Filter interviews by
posted on 4 Sep 2024
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
JTEKT interview questions for popular designations
25 optional questions
Get interview-ready with Top JTEKT Interview Questions
I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.
Quality circle of last financial year.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
Torque is a twisting force that causes rotation, while force is a push or pull that causes an object to move or change direction.
Torque is measured in units of force multiplied by distance, such as newton-meters or pound-feet.
Force is measured in units of mass multiplied by acceleration, such as newtons or pounds.
Torque is important in rotating machinery, such as engines and motors.
Force is important in many applicatio...
Assembly line processing is a manufacturing process where a product is assembled in a sequential manner by different workers or machines.
It involves dividing the production process into smaller tasks
Each worker or machine performs a specific task in a sequential manner
The product moves from one station to another until it is completed
It increases efficiency and reduces production time and cost
Examples include automobil...
TSV stands for Test Specification and Verification. Testing process involves planning, designing, executing and reporting tests.
TSV is a document that outlines the testing requirements and procedures
Testing process involves identifying test scenarios and cases
Test cases are executed and results are recorded
Defects are reported and retested until resolved
Final test report is generated
Take time, cycle time, and lead time are important metrics in production engineering.
Take time is the time required to complete a single unit of production.
Cycle time is the time required to complete a single step in the production process.
Lead time is the time required to complete an entire production process from start to finish.
Reducing cycle time can increase production efficiency.
Reducing lead time can improve cus...
OEE stands for Overall Equipment Effectiveness and PPLH stands for Production Per Labor Hour.
OEE is a metric used to measure the efficiency of manufacturing processes.
It takes into account three factors: availability, performance, and quality.
PPLH is a metric used to measure the productivity of labor in manufacturing processes.
It is calculated by dividing the total production output by the total labor hours.
Both OEE an...
Line balancing is the process of optimizing workloads across a production line. Loss cycle time refers to the time lost due to inefficiencies in the production process.
Line balancing involves analyzing the production process to ensure that each workstation is being utilized efficiently
The goal of line balancing is to minimize idle time and maximize productivity
Loss cycle time refers to the time lost due to factors such...
TPM stands for Total Productive Maintenance and TQM stands for Total Quality Management.
TPM is a maintenance program that aims to maximize equipment effectiveness and minimize downtime.
TQM is a management approach that focuses on continuous improvement of product quality and customer satisfaction.
TPM involves all employees in the maintenance process and emphasizes preventive maintenance.
TQM involves all employees in th...
JH and JH steps are quality control methodologies used in manufacturing. 5S is a workplace organization method.
JH stands for Job Handling and JH steps are a set of procedures used to ensure quality control in manufacturing processes.
5S is a workplace organization method that involves sorting, simplifying, sweeping, standardizing, and sustaining.
JH steps and 5S are often used together to improve efficiency and quality i
FIFO and LIFO are inventory management methods used to manage stock and determine the cost of goods sold.
FIFO stands for First-In, First-Out, which means that the first items purchased are the first items sold.
LIFO stands for Last-In, First-Out, which means that the last items purchased are the first items sold.
FIFO is commonly used in industries where perishable goods are sold, such as food and beverage.
LIFO is common...
FRL unit is a filter, regulator, and lubricator unit used in compressed air systems. Solenoid valves are electromechanical valves used to control the flow of fluids.
FRL unit is used to filter, regulate, and lubricate compressed air in pneumatic systems
Solenoid valves are used to control the flow of fluids in various applications
Solenoid valves are electromechanical valves that use an electric current to control the val...
I appeared for an interview before Mar 2024, where I was asked the following questions.
My goal is to enhance supply chain efficiency and foster strong supplier relationships to drive business growth.
Develop strategic partnerships with key suppliers to ensure reliability and quality.
Implement data-driven decision-making to optimize purchasing processes, such as using analytics to forecast demand.
Continuously seek cost-saving opportunities without compromising quality, like negotiating better terms with ex...
Compliance rules ensure that businesses adhere to laws and regulations in their operations, particularly in EXIM activities.
Compliance rules vary by country and industry, e.g., export licensing requirements in the U.S.
They include regulations like the Export Administration Regulations (EAR) and International Traffic in Arms Regulations (ITAR).
Non-compliance can lead to severe penalties, including fines and restrictions...
I seek new challenges and opportunities for growth that align with my career goals and aspirations in the EXIM purchase sector.
Desire for professional growth: I want to expand my skills and take on more responsibilities, such as leading a team in EXIM operations.
Seeking a dynamic work environment: My current organization has become stagnant, and I thrive in fast-paced settings that encourage innovation.
Alignment with c...
Top trending discussions
The duration of JTEKT interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 21 interviews
Interview experience
Diploma Trainee Engineer
283
salaries
| ₹1.1 L/yr - ₹3 L/yr |
Junior Engineer
262
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Assistant Manager
182
salaries
| ₹5.7 L/yr - ₹12 L/yr |
Section Engineer
173
salaries
| ₹3.5 L/yr - ₹7.4 L/yr |
Production Engineer
150
salaries
| ₹1.4 L/yr - ₹6.5 L/yr |
Bosch
Faurecia
Hitachi Astemo
Valeo