable to KIA, regardless of language barriers.
I am motivated by the challenge of working in a dive...
I appeared for an interview in Dec 2016.
A two-stroke engine completes a power cycle in two strokes of the piston, while a four-stroke engine completes it in four strokes.
Two-stroke engines have a simpler design and are lighter than four-stroke engines.
Two-stroke engines have a higher power-to-weight ratio but lower fuel efficiency compared to four-stroke engines.
Four-stroke engines have separate intake, compression, power, and exhaust strokes, while two-stro...
A pictorial representation of a SI engine with valve opening, TDC, and BDC.
SI engine stands for Spark Ignition engine, which is commonly used in gasoline-powered vehicles.
Valve opening refers to the movement of the intake and exhaust valves to allow fuel-air mixture in and exhaust gases out of the combustion chamber.
TDC (Top Dead Center) is the position of the piston at the extreme top of its stroke.
BDC (Bottom Dead Ce...
I would improve the fuel efficiency of TVS motorcycles by implementing advanced engine technology.
Implementing electronic fuel injection system for better fuel management
Introducing hybrid technology for improved mileage
Optimizing aerodynamics of the motorcycle for reduced drag
Using lightweight materials for better fuel economy
I am a dedicated production engineer with a strong background in manufacturing processes and quality control.
Graduated with a degree in Mechanical Engineering
Experience working in a manufacturing plant for 3 years
Proficient in CAD software for designing production layouts
Implemented lean manufacturing principles to improve efficiency
Led a team in reducing production downtime by 20%
I appeared for an interview in Jul 2017.
I applied via Campus Placement and was interviewed before May 2020. There was 1 interview round.
I applied via Other and was interviewed in Aug 2020. There were 4 interview rounds.
Cycle time, Takt time, SBP, Indent, 7QC tools are important concepts in production engineering.
Cycle time is the time taken to complete one cycle of an operation.
Takt time is the time taken to produce one unit of a product to meet customer demand.
SBP stands for Standardized work, Built-in quality, and Process improvement.
Indent is a document used to order materials or services from suppliers.
7QC tools are a set of qual...
FOC stands for Field Oriented Control, FRDD stands for Frequency Response Double Differentiation, and FRDS stands for Frequency Response Double Summation.
FOC is a control technique used in AC motor control systems to achieve high performance.
FRDD is a mathematical technique used to analyze the frequency response of a system.
FRDS is a mathematical technique used to analyze the frequency response of a system by summing t...
Poke yoke is a Japanese term for mistake-proofing. It is a technique used to prevent errors in manufacturing processes.
Poke yoke involves designing a process or product in a way that makes it impossible to make a mistake.
It can be achieved through the use of sensors, alarms, or physical barriers.
Examples of poke yoke include car keys that can only be removed when the car is in park, or a phone charger that can only be ...
Types of audit include internal, external, financial, operational, and compliance audits.
Internal audit: conducted by company employees to evaluate internal controls and processes
External audit: conducted by independent auditors to provide an objective assessment of financial statements
Financial audit: focuses on financial statements and accounting practices
Operational audit: evaluates the efficiency and effectiveness ...
Production is the process of creating goods or services, while manufacturing is a subset of production that involves the creation of physical goods.
Production involves both goods and services, while manufacturing is limited to physical goods.
Production is a broader term that includes manufacturing, while manufacturing is a subset of production.
Manufacturing involves the use of machinery and tools to create physical goo...
I applied via Campus Placement and was interviewed before Aug 2021. There were 4 interview rounds.
20 marks objective questions for aptitude test
posted on 13 Nov 2024
I applied via Naukri.com and was interviewed before Nov 2023. There were 2 interview rounds.
posted on 11 Apr 2022
I applied via Campus Placement
based on 1 interview
Interview experience
based on 21 reviews
Rating in categories
Junior Engineer
661
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Company Trainee
391
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Assistant Manager
303
salaries
| ₹4.9 L/yr - ₹15 L/yr |
Neem Trainee
296
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Assistant Engineer
277
salaries
| ₹3.8 L/yr - ₹9.6 L/yr |
Tata Motors
Maruti Suzuki
Ashok Leyland
Hero MotoCorp