To make TDS report month wise, organize data by month and calculate total TDS for each month.
Organize TDS data by month
Calculate total TDS for each month
Generate report showing TDS for each month
Top trending discussions
posted on 3 May 2023
posted on 27 Sep 2023
Technical quesgions were asked
posted on 12 Oct 2023
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.
Quality lab and site test of concrete involves testing the strength, durability, and consistency of concrete samples.
Quality lab tests include compressive strength test, slump test, air content test, and temperature test.
Site tests involve sampling concrete from the construction site, conducting field tests like slump test and air content test, and monitoring curing conditions.
Quality engineers ensure that concrete mee...
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
ASME codes are widely used in the oil and gas industry to ensure safety and quality standards are met.
ASME B31.3 is the code for process piping in oil and gas facilities
ASME Section VIII is used for pressure vessels in oil and gas industry
ASME B31.4 is for liquid pipelines in oil and gas industry
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
posted on 29 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Quality Engineer
67
salaries
| ₹1.5 L/yr - ₹4.1 L/yr |
Production Engineer
52
salaries
| ₹1.2 L/yr - ₹4.8 L/yr |
Assistant Manager
30
salaries
| ₹4.8 L/yr - ₹9 L/yr |
Graduate Engineer Trainee (Get)
17
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Safety Officer
16
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Ramky Infrastructure
L & W Constructions