Premium Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International

Compare button icon Compare button icon Compare
4.1

based on 3.5k Reviews

Filter interviews by

KEC International Planning & Billing Engineer Interview Questions and Answers for Experienced

Updated 10 Apr 2022

KEC International Planning & Billing Engineer Interview Experiences for Experienced

1 interview found

I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Subject related question
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Subject related expertise, confidence and good previous background with all company relieving letters will be required. Rest interview process is not that difficult.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Shuttering quantity calculation
  • Ans. 

    Shuttering quantity calculation involves determining the amount of formwork needed for a construction project.

    • Calculate the surface area of the structure that needs formwork

    • Determine the type of formwork material to be used

    • Consider the complexity of the structure and any special requirements

    • Account for wastage and extra material for safety

    • Use standard formulas or software for accurate calculations

  • Answered by AI
  • Q2. Concrete quantity calculation

Interview Preparation Tips

Interview preparation tips for other job seekers - Go to interview with full preparation.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Site Engineer 

(5 Questions)

  • Q1. Building construction site
  • Q2. Civil engineering building construction
  • Q3. Building constructions road
  • Q4. Sayan Choudhury
  • Q5. Civil work surveying🛣️

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Site & Billing Engineer interview:
  • Capital Goods
  • Civil Engineering
  • Site Engineering
  • Building Construction
  • Commercial Buildings
Interview preparation tips for other job seekers - Civil engineering

Site Engineer , civil work, Building construction,
site supervisors experience metro project Bumbai Root project Engineer consultancy private limited Company experience building construction site Engineer metro project, site supervisor , and leveling Survey Topic - BS, IS, FS, RL, HI, BM, TBM , value with rise and fall method
Survey
Instruments Name- Auto Leveling
interdisciplinary knowledge.learn practical application of theoretical knowledge on any subject and enables a deep learning experience.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Extra items and substitute items
  • Q2. Earth cutting as per cpwd norms
  • Ans. 

    Earth cutting as per CPWD norms involves following specific guidelines for excavation work.

    • CPWD norms specify the depth and width of excavation for different types of soil

    • The guidelines also include safety measures to be followed during earth cutting

    • Proper disposal of excavated material is also a key aspect of CPWD norms

  • Answered by AI
  • Q3. All kinds of deduction done in measurements
  • Ans. 

    Deductions in measurements include shrinkage, wastage, breakage, and spillage.

    • Shrinkage: Reduction in size or weight of materials during handling or storage.

    • Wastage: Loss of materials during the construction process.

    • Breakage: Damage to materials during transportation or handling.

    • Spillage: Accidental loss of materials due to spills or leaks.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. How many years experience do you about working execution ?
  • Q2. How many years experience do you have about clients billing.

Interview Preparation Tips

Interview preparation tips for other job seekers - You have practical knowledge & theoretical knowledge about works.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding of subcontractor Billing
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Detailing about method of measurement, mode of measurement, cash flow, budget etc.
Round 3 - HR 

(1 Question)

  • Q1. Discussion regarding my present remuneration and expected for new assignment.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be careful for optimum out knowledge as well as practical knowledge.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Knowledge of BBS, Drawing Reading skills, autocad, and SAP software knowledge, only answer those questions which you answered very well, don't give any forged answer which you don't know.
Round 2 - HR 

(1 Question)

  • Q1. Good in communication (English language is not mandatory) but when ask to answer in then answer in English.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the labour charges for main item like concrete, Shuttering & Rainforcement steel?
  • Ans. 

    The labor charges for main items like concrete, shuttering, and reinforcement steel vary depending on factors such as location, project size, and labor rates.

    • The labor charges for concrete are typically calculated based on the volume of concrete required and the prevailing labor rates.

    • The labor charges for shuttering (formwork) are usually determined based on the area of formwork required and the complexity of the desi...

  • Answered by AI
  • Q2. What is rolling margin?
  • Ans. 

    Rolling margin is a financial metric that measures the profitability of a company's operations over a specific period of time.

    • Rolling margin is calculated by dividing the operating profit by the net sales and expressing it as a percentage.

    • It helps in evaluating the efficiency and profitability of a company's core business activities.

    • A higher rolling margin indicates better profitability and operational efficiency.

    • For e...

  • Answered by AI
  • Q3. What is the allowable Wastage percentage of major item?
  • Ans. 

    The allowable wastage percentage of a major item varies depending on the industry and project specifications.

    • The allowable wastage percentage is typically specified in the project contract or specifications.

    • It is important to minimize wastage to control costs and ensure efficient resource utilization.

    • The allowable wastage percentage may differ for different major items, such as concrete, steel, or electrical materials.

    • ...

  • Answered by AI

I applied via Walk-in and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Prepare BBS sheet , study a drawing and calculate the Quantity Details , about Contractors Billing, preparing Daily and monthly progress report,Study the Drawing and BOQ preparation and raising the materi...

Interview Preparation Tips

Topics to prepare for G R Infraprojects Billing Engineer interview:
  • Billing
Interview preparation tips for other job seekers - Don’t worry.They are Very Friendly. If you don’t know the answer of any questions then tell them. They will give you the answer.

KEC International Interview FAQs

How many rounds are there in KEC International Planning & Billing Engineer interview for experienced candidates?
KEC International interview process for experienced candidates usually has 2 rounds. The most common rounds in the KEC International interview process for experienced candidates are One-on-one Round and HR.
How to prepare for KEC International Planning & Billing Engineer interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEC International. The most common topics and skills that interviewers at KEC International expect are Billing Engineering, Budget Analysis, MS Project, Planning Engineering and Project Planning.

Tell us how to improve this page.

Join KEC International Building Infrastructure for the World of Tomorrow

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 687 Interviews
Siemens Interview Questions
4.1
 • 419 Interviews
Tata Projects Interview Questions
4.3
 • 397 Interviews
Thermax Limited Interview Questions
4.2
 • 234 Interviews
ABB Interview Questions
4.1
 • 224 Interviews
Dilip Buildcon Interview Questions
4.0
 • 138 Interviews
View all
KEC International Planning & Billing Engineer Salary
based on 47 salaries
₹4 L/yr - ₹10.4 L/yr
28% more than the average Planning & Billing Engineer Salary in India
View more details

KEC International Planning & Billing Engineer Reviews and Ratings

based on 10 reviews

4.0/5

Rating in categories

4.0

Skill development

3.4

Work-Life balance

4.0

Salary & Benefits

4.2

Job Security

3.5

Company culture

3.6

Promotions/Appraisal

3.9

Work Satisfaction

Explore 10 Reviews and Ratings
Assistant Manager
646 salaries
unlock blur

₹5.2 L/yr - ₹20 L/yr

Senior Engineer
437 salaries
unlock blur

₹4.3 L/yr - ₹13 L/yr

Civil Engineer
226 salaries
unlock blur

₹1 L/yr - ₹9.5 L/yr

Project Engineer
217 salaries
unlock blur

₹3 L/yr - ₹11 L/yr

Safety Officer
208 salaries
unlock blur

₹2 L/yr - ₹9 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview