Interview Questionnaire 

2 Questions

  • Q1. What are the main points will you notice during gypsum partition work?
  • Ans. 

    Main points to notice during gypsum partition work

    • Ensure proper alignment and leveling of the partition

    • Check for any cracks or damages in the gypsum boards

    • Ensure proper installation of electrical and plumbing fixtures

    • Check for proper insulation and soundproofing

    • Ensure proper finishing of joints and corners

    • Check for any gaps or spaces between the partition and the ceiling or floor

    • Ensure proper ventilation and air circul...

  • Answered by AI
  • Q2. Tell about the wall finishes and its methodology?
  • Ans. 

    Wall finishes refer to the materials used to cover and decorate interior and exterior walls.

    • Wall finishes can be categorized as paint, wallpaper, tiles, wood paneling, and stone cladding.

    • The methodology for wall finishes involves surface preparation, application of primer, and then the final finish.

    • Different types of finishes require different application techniques and tools.

    • Wall finishes also serve functional purpose...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The Interview has 2 to 3 rounds. First would be the HR round. In this round, they can ask your previous experience and general data about yourself. In Second round & Third Round, there will be technical round. For that, you can prepare basic knowledge about the commercial interior related works and its methodology and focus mainly on Quality in every aspects. Its very simple to crack the interview. All the best.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Tell me about yourself
  • Q2. What do you know about anchor bolt and how is it casted?
  • Ans. 

    Anchor bolts are used to secure objects or structures to concrete. They are typically casted by drilling a hole in the concrete and inserting the bolt with epoxy or grout.

    • Anchor bolts are commonly used in construction to secure structures like columns, beams, and equipment to concrete foundations.

    • The process of casting anchor bolts involves drilling a hole in the concrete, inserting the bolt, and then filling the hole ...

  • Answered by AI
  • Q3. How to do alignment of crane beam?
  • Ans. 

    Alignment of crane beam is done by using laser alignment tools and adjusting the bolts and shims.

    • Use laser alignment tools to check the alignment of the crane beam.

    • Adjust the bolts and shims as needed to align the beam properly.

    • Ensure that the crane beam is level and parallel to the ground for optimal performance.

  • Answered by AI
  • Q4. How much part of flashing and trim is used in overlapping?
  • Ans. 

    Flashing and trim are essential components in overlapping to ensure proper waterproofing and protection against elements.

    • Flashing and trim are crucial for preventing water infiltration at joints and intersections.

    • Proper overlapping of flashing and trim is necessary to create a watertight seal.

    • Examples of overlapping include step flashing at roof-wall intersections and counter flashing over base flashing.

    • Incorrect overl

  • Answered by AI
  • Q5. Do you know about SSR roof sheeting?
  • Ans. 

    SSR roof sheeting is a type of metal roofing material commonly used in construction projects.

    • SSR stands for Structural Standing Seam Roofing

    • It is a popular choice for commercial and industrial buildings due to its durability and weather resistance

    • SSR roof sheeting is typically made of materials like steel, aluminum, or copper

    • The standing seams on SSR roof sheeting provide added strength and help prevent leaks

  • Answered by AI
  • Q6. Why do you want to join Smith and why should we hire you?
  • Q7. What is expected CTC?
  • Ans. 

    Expected CTC is negotiable based on the candidate's experience, skills, and the company's budget.

    • Expected CTC depends on the candidate's level of experience and skills.

    • It also depends on the company's budget and industry standards.

    • Candidates can research average salaries for similar roles in the industry to get an idea of the expected CTC.

    • Negotiation skills can also play a role in determining the final CTC offer.

  • Answered by AI
  • Q8. What is your notice period?
  • Q9. Tell me something about your previous company?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare and confident.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. General questions about interior work and all types of mep work
  • Q2. How much you onow about mep
  • Q3. All mep related work generally knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Working culture is very good Hr and all other team is very supportive
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Interior comercial project management
  • Q2. Site exicution work
  • Q3. Site fit out work
  • Q4. Site coordination work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Tell me about yourself
  • Q2. What do you know about anchor bolt and how is it casted?
  • Ans. 

    Anchor bolts are used to secure objects or structures to concrete. They are typically casted by drilling a hole in the concrete and inserting the bolt with epoxy or grout.

    • Anchor bolts are commonly used in construction to secure structures like columns, beams, and equipment to concrete foundations.

    • The process of casting anchor bolts involves drilling a hole in the concrete, inserting the bolt, and then filling the hole ...

  • Answered by AI
  • Q3. How to do alignment of crane beam?
  • Ans. 

    Alignment of crane beam is done by using laser alignment tools and adjusting the bolts and shims.

    • Use laser alignment tools to check the alignment of the crane beam.

    • Adjust the bolts and shims as needed to align the beam properly.

    • Ensure that the crane beam is level and parallel to the ground for optimal performance.

  • Answered by AI
  • Q4. How much part of flashing and trim is used in overlapping?
  • Ans. 

    Flashing and trim are essential components in overlapping to ensure proper waterproofing and protection against elements.

    • Flashing and trim are crucial for preventing water infiltration at joints and intersections.

    • Proper overlapping of flashing and trim is necessary to create a watertight seal.

    • Examples of overlapping include step flashing at roof-wall intersections and counter flashing over base flashing.

    • Incorrect overl

  • Answered by AI
  • Q5. Do you know about SSR roof sheeting?
  • Ans. 

    SSR roof sheeting is a type of metal roofing material commonly used in construction projects.

    • SSR stands for Structural Standing Seam Roofing

    • It is a popular choice for commercial and industrial buildings due to its durability and weather resistance

    • SSR roof sheeting is typically made of materials like steel, aluminum, or copper

    • The standing seams on SSR roof sheeting provide added strength and help prevent leaks

  • Answered by AI
  • Q6. Why do you want to join Smith and why should we hire you?
  • Q7. What is expected CTC?
  • Ans. 

    Expected CTC is negotiable based on the candidate's experience, skills, and the company's budget.

    • Expected CTC depends on the candidate's level of experience and skills.

    • It also depends on the company's budget and industry standards.

    • Candidates can research average salaries for similar roles in the industry to get an idea of the expected CTC.

    • Negotiation skills can also play a role in determining the final CTC offer.

  • Answered by AI
  • Q8. What is your notice period?
  • Q9. Tell me something about your previous company?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare and confident.

I applied via Referral and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Day light pannel fixing details in SSR sheet
  • Ans. 

    Daylight panel fixing details in SSR sheet

    • SSR sheet is a type of roofing sheet used for industrial and commercial buildings

    • Daylight panels are used to allow natural light into the building

    • Fixing details include the type of fasteners used and the spacing between them

    • Proper installation is important to prevent leaks and ensure structural integrity

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just go with technical sound and patience.

Keechery Engineering Company Interview FAQs

How to prepare for Keechery Engineering Company Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Keechery Engineering Company. The most common topics and skills that interviewers at Keechery Engineering Company expect are Project Engineering, AutoCAD, Civil, Civil Engineering and Construction.
What are the top questions asked in Keechery Engineering Company Project Engineer interview?

Some of the top questions asked at the Keechery Engineering Company Project Engineer interview -

  1. What are the main points will you notice during gypsum partition wo...read more
  2. Tell about the wall finishes and its methodolo...read more

Tell us how to improve this page.

Keechery Engineering Company Project Engineer Salary
based on 10 salaries
₹2 L/yr - ₹3.5 L/yr
54% less than the average Project Engineer Salary in India
View more details

Keechery Engineering Company Project Engineer Reviews and Ratings

based on 5 reviews

3.8/5

Rating in categories

4.4

Skill development

2.3

Work-life balance

3.6

Salary

4.0

Job security

3.2

Company culture

3.6

Promotions

3.4

Work satisfaction

Explore 5 Reviews and Ratings
Project Engineer
10 salaries
unlock blur

₹2 L/yr - ₹3.5 L/yr

MEP Engineer
5 salaries
unlock blur

₹2.9 L/yr - ₹3 L/yr

Architect
4 salaries
unlock blur

₹2.4 L/yr - ₹4.8 L/yr

Marketing Executive
4 salaries
unlock blur

₹2.6 L/yr - ₹5 L/yr

Account Assistant
4 salaries
unlock blur

₹2.1 L/yr - ₹2.7 L/yr

Explore more salaries
Compare Keechery Engineering Company with

Larsen & Toubro Limited

4.0
Compare

Tata Group

4.2
Compare

BHEL

4.1
Compare

Thermax Limited

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview