Upload Button Icon Add office photos

Filter interviews by

Keystone Infrabuild Billing Engineer Interview Questions, Process, and Tips for Freshers

Updated 21 Jun 2024

Keystone Infrabuild Billing Engineer Interview Experiences for Freshers

1 interview found

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. What is your Current Salary?
  • Q2. What is your Current Company?
  • Q3. What is your expected salary ?
  • Q4. Why are you leaving current Company ?
Round 2 - Technical 

(10 Questions)

  • Q1. What is your job role in current organization?
  • Q2. What is the deduction criteria for shuttering?
  • Ans. 

    The deduction criteria for shuttering include damaged or lost materials, excess materials, and improper installation.

    • Deductions are made for damaged or lost shuttering materials.

    • Excess materials beyond the required quantity may also lead to deductions.

    • Improper installation of shuttering can result in deductions as well.

  • Answered by AI
  • Q3. Did you create any extra item?
  • Ans. 

    Yes, I created an extra item to improve efficiency and accuracy in billing process.

    • Created a new template for billing reports to streamline the process

    • Developed a customized software tool to automate calculations and reduce errors

    • Introduced a new coding system to categorize items for easier tracking and invoicing

  • Answered by AI
  • Q4. Did you use DSR ?
  • Ans. 

    Yes, I have used DSR (Detailed Specified Rates) in my previous projects for accurate billing calculations.

    • Yes, I have used DSR to calculate the cost of materials, labor, and equipment for billing purposes.

    • DSR helps in providing a detailed breakdown of rates for different items used in construction projects.

    • Using DSR ensures transparency and accuracy in billing calculations.

    • For example, I used DSR to calculate the cost ...

  • Answered by AI
  • Q5. What is Escalation and what are the escalation components ?
  • Ans. 

    Escalation in billing refers to the increase in costs due to various factors. Components include labor, materials, equipment, overhead, and profit.

    • Escalation refers to the increase in costs of a project over time.

    • Components of escalation include labor costs, material costs, equipment costs, overhead costs, and profit margins.

    • Labor costs can escalate due to increases in wages or labor shortages.

    • Material costs can escala...

  • Answered by AI
  • Q6. What is One way Slab and Two way slab?
  • Ans. 

    One way slab is supported on two opposite sides while two way slab is supported on all four sides.

    • One way slab is designed to span in only one direction, supported on two opposite sides.

    • Two way slab is designed to span in both directions, supported on all four sides.

    • One way slab is commonly used in residential buildings, while two way slab is used in commercial buildings.

    • Examples of one way slab include balconies and v...

  • Answered by AI
  • Q7. What is Short Column and Long column?
  • Ans. 

    Short column is a column with a height less than 10 times its least lateral dimension, while long column is a column with a height more than 10 times its least lateral dimension.

    • Short column is prone to buckling due to its slenderness ratio.

    • Long column is less prone to buckling due to its higher slenderness ratio.

    • Short column is commonly used in residential buildings.

    • Long column is commonly used in high-rise buildings.

  • Answered by AI
  • Q8. Do you have experience in finishing items?
  • Ans. 

    Yes, I have experience in finishing items in previous projects.

    • I have experience in coordinating with subcontractors to ensure timely completion of finishing work.

    • I have knowledge of different finishing materials and techniques such as painting, tiling, and flooring.

    • I have successfully managed finishing schedules to meet project deadlines.

    • I have experience in quality control to ensure finishing work meets project speci

  • Answered by AI
  • Q9. Difference between Built-up area and super built-up area?
  • Ans. 

    Built-up area includes the carpet area plus the thickness of the walls, while super built-up area includes common spaces like lobby, staircase, etc.

    • Built-up area = Carpet area + thickness of walls

    • Super built-up area = Built-up area + common spaces like lobby, staircase, etc.

    • Built-up area is the area enclosed within the walls of a building, while super built-up area includes common areas shared by multiple units.

    • Super b...

  • Answered by AI
  • Q10. Where did you get the escalation rates ?
  • Ans. 

    Escalation rates are typically obtained from historical data, industry standards, and consultation with relevant stakeholders.

    • Escalation rates can be obtained from historical project data, analyzing past projects to determine trends in cost escalation.

    • Industry standards and benchmarks can also be used to determine escalation rates for different types of projects.

    • Consultation with relevant stakeholders such as suppliers...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Expect low level interview questions. If you unable to answer that question they start to try reduce your confidence and negotiate with your salary.

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Campus Placement and was interviewed before Nov 2019. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
  • Ans. 

    Escalation is the increase in cost or price of goods or services over time due to various factors.

    • Escalation is significant in construction projects where the cost of materials and labor can increase over time.

    • It is important to factor in escalation when creating project budgets and timelines.

    • The formula for escalation is: Escalated Cost = Base Cost x (1 + Escalation Rate)^Number of Years

    • For example, if the base cost o...

  • Answered by AI
  • Q2. What is the difference between penality and Liquidity damages?
  • Ans. 

    Penalty is a punishment for breach of contract while liquidity damages compensate for financial loss due to breach.

    • Penalty is a fixed amount agreed upon in the contract as a punishment for breach of contract.

    • Liquidity damages compensate for the actual financial loss suffered due to breach of contract.

    • Penalty is usually higher than the actual loss suffered while liquidity damages are calculated based on the actual loss.

    • ...

  • Answered by AI
  • Q3. What do you understand by Term Basic Price variation?
  • Ans. 

    Basic Price variation refers to the change in the cost of materials or labor used in a project.

    • Basic Price variation is a common clause in construction contracts.

    • It allows for adjustments to the contract price based on changes in the cost of materials or labor.

    • The variation can be positive or negative, depending on whether the cost has increased or decreased.

    • The variation is usually calculated using an agreed-upon form...

  • Answered by AI
  • Q4. Is Basic price variation is beneficial for a contract or not? If yes, then explain it how?
  • Ans. 

    Yes, basic price variation is beneficial for a contract.

    • Basic price variation allows for adjustments to be made to the contract price based on changes in market conditions or material costs.

    • This helps to ensure that the contractor is not unfairly burdened with unexpected costs and can maintain profitability.

    • It also provides a level of transparency and accountability in the contract, as both parties are aware of the pot...

  • Answered by AI
  • Q5. How many types of contract and their importance? What are the advantages and drawbacks of each.
  • Ans. 

    There are various types of contracts in construction projects. Each has its own advantages and drawbacks.

    • Types of contracts include lump sum, cost-plus, time and material, and unit price contracts.

    • Lump sum contracts provide a fixed price for the entire project, but can lead to disputes over changes.

    • Cost-plus contracts reimburse the contractor for all costs plus a fee, but can lead to inflated costs.

    • Time and material co...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always answer straight to the point.Di jot make a lengthy note, keep it brief unless and otherwise they ask itself.
If you don't know the answer, say No, don't trying to confuse.

Always be confident on your each answer.

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

Keystone Infrabuild Interview FAQs

How many rounds are there in Keystone Infrabuild Billing Engineer interview for freshers?
Keystone Infrabuild interview process for freshers usually has 2 rounds. The most common rounds in the Keystone Infrabuild interview process for freshers are HR and Technical.
What are the top questions asked in Keystone Infrabuild Billing Engineer interview for freshers?

Some of the top questions asked at the Keystone Infrabuild Billing Engineer interview for freshers -

  1. What is Escalation and what are the escalation component...read more
  2. What is the deduction criteria for shutteri...read more
  3. Do you have experience in finishing ite...read more

Tell us how to improve this page.

Keystone Infrabuild Billing Engineer Interview Process for Freshers

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.5k Interviews
Accenture Interview Questions
3.8
 • 8.2k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Cognizant Interview Questions
3.7
 • 5.6k Interviews
Amazon Interview Questions
4.1
 • 5k Interviews
Capgemini Interview Questions
3.7
 • 4.8k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
Genpact Interview Questions
3.8
 • 3.1k Interviews
View all

Keystone Infrabuild Billing Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

4.0

Skill development

2.0

Work-life balance

3.0

Salary

2.0

Job security

3.0

Company culture

2.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Compare Keystone Infrabuild with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview