Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.
Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.
The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.
The operation of the batching plant involves loading the ingredients into the hopper...
I applied via Company Website and was interviewed before Apr 2021. There were 7 interview rounds.
Accident, incident
Any hazardous
Any near miss
HIRA
I applied via Naukri.com and was interviewed in Dec 2017. There were 4 interview rounds.
Experienced safety officer with a background in industrial safety protocols and emergency response procedures.
Over 5 years of experience in implementing safety measures in industrial settings
Proficient in conducting safety audits and inspections to ensure compliance with regulations
Skilled in developing and implementing safety training programs for employees
Strong knowledge of emergency response protocols and procedure...
Safety Officers are responsible for ensuring the safety of employees in the workplace by implementing safety protocols and procedures.
Develop and implement safety policies and procedures
Conduct regular safety inspections and audits
Investigate accidents and incidents to determine root causes
Provide safety training to employees
Ensure compliance with safety regulations and standards
Maintain safety records and reports
posted on 12 Jun 2020
I applied via Referral and was interviewed before Feb 2021. There was 1 interview round.
I appeared for an interview in Dec 2021.
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 2 interview rounds.
Precautions for working at height include proper training, use of fall protection equipment, regular inspection of equipment, and securing tools and materials.
Ensure workers are properly trained on working at height procedures
Use appropriate fall protection equipment such as harnesses, lanyards, and guardrails
Regularly inspect all equipment used for working at height to ensure it is in good condition
Secure tools and ma...
A lifting plan is a detailed document outlining the procedures and precautions to be taken when lifting heavy objects.
A lifting plan should include the weight of the object being lifted
It should specify the equipment to be used for lifting
The plan should outline the steps to be taken to ensure the safety of workers involved
It should also consider factors such as the location of the lift and any potential hazards
Regular...
Risk assessment is the process of identifying, analyzing, and evaluating potential risks in order to determine the likelihood and impact of harmful events.
Identifying potential hazards and risks in the workplace or environment
Analyzing the likelihood of these risks occurring
Evaluating the potential impact of these risks on people, property, and the environment
Developing strategies to mitigate or eliminate these risks
Re...
Capacity of wire rope sling can be calculated by considering factors like diameter, material, and configuration.
Capacity is determined by the breaking strength of the wire rope and the design factor used.
Calculate the breaking strength of the wire rope by multiplying the area of the rope cross-section by the tensile strength of the material.
Consider the configuration of the sling (single leg, double leg, etc.) and appl...
The procedure for welding different materials involves selecting the appropriate welding method, preparing the materials, and ensuring proper joint design and welding parameters.
Identify the materials to be welded and determine the compatibility of their properties.
Select the appropriate welding method based on the materials and desired joint strength.
Prepare the materials by cleaning, removing any contaminants, and en...
Some of the top questions asked at the KEC International OHE Supervisor interview for freshers -
based on 16 reviews
Rating in categories
Assistant Manager
659
salaries
| ₹5.2 L/yr - ₹20 L/yr |
Senior Engineer
453
salaries
| ₹4.3 L/yr - ₹14 L/yr |
Civil Engineer
220
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Safety Officer
191
salaries
| ₹1.8 L/yr - ₹8 L/yr |
Engineer
187
salaries
| ₹2.5 L/yr - ₹10 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Kalpataru Projects International