Upload Button Icon Add office photos

Filter interviews by

JKM Infra Projects Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is job safety analysis
  • Ans. 

    Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.

    • Involves breaking down a job task into steps

    • Identifying potential hazards for each step

    • Determining preventive measures to reduce risks

    • Ensures workers are aware of safety procedures

    • Examples: construction site JSA, manufacturing plant JSA

  • Answered by AI
  • Q2. What is hazard identification and risk assessment
  • Ans. 

    Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.

    • Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.

    • Risk assessment involves evaluating the likelihood and severity of harm from these hazards.

    • The goal is to implement con...

  • Answered by AI
  • Q3. What is fire safety
  • Ans. 

    Fire safety refers to measures taken to prevent and protect against the risks of fire.

    • Fire safety includes having working smoke detectors in place.

    • It also involves creating and practicing a fire escape plan.

    • Proper storage and handling of flammable materials is crucial for fire safety.

    • Regular maintenance of fire extinguishers and other fire safety equipment is important.

    • Training employees on fire safety protocols is ess

  • Answered by AI
  • Q4. Accident investigation
  • Q5. What is hazard site
  • Ans. 

    A hazard site is a location where there is a potential risk of harm to people, property, or the environment.

    • Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.

    • These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.

    • Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.

    • Examples of h...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Whats is stop work application
  • Ans. 

    Stop work application is a procedure used to halt work activities due to safety concerns or violations.

    • Stop work applications are typically used when there is an imminent danger to workers or the environment.

    • Workers are trained to recognize when a stop work application is necessary and how to properly implement it.

    • Examples of reasons for a stop work application include unsafe working conditions, equipment malfunctions,

  • Answered by AI
  • Q2. What is scaffolding
  • Ans. 

    Scaffolding is a temporary structure used to support workers and materials during construction or maintenance work.

    • Scaffolding provides a safe working platform at height

    • It is typically made of metal or wood

    • Different types include tube and coupler, frame, and system scaffolding

    • Scaffolding must be inspected regularly for safety

  • Answered by AI
  • Q3. Types of scaffolding
  • Ans. 

    Types of scaffolding include supported scaffolding, suspended scaffolding, and aerial lifts.

    • Supported scaffolding is the most common type and is supported by the ground or a building structure.

    • Suspended scaffolding hangs from the roof or top of a building and is commonly used for window washing or painting.

    • Aerial lifts are platforms lifted by cranes or other equipment and are commonly used for tasks at height.

    • Other typ...

  • Answered by AI
  • Q4. Types of accident/incident
  • Ans. 

    Types of accidents/incidents include slips, trips, falls, machinery accidents, chemical exposures, and fires.

    • Slips, trips, and falls are common in workplaces due to wet floors, cluttered walkways, or uneven surfaces.

    • Machinery accidents can occur when proper safety procedures are not followed or equipment malfunctions.

    • Chemical exposures may result from spills, leaks, or improper handling of hazardous substances.

    • Fires ca...

  • Answered by AI
  • Q5. 0% accident incident work

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare the conduction all work in safety
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Whats LEL tell procedures
  • Ans. 

    LEL stands for Lower Explosive Limit, which is the minimum concentration of a gas or vapor in air that will ignite if a source of ignition is present.

    • LEL is used to determine the potential for a fire or explosion in a confined space.

    • Procedures for LEL testing involve using gas detection equipment to measure the concentration of a specific gas in the air.

    • If the LEL of a gas is exceeded, it indicates a potentially hazard...

  • Answered by AI
  • Q2. Tel us the control of confind
  • Ans. 

    Control of confined spaces is essential for ensuring the safety of workers in potentially hazardous environments.

    • Implementing a permit-to-work system to control access to confined spaces

    • Conducting thorough risk assessments before entry

    • Providing appropriate training for workers on confined space entry procedures

    • Using gas detectors and ventilation systems to monitor and control atmospheric conditions

    • Having a rescue plan

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many grade of Bitumen ?
  • Ans. 

    There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.

    • VG-10: Suitable for low-traffic roads

    • VG-20: Suitable for medium-traffic roads

    • VG-30: Suitable for high-traffic roads

    • VG-40: Suitable for heavy-duty traffic areas like airports and container terminals

  • Answered by AI
  • Q2. What is the compressive strength of cement mortar cube 3 days
  • Ans. 

    The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.

    • Compressive strength of cement mortar cube is an important parameter to assess its quality and durability

    • The strength of cement mortar increases with age, so 3 days is an early testing point

    • Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Salary expectations , work experience
  • Q2. Notice period how many days
  • Ans. 

    My notice period is 30 days.

    • My notice period is standard 30 days as per company policy.

    • I am required to serve a 30-day notice period before leaving my current position.

    • I can start the new role after completing the 30-day notice period.

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Techinal related questions on
  • Q2. Digital marketing social media management
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Case Study 

We have ask about civil engineering topics

Round 2 - Technical 

(3 Questions)

  • Q1. We have to asks technical skills
  • Q2. We to ask mostly asking questions in interview
  • Q3. We have ask important questions in civil engineering topics
Round 3 - One-on-one 

(2 Questions)

  • Q1. We have to asks all
  • Q2. We have ask alll

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Describe your previous role
  • Ans. 

    Managed full-cycle recruitment process for various positions in a fast-paced tech company

    • Led recruitment efforts for technical roles such as software engineers and data scientists

    • Collaborated with hiring managers to understand hiring needs and develop job descriptions

    • Sourced candidates through various channels including job boards, social media, and employee referrals

    • Conducted phone screens, interviews, and assessments...

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. It was more deep interview to understand the areas that I have worked .

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a treat experience and they had communicated the result promptly
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Basic details of electrical equipment
  • Q2. Basic protection of electrical equipment

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

JKM Infra Projects Interview FAQs

How to prepare for JKM Infra Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at JKM Infra Projects. The most common topics and skills that interviewers at JKM Infra Projects expect are Accounts Finalisation, Auditing, Balance Sheet Finalisation, Direct Tax and Final Audit.

Tell us how to improve this page.

JKM Infra Projects Reviews and Ratings

based on 22 reviews

3.6/5

Rating in categories

3.6

Skill development

3.7

Work-Life balance

3.5

Salary & Benefits

3.8

Job Security

3.8

Company culture

2.3

Promotions/Appraisal

3.7

Work Satisfaction

Explore 22 Reviews and Ratings
Senior Executive Finance & Accounts
4 salaries
unlock blur

₹3.6 L/yr - ₹4.1 L/yr

HR Executive
4 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Company Secretary
4 salaries
unlock blur

₹2.2 L/yr - ₹9 L/yr

General Manager
4 salaries
unlock blur

₹12 L/yr - ₹24 L/yr

Site Engineer
4 salaries
unlock blur

₹3.2 L/yr - ₹5.1 L/yr

Explore more salaries
Compare JKM Infra Projects with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

ABCI Infrastructures

3.5
Compare

R.V.R. PROJECTS

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview