i
JSW Steel
Filter interviews by
I applied via campus placement at National Institute of Technology (NIT), Calicut and was interviewed in Dec 2022. There were 2 interview rounds.
Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement. Compressive strength is a measure of a cement's ability to withstand loads. Design speed refers to the intended speed of a project's completion.
Types of cement: Portland cement, rapid-hardening cement, sulfate-resistant cement
Compressive strength: Measure of a cement's ability to withstand loads
Design speed: Intended speed of
I applied via Campus Placement and was interviewed before Jun 2022. There were 5 interview rounds.
About Reasoning, verbal and logical
Some of industrial and GK topics about industry and economical and geographical related
Top trending discussions
I applied via Recruitment Consulltant
I applied via Naukri.com and was interviewed in Feb 2022. There were 2 interview rounds.
posted on 21 Jun 2024
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
Maths question, and reasoning
The first law of thermodynamics states that energy cannot be created or destroyed, only transferred or converted.
Energy is conserved in a closed system
Energy can be transferred between different forms (e.g. heat, work)
The total energy of a system remains constant
Mathematically expressed as: ΔU = Q - W, where ΔU is the change in internal energy, Q is heat added to the system, and W is work done by the system
The second law of thermodynamics states that the total entropy of an isolated system can never decrease over time.
Entropy tends to increase in a closed system
Heat energy naturally flows from hot to cold objects
Efficiency of energy conversion processes is limited by the second law
I applied via Recruitment Consulltant
I applied via Approached by Company and was interviewed in Jun 2024. There were 2 interview rounds.
posted on 17 Aug 2023
About technical and resources and manpower deployed to reduce time
Planning and sequence of structure erection involves creating a detailed schedule and coordinating various tasks to ensure efficient and safe construction.
Develop a comprehensive project schedule outlining the sequence of tasks and milestones
Coordinate with subcontractors and suppliers to ensure timely delivery of materials and equipment
Implement safety measures and protocols to protect workers and prevent accidents
Reg...
Planning and scheduling are crucial for project success as they help in setting clear goals, allocating resources efficiently, and ensuring timely completion.
Planning helps in defining project scope, objectives, and deliverables.
Scheduling helps in allocating resources, setting deadlines, and tracking progress.
Effective planning and scheduling reduce risks, improve communication, and increase productivity.
Examples: Gan...
Interview experience
based on 10 reviews
Rating in categories
Assistant Manager
3k
salaries
| ₹5.2 L/yr - ₹13 L/yr |
Junior Engineer
2.2k
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Deputy Manager
1.7k
salaries
| ₹5.6 L/yr - ₹16 L/yr |
Manager
1.1k
salaries
| ₹7 L/yr - ₹26.1 L/yr |
Senior Engineer
1k
salaries
| ₹3 L/yr - ₹10.5 L/yr |
Tata Steel
Steel Authority Of India
Vedanta Limited
ArcelorMittal Nippon Steel