Filter interviews by
I applied via Company Website and was interviewed in May 2022. There were 3 interview rounds.
Test syllabus are mainly focused on electronic based OMR TEST.
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.
Managing tight project deadlines and coordinating with multiple teams to ensure timely completion.
Balancing multiple projects simultaneously
Coordinating with cross-functional teams
Handling unexpected challenges and changes in project scope
I applied via Company Website and was interviewed in Oct 2022. There was 1 interview round.
Boiler is a device used to generate steam by heating water. Auxiliaries are equipment used to support the boiler.
Boiler is used in industries for various purposes such as power generation, heating, and processing.
Auxiliaries include feedwater pumps, blowdown tanks, deaerators, and economizers.
Feedwater pumps are used to supply water to the boiler, blowdown tanks are used to remove impurities from the boiler water, deae...
Hydrotest is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water or other liquid.
Hydrotest is done to ensure that the vessel or pipeline can withstand the required pressure without leaking or rupturing.
The vessel or pipeline is filled with water or other liquid and pressurized to a level higher than its maximum operating pressure.
The pressure is held for a specified...
I applied via campus placement at Zakir Husain College of Engineering and Technology, Aligarh and was interviewed before Feb 2023. There were 2 interview rounds.
It was computerized based
Technical questions and apptitude
I am not familiar with the terms kra/kpa, Monthly buying, and DWM.
I apologize, but I am not familiar with those terms.
Could you please explain what they mean?
I am willing to learn and adapt to new concepts and terminologies.
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
Leet code
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 3 interview rounds.
Consumption gap analysis involves identifying and understanding the difference between actual and desired levels of consumption.
Identify the desired level of consumption
Determine the actual level of consumption
Calculate the gap by subtracting the actual level from the desired level
Analyze the reasons for the consumption gap
Identify potential solutions to bridge the gap
Inventory gaps in a system refer to discrepancies or shortages in the quantity or availability of items.
Stockouts: When an item is out of stock and unavailable for purchase or use.
Overstocking: When there is an excess of inventory beyond what is needed or can be sold.
Obsolete inventory: Items that are no longer in demand or have become outdated.
Shrinkage: Loss of inventory due to theft, damage, or other reasons.
Lead ti...
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 5 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 3 interview rounds.
based on 2 reviews
Rating in categories
Service Engineer
5
salaries
| ₹1 L/yr - ₹2.5 L/yr |
Engineer
4
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Graduate Apprentice Trainee
4
salaries
| ₹0.9 L/yr - ₹2 L/yr |
Graduate Apprentice
4
salaries
| ₹1.1 L/yr - ₹1.1 L/yr |
ITI Fitter
3
salaries
| ₹0.8 L/yr - ₹1 L/yr |
Bharat Electronics
Hindustan Aeronautics
BHEL
TCS