Purging, hydrotest, schedule prepare, float, milestone are terms used in project planning and execution.
Purging is the process of removing unwanted substances from a system or equipment before use.
Hydrotest is a pressure test conducted on piping or vessels to ensure their integrity.
Schedule preparation involves creating a timeline for project activities and tasks.
Float refers to the amount of time an activity can be de...
Top trending discussions
posted on 5 Jun 2024
Optimistic costing involves estimating project costs on the lower end of the spectrum.
Identify all potential cost-saving measures and efficiencies in the project plan.
Use historical data and benchmarks to estimate costs on the lower side.
Consider best-case scenarios and optimistic assumptions when estimating costs.
Collaborate with stakeholders to gather insights and input on cost-saving opportunities.
Regularly review a...
posted on 13 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
based on 6 reviews
Rating in categories
Safety Officer
59
salaries
| ₹1.8 L/yr - ₹6 L/yr |
QA QC Engineer
37
salaries
| ₹2.9 L/yr - ₹6.5 L/yr |
Piping Engineer
33
salaries
| ₹2 L/yr - ₹9 L/yr |
Planning Engineer
14
salaries
| ₹2.7 L/yr - ₹8.5 L/yr |
Store Officer
8
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Tech Mahindra
TCS
Wipro
HCLTech