I applied via Referral and was interviewed before Aug 2021. There were 3 interview rounds.
Easy mathematics questions about decimal, matric units, computer related questions,about least count and som easy geometric questions.
Questions related to welding, galvanizing process, CNC machines, melting point of iron, tolerance, and 5S.
Arc welding uses an electric arc to melt and join metals, while MIG welding uses a wire electrode to join metals.
Galvanizing is the process of coating steel or iron with a layer of zinc to prevent rusting.
CNC machines use computer programs to control the movement of tools and machinery.
The melting point of iron is ...
Top trending discussions
posted on 22 Feb 2022
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
I will implement ISO systems by conducting a gap analysis, creating a plan, and providing training to site engineers.
Conduct a gap analysis to identify areas of improvement
Create a plan to implement ISO systems
Provide training to site engineers on ISO standards and quality improvements
Establish a system for monitoring and measuring quality performance
Encourage continuous improvement through regular audits and reviews
The minimum time for concrete to gain strength is typically 28 days.
Concrete typically gains strength over time, with significant strength achieved after 28 days.
Factors such as mix design, curing conditions, and environmental factors can affect the rate of strength gain.
Testing is often done at various intervals to monitor the strength development of concrete.
Early strength concrete mixes are available for projects re
I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.
based on 2 reviews
Rating in categories
Quality Engineer
67
salaries
| ₹1.5 L/yr - ₹4.1 L/yr |
Production Engineer
53
salaries
| ₹1.2 L/yr - ₹4.8 L/yr |
Assistant Manager
33
salaries
| ₹4.8 L/yr - ₹9 L/yr |
Graduate Engineer Trainee (Get)
17
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Safety Officer
16
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Ramky Infrastructure
L & W Constructions