Upload Button Icon Add office photos

Filter interviews by

Jyoti Power Corporation Pvt.Ltd. Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. About Experience
  • Q2. JD Description and Capabilities
  • Q3. Manufacturing Experience
Round 2 - Technical 

(4 Questions)

  • Q1. Solar Power Quality Question
  • Q2. Manufacturing process and fundamentals
  • Q3. Service process
  • Q4. Complaint handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and share your work experience fluently.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about your self
  • Ans. 

    I am a dedicated Mechanical Engineer with a strong background in designing and implementing mechanical systems.

    • Graduated with a degree in Mechanical Engineering from XYZ University

    • Experienced in CAD software such as AutoCAD and SolidWorks

    • Worked on projects involving HVAC systems and industrial machinery

    • Skilled in analyzing and solving complex engineering problems

    • Strong communication and teamwork skills

  • Answered by AI
  • Q2. How many experience you have in Boiler Turbine,ESP,BAG FILTER EPCI
  • Ans. 

    I have 5 years of experience in Boiler Turbine, ESP, and BAG FILTER EPCI projects.

    • 5 years of experience in Boiler Turbine projects

    • Familiar with ESP (Electrostatic Precipitator) systems

    • Proficient in BAG FILTER EPCI (Engineering, Procurement, Construction, and Installation)

    • Managed various projects involving Boiler Turbine, ESP, and BAG FILTER systems

    • Implemented cost-effective solutions for improving efficiency

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. ERECTION PROCESS OF BOILER ?
  • Ans. 

    The erection process of a boiler involves assembling and installing all the components to create a functional boiler system.

    • Prepare the foundation for the boiler

    • Assemble the boiler components such as tubes, drums, and headers

    • Install the boiler on the foundation

    • Connect the necessary piping and valves

    • Test the boiler for proper functioning

  • Answered by AI
  • Q2. Material specification of all boiler pressure part.
  • Ans. 

    Boiler pressure parts are typically made of carbon steel, alloy steel, or stainless steel to withstand high pressure and temperature.

    • Carbon steel is commonly used for lower pressure boilers

    • Alloy steel is used for higher pressure boilers

    • Stainless steel is used for corrosion resistance in boilers

    • Materials must meet specific standards like ASTM A516 for carbon steel

  • Answered by AI
  • Q3. Which welding process used in water wall panel
  • Ans. 

    The welding process used in water wall panels is typically TIG welding.

    • TIG welding is commonly used for water wall panels due to its precision and clean welds

    • TIG welding helps prevent contamination in the weld area, which is crucial for water wall panels

    • Other welding processes like MIG welding or submerged arc welding may also be used depending on the specific requirements

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Design Test 

(2 Questions)

  • Q1. What are the functions and applications of SCADA systems?
  • Ans. 

    SCADA systems are used for monitoring, controlling, and managing industrial processes through centralized systems.

    • Monitor and control industrial processes in real-time

    • Collect and analyze data from sensors and equipment

    • Provide alarms and notifications for abnormal conditions

    • Remote access and control of processes

    • Historical data logging and reporting

    • Examples: monitoring oil pipelines, controlling power plants, managing wa

  • Answered by AI
  • Q2. What is RF network communication?
  • Ans. 

    RF network communication is a wireless communication technology that uses radio frequency signals to transmit data between devices.

    • RF network communication allows devices to communicate wirelessly over long distances.

    • It is commonly used in applications such as remote monitoring, control systems, and IoT devices.

    • RF signals can be affected by interference, obstacles, and distance, so proper planning and design are import...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What amount of money is required?
  • Q2. What is the location required for the position?

General Manager - Quality Management Interview Questions & Answers

Doosan Power Systems user image Karunanithy Posanguraja

posted on 20 Nov 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

Relevant area synapses of preparation through PPT

Round 2 - Technical 

(2 Questions)

  • Q1. Relevant field with the technical
  • Q2. Experience in relevant previously work areaS
Round 3 - HR 

(2 Questions)

  • Q1. Salary Part with negotiation
  • Q2. Medical check up

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare your present work areas with experience
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is the process of configuring a new Juniper switch?
  • Q2. What are the series of Juniper device?
  • Q3. What is IP address and mac address, what are the difference between them?
  • Q4. What is lan and vlan?
  • Q5. How we check the status Juniper switch port?

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not join this company, they don't value the employee.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via AmbitionBox

Round 1 - HR 

(3 Questions)

  • Q1. Production related question ask
  • Q2. Equipment maintenance related question ask
  • Q3. Handle manpower
Round 2 - HR 

(2 Questions)

  • Q1. Production related question ask
  • Q2. Equipment maintenance related question ask

Interview Preparation Tips

Interview preparation tips for other job seekers - Emmvee photovoltaic power very good company
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is electrical
  • Ans. 

    Electrical refers to anything related to electricity, including the generation, distribution, and use of electrical power.

    • Electrical systems involve the flow of electrons through conductors.

    • Electricity can be generated from various sources such as coal, natural gas, nuclear, and renewable energy.

    • Electrical components include wires, switches, circuit breakers, and transformers.

    • Electricians are professionals who work wit...

  • Answered by AI
  • Q2. What is joint box
  • Ans. 

    A joint box is a container used to connect and protect electrical wires or cables.

    • Used in electrical installations to house wire connections

    • Helps to organize and protect wires

    • Commonly made of plastic or metal

    • Examples: junction box, electrical enclosure

  • Answered by AI
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(5 Questions)

  • Q1. Accounting taxation
  • Q2. Balance sheet related questions
  • Q3. P&L related questions
  • Q4. Banking related
  • Q5. Any other questions
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about your self?
  • Q2. Explain your technical competence?
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. PLC BLOCK DIAGRAM
  • Q2. Communication types

Interview Preparation Tips

Interview preparation tips for other job seekers - They are asking fresher related questions to experience personal.they require scientist on 25% increment.
HOD level persons have less experience working on field.

Tell us how to improve this page.

Interview Questions from Similar Companies

ReNew Interview Questions
4.2
 • 85 Interviews
Vestas Interview Questions
4.3
 • 82 Interviews
Jakson Group Interview Questions
4.3
 • 77 Interviews
Siemens Energy Interview Questions
4.1
 • 73 Interviews
Waaree Energies Interview Questions
3.9
 • 57 Interviews
Inox Wind Interview Questions
3.7
 • 37 Interviews
Sterlite Power Interview Questions
4.0
 • 25 Interviews
View all

Jyoti Power Corporation Pvt.Ltd. Reviews and Ratings

based on 6 reviews

4.3/5

Rating in categories

3.9

Skill development

3.9

Work-life balance

3.9

Salary

3.6

Job security

3.6

Company culture

2.4

Promotions

3.6

Work satisfaction

Explore 6 Reviews and Ratings
Compare Jyoti Power Corporation Pvt.Ltd. with

Jakson Group

4.3
Compare

ReNew

4.2
Compare

Vestas

4.3
Compare

Adani Green Energy

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview