Filter interviews by
Clear (1)
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.
I was given with some scenarios and they would like to know what would be my decision in those scenarios.
posted on 12 Nov 2019
I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.
posted on 24 Feb 2025
I was interviewed before Feb 2024.
I have experience handling temperatures up to 500 degrees Fahrenheit in a manufacturing setting.
Handled temperatures up to 500 degrees Fahrenheit in a manufacturing environment
Experience with operating machinery and equipment at high temperatures
Implemented safety protocols to ensure proper handling of high temperatures
In the event of a power failure or DCS failure, I would take immediate actions to ensure minimal disruption to operations.
Notify relevant personnel and stakeholders about the situation
Activate backup power sources if available
Implement emergency shutdown procedures to prevent damage to equipment
Troubleshoot the cause of the failure and work towards restoring power or DCS functionality
Communicate updates and progress to
I applied via Campus Placement and was interviewed before Jan 2021. There were 5 interview rounds.
posted on 14 Jun 2024
posted on 15 Oct 2023
RTT details for tower erection, foundation, and JV involve planning, coordination, and execution of construction activities.
RTT stands for Radio Tower Technology, which includes the process of erecting communication towers.
Tower foundation involves the construction of a stable base to support the tower structure.
JV (Joint Venture) may refer to a partnership between two or more companies to undertake the tower construct...
GBT details for tower erection and foundation involve planning, design, and construction of the tower structure.
GBT stands for Guyed Tower Base
Tower erection involves assembling and installing the tower structure
Tower foundation involves designing and constructing the base to support the tower
Proper planning and engineering calculations are essential for a safe and stable tower structure
posted on 22 Oct 2023
I applied via Job Portal and was interviewed before Oct 2022. There were 4 interview rounds.
Written exam should be conducted.
Our current plant process focuses on lean manufacturing principles to optimize efficiency and reduce waste.
Utilization of Kanban system for inventory management
Implementation of 5S methodology for workplace organization
Regular Gemba walks to identify and address process inefficiencies
Continuous improvement through Kaizen events
Cross-training of employees to increase flexibility and productivity
First round include a test consist of Arithmetic Reasoning and English
General questions, leasing reasoning, english vocublory.
Senior Executive
215
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate
166
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Associate
156
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Vice President
88
salaries
| ₹0 L/yr - ₹0 L/yr |
Vice President
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Motilal Oswal Financial Services
Edelweiss
Kotak Mahindra Bank
HDFC Bank