i
JLL
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
I appeared for an interview in Feb 2025, where I was asked the following questions.
I have extensive experience in facility management across various sectors, focusing on operational efficiency and strategic planning.
Managed a portfolio of 15 commercial properties, improving occupancy rates by 20% through effective tenant relations.
Led a team in a major renovation project for a corporate office, completing it 10% under budget and ahead of schedule.
Implemented a sustainability program that reduced ener...
I applied via Recruitment Consulltant and was interviewed in May 2024. There were 2 interview rounds.
Fire dampers are devices installed in ducts to prevent the spread of fire and smoke throughout a building.
Fire dampers are typically installed in HVAC ductwork to close off airflow in the event of a fire.
They are activated by a fusible link that melts at high temperatures, causing the damper to close.
Fire dampers help contain fire and smoke within a specific area of a building, preventing it from spreading to other are...
AHU components include filters, coils, fans, dampers, and controls, each serving a specific function in the air handling process.
Filters: remove dust and particles from the air
Coils: heat or cool the air as needed
Fans: circulate the air throughout the system
Dampers: control the flow of air
Controls: regulate the overall operation of the AHU
The load of the UPS system refers to the amount of power being drawn from the system at a given time.
The load of the UPS system is typically expressed as a percentage of the total capacity of the system.
Monitoring the load of the UPS system is important to ensure it is not being overloaded, which can lead to system failure.
For example, if a UPS system has a total capacity of 1000 watts and is currently drawing 500 watt
The coefficient of energy is a measure of the efficiency of energy transfer in a system.
The coefficient of energy is calculated by dividing the useful energy output by the total energy input.
It is often used to evaluate the efficiency of energy conversion processes.
For example, in a heating system, the coefficient of energy would indicate how much of the input energy is actually used to heat the space.
A higher coeffici
JLL interview questions for popular designations
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
Work like a family in jll
Get interview-ready with Top JLL Interview Questions
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
I appeared for an interview in Feb 2025, where I was asked the following questions.
PR can stand for various terms, including Public Relations, Personal Record, and Purchase Request, depending on the context.
Public Relations: The practice of managing communication between an organization and its public.
Personal Record: A term often used in sports to denote an individual's best performance in an event.
Purchase Request: A formal request to procure goods or services within an organization.
Processing PR involves systematic steps to ensure effective management and approval of purchase requests.
Identify the need: Determine what items or services are required for the facility.
Create a PR: Fill out a purchase request form detailing the items, quantities, and purpose.
Obtain approvals: Submit the PR to relevant stakeholders for approval, such as department heads or finance.
Vendor selection: Research and select...
I appeared for an interview in May 2024.
To rectify a twisted footing, the footing must be carefully realigned and reinforced to prevent future twisting.
Inspect the footing to determine the extent of the twist
Carefully realign the footing using appropriate tools and techniques
Reinforce the footing to prevent future twisting, such as adding additional support or braces
Consult with a structural engineer if necessary for guidance on proper realignment and reinfo
The duration of JLL interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 146 interviews
Interview experience
Assistant Manager
1.1k
salaries
| ₹4.6 L/yr - ₹14.4 L/yr |
Facility Executive
996
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Assistant Project Leader
571
salaries
| ₹3.8 L/yr - ₹12 L/yr |
Senior Analyst
556
salaries
| ₹3.3 L/yr - ₹9.8 L/yr |
Assistant Facility Manager
531
salaries
| ₹3 L/yr - ₹11.1 L/yr |
CBRE
NoBroker
Cushman & Wakefield
Colliers India