Q1. What's is take time cycle time and lead time
Take time, cycle time, and lead time are important metrics in production engineering.
Take time is the time required to complete a single unit of production.
Cycle time is the time required to complete a single step in the production process.
Lead time is the time required to complete an entire production process from start to finish.
Reducing cycle time can increase production efficiency.
Reducing lead time can improve customer satisfaction.
Take time is often used to calculate cy...read more
Q2. What's is torque and force
Torque is a twisting force that causes rotation, while force is a push or pull that causes an object to move or change direction.
Torque is measured in units of force multiplied by distance, such as newton-meters or pound-feet.
Force is measured in units of mass multiplied by acceleration, such as newtons or pounds.
Torque is important in rotating machinery, such as engines and motors.
Force is important in many applications, such as lifting heavy objects or pushing a car.
Both to...read more
Q3. What's is line balancing and loss cycle time
Line balancing is the process of optimizing workloads across a production line. Loss cycle time refers to the time lost due to inefficiencies in the production process.
Line balancing involves analyzing the production process to ensure that each workstation is being utilized efficiently
The goal of line balancing is to minimize idle time and maximize productivity
Loss cycle time refers to the time lost due to factors such as machine breakdowns, material shortages, and worker ine...read more
Q4. What's is Tsv and testing process
TSV stands for Test Specification and Verification. Testing process involves planning, designing, executing and reporting tests.
TSV is a document that outlines the testing requirements and procedures
Testing process involves identifying test scenarios and cases
Test cases are executed and results are recorded
Defects are reported and retested until resolved
Final test report is generated
Q5. What's is jh and jh steps and 5s
JH and JH steps are quality control methodologies used in manufacturing. 5S is a workplace organization method.
JH stands for Job Handling and JH steps are a set of procedures used to ensure quality control in manufacturing processes.
5S is a workplace organization method that involves sorting, simplifying, sweeping, standardizing, and sustaining.
JH steps and 5S are often used together to improve efficiency and quality in manufacturing operations.
Q6. What's is frl unit and solenoid valves
FRL unit is a filter, regulator, and lubricator unit used in compressed air systems. Solenoid valves are electromechanical valves used to control the flow of fluids.
FRL unit is used to filter, regulate, and lubricate compressed air in pneumatic systems
Solenoid valves are used to control the flow of fluids in various applications
Solenoid valves are electromechanical valves that use an electric current to control the valve's position
FRL units are important for maintaining the q...read more
Q7. What's is assembly line processing
Assembly line processing is a manufacturing process where a product is assembled in a sequential manner by different workers or machines.
It involves dividing the production process into smaller tasks
Each worker or machine performs a specific task in a sequential manner
The product moves from one station to another until it is completed
It increases efficiency and reduces production time and cost
Examples include automobile manufacturing, electronics assembly, and food processing
Q8. What's is oee and pplh
OEE stands for Overall Equipment Effectiveness and PPLH stands for Production Per Labor Hour.
OEE is a metric used to measure the efficiency of manufacturing processes.
It takes into account three factors: availability, performance, and quality.
PPLH is a metric used to measure the productivity of labor in manufacturing processes.
It is calculated by dividing the total production output by the total labor hours.
Both OEE and PPLH are important metrics for production engineers to o...read more
Q9. What's is FIFO and lifo
FIFO and LIFO are inventory management methods used to manage stock and determine the cost of goods sold.
FIFO stands for First-In, First-Out, which means that the first items purchased are the first items sold.
LIFO stands for Last-In, First-Out, which means that the last items purchased are the first items sold.
FIFO is commonly used in industries where perishable goods are sold, such as food and beverage.
LIFO is commonly used in industries where the cost of goods sold is risi...read more
Q10. What's is tpm and tqm
TPM stands for Total Productive Maintenance and TQM stands for Total Quality Management.
TPM is a maintenance program that aims to maximize equipment effectiveness and minimize downtime.
TQM is a management approach that focuses on continuous improvement of product quality and customer satisfaction.
TPM involves all employees in the maintenance process and emphasizes preventive maintenance.
TQM involves all employees in the quality improvement process and emphasizes customer sati...read more
Q11. What is 7 QC
7 QC is a set of quality control tools used in manufacturing to identify and solve production problems.
7 QC stands for Seven Quality Control tools
These tools include Pareto analysis, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart
They are used to analyze data, identify root causes of problems, and make informed decisions for process improvement
Q12. What is ppl and pplh
PPL stands for Production Per Labour and PPLH stands for Production Per Labour Hour.
PPL is a measure of how much production is achieved per unit of labor input.
PPLH is a measure of how much production is achieved per labor hour.
Both metrics are used to evaluate the efficiency of production processes.
For example, if a factory produces 100 units with 10 workers, the PPL would be 10 units per worker.
If the same factory operates for 8 hours and produces 800 units, the PPLH would ...read more
Interview Process at ITC Hotels
Top Production Engineer Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month