Filter interviews by
I applied via Walk-in and was interviewed in Aug 2022. There were 3 interview rounds.
Top trending discussions
posted on 15 Mar 2023
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Formulas are essential for design calculations in formwork engineering.
Formwork pressure calculation: P = γ * h
Formwork design load calculation: W = P * A
Formwork lateral pressure calculation: PL = 0.5 * γ * h^2
Formwork tie spacing calculation: S = L / n
Formwork concrete pressure calculation: Pc = γc * h
Formwork vertical load calculation: V = W + Pc
Formwork systems include timber, steel, and aluminum forms, each with different capacities and limitations.
Timber formwork is versatile but has limited reuse and requires skilled labor for assembly.
Steel formwork is durable and can be reused multiple times, but is heavy and expensive.
Aluminum formwork is lightweight, easy to handle, and can be reused many times, but is costly upfront.
Each formwork system has specific l...
posted on 22 Dec 2024
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
BBS in construction stands for Bar Bending Schedule.
BBS is a document that provides details about the reinforcement steel bars used in a construction project.
It includes information about the size, shape, quantity, and placement of the bars.
BBS helps in estimating the required amount of steel, planning the cutting and bending of bars, and ensuring proper reinforcement in the structure.
Example: BBS for a column may spec...
Mix ratio M 25 is a concrete mix design that consists of 1 part cement, 1 part fine aggregate, and 2 parts coarse aggregate.
M 25 mix ratio is commonly used in construction for structural applications.
The mix ratio represents the proportions of different materials used in the concrete mix.
For M 25, the ratio is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone chips or g...
The number of zones in a u grider varies depending on the specific design and requirements.
The number of zones in a u grider can range from 1 to multiple zones.
Zones are typically created to divide the grider into sections for better load distribution and structural stability.
The number of zones may be determined by factors such as the length and span of the grider, the load it needs to support, and the design specific...
To calculate zone A, zone B, and zone C, you need to know the total area and the dimensions of each zone.
Determine the total area of the site
Calculate the area of zone A by subtracting the combined area of zones B and C from the total area
Calculate the area of zone B using the given dimension
Calculate the area of zone C by subtracting the area of zone B from the total area
Ensure the units of measurement are consistent
Working at heights requires proper safety measures and equipment.
Use appropriate safety harnesses and fall protection systems.
Ensure scaffolding and ladders are secure and stable.
Follow safety guidelines and regulations.
Provide proper training to workers on working at heights.
Regularly inspect and maintain equipment and tools.
Implement safety barriers and guardrails.
Use aerial lifts or platforms for safe access to elev...
I behave as a civil engineer by being professional, organized, and detail-oriented.
I maintain a professional demeanor at all times, treating colleagues and clients with respect.
I am organized in my work, keeping track of project timelines, budgets, and resources.
I pay attention to details, ensuring accuracy in calculations, measurements, and documentation.
I communicate effectively with team members, subcontractors, and...
posted on 28 Apr 2022
I was interviewed in Oct 2021.
posted on 15 Mar 2023
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
Formwork refers to the temporary or permanent molds used to hold wet concrete until it sets and hardens.
Timber formwork: made of wood and commonly used for small to medium-sized projects
Steel formwork: made of steel plates and commonly used for large-scale projects
Aluminum formwork: made of aluminum panels and commonly used for high-rise buildings
Plastic formwork: made of lightweight plastic and commonly used for small...
The formwork system used depends on the specific project requirements and constraints.
Different types of formwork systems include traditional timber formwork, steel formwork, aluminum formwork, and modular formwork.
Traditional timber formwork is commonly used for small-scale projects and is cost-effective.
Steel formwork is durable and suitable for large-scale projects with repetitive structures.
Aluminum formwork is lig...
Load bearing cuplock is a type of scaffolding system used in construction to support heavy loads.
Load bearing cuplock is a versatile and efficient scaffolding system.
It consists of vertical standards with cup joints and horizontal ledgers that are connected using captive wedges.
The cup joints allow for quick and easy assembly and disassembly of the system.
Load bearing cuplock can support heavy loads and is commonly use...
posted on 15 Jul 2017
I was interviewed in May 2018.
There are 25.4 millimeters in 1 inch.
1 inch is equal to 25.4 millimeters.
The conversion factor from inches to millimeters is 25.4.
To convert inches to millimeters, multiply the number of inches by 25.4.
For example, 2 inches is equal to 50.8 millimeters (2 x 25.4).
There are 1000 millimeters in 1 meter.
1 meter is equal to 1000 millimeters.
The conversion factor from meters to millimeters is 1000.
To convert meters to millimeters, multiply the length in meters by 1000.
I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.
The pour sequence refers to the order in which concrete is poured into formwork during construction.
The pour sequence is determined based on the design requirements, structural considerations, and weather conditions.
It is important to follow the pour sequence to ensure proper curing and strength of the concrete.
For example, in a multi-story building construction, the pour sequence may start from the bottom floors and w...
U-girder is a type of precast concrete girder used in bridge construction.
U-girders are shaped like the letter 'U' and are commonly used in bridge projects.
They are precast off-site and transported to the construction site for installation.
U-girders provide structural support and are often used in combination with other bridge components.
They are designed to distribute the load of the bridge deck and traffic to the bri
Interview experience
based on 5 reviews
Rating in categories
Deputy Manager
606
salaries
| ₹5.1 L/yr - ₹18 L/yr |
Assistant Manager
524
salaries
| ₹3.8 L/yr - ₹14.8 L/yr |
Senior Engineer
522
salaries
| ₹3.4 L/yr - ₹10.6 L/yr |
Civil Engineer
247
salaries
| ₹2 L/yr - ₹7.7 L/yr |
Manager
242
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power