I applied via Approached by Company and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Mechanical Maintenance practice related
  • Q2. Machine overhauling
  • Q3. Trouble shooting in hydraulics, pumpmaintenance and valve maintenance.
  • Ans. 

    Troubleshooting in hydraulics, pump maintenance, and valve maintenance involves identifying and resolving issues with hydraulic systems and their components.

    • Identify common issues such as leaks, low pressure, and overheating in hydraulic systems.

    • Inspect pump components for wear and tear, and replace or repair as needed.

    • Check valves for proper functioning and adjust or replace if necessary.

    • Use diagnostic tools like pres...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Case studies on turbine and Generator
  • Q2. Troubleshooting on pumps
  • Ans. 

    Troubleshooting on pumps involves identifying and resolving issues with the operation of pumps.

    • Check for any leaks in the pump system

    • Inspect the pump motor for any signs of damage or malfunction

    • Verify that the pump is receiving adequate power supply

    • Clean or replace clogged filters or strainers

    • Check for any air pockets in the pump system

    • Ensure that the pump is properly lubricated

    • Consult the pump manual for troubleshooti

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Should have good process and technical knowledge.

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (69)

Sopra Steria

Success to our employee's well-being? A work-life balance that's simply unbeatable.

Our employees have rated us 4 for Work-Life Balance on AmbitionBox

I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

Any question in WTP area

Interview Preparation Tips

Interview preparation tips for other job seekers - I am anjani kumar Tiwari, my post in CPU operator. My experience is 1 year 10 month

Interview Questionnaire 

1 Question

  • Q1. CHP Area all equipment,, working process..

Interview Preparation Tips

Interview preparation tips for other job seekers - Not explain

Shift Incharge Interview Questions asked at other Companies

Q1. Tell me about power factor and how to keep always .80?
View answer (5)

I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How to find out inductance value of motor and pi value of transformer
  • Ans. 

    Inductance value of motor and pi value of transformer can be found using different methods.

    • Inductance value of motor can be found using LCR meter or by measuring the voltage and current waveforms and calculating the inductance using mathematical formulas.

    • Pi value of transformer can be found by measuring the open circuit voltage and short circuit current and using the formula Pi = (open circuit voltage / short circuit c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Only technician questions asked client

Senior Electrical Engineer Interview Questions asked at other Companies

Q1. 1. What IEC standard you are using for designing the panels, for selection of switchgear.
View answer (1)

Jhabua power interview questions for popular designations

 Senior Electrical Engineer

 (1)

 Water Treatment Plant Chemist and Operator

 (1)

 Shift Incharge

 (1)

 Deputy Manager

 (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Fabrication procedure of Heat exchanger?
  • Ans. 

    The fabrication procedure of a heat exchanger involves designing, assembling, and welding together various components to create a system for transferring heat between two fluids.

    • Designing the layout and dimensions of the heat exchanger based on the specific requirements and operating conditions

    • Selecting the appropriate materials for the heat exchanger components to ensure compatibility with the fluids and temperature r...

  • Answered by AI
  • Q2. Information about material of construction?
  • Ans. 

    Material of construction refers to the type of material used to build a structure or object.

    • Material of construction can impact the durability, strength, and cost of a project.

    • Common materials include steel, concrete, wood, and plastic.

    • The choice of material depends on factors such as the intended use, budget, and environmental conditions.

    • For example, steel is often used in high-rise buildings for its strength, while w...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good atmosphere to work.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Knowledge about composite blade manufacturing
  • Q2. Knowledge about cost saving initiatives

Interview Preparation Tips

Interview preparation tips for other job seekers - Soft skills are more important
Focus on safety,quality cost aspects
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - HR 

(2 Questions)

  • Q1. Why are you interested to join M.E Energy?
  • Ans. 

    I am interested in joining M.E Energy because of their innovative solutions in the energy sector and their commitment to sustainability.

    • Impressed by M.E Energy's track record of delivering cutting-edge energy solutions

    • Excited about the opportunity to contribute to a company that prioritizes sustainability

    • Impressed by the company's reputation for innovation and excellence

    • Believe my skills and experience align well with

  • Answered by AI
  • Q2. What will you owe to company if you join M.E Energy?
  • Ans. 

    I will owe loyalty, dedication, hard work, and commitment to M.E Energy if I join the company.

    • Loyalty to the company's goals and values

    • Dedication to performing my duties effectively

    • Hard work to contribute to the success of the company

    • Commitment to continuous improvement and growth

    • Example: I will owe M.E Energy my loyalty by always prioritizing the company's interests over personal gain.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good atmosphere to work
Round 1 - Technical 

(1 Question)

  • Q1. Power bi, sap, automation, dashboard development
Round 2 - HR 

(1 Question)

  • Q1. Hr questions...general information related to project. Tools and skills etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go for this company... they changes the role after joining.. this happened with me as well as with somw other people.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Apr 2024.

Round 1 - HR 

(2 Questions)

  • Q1. About work culture
  • Q2. About technical
Round 2 - Technical 

(1 Question)

  • Q1. Related to Transformer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. Can you tell me about yourself?
  • Q2. What are your responsibilities in the plant?
  • Ans. 

    As a Senior Engineer in the plant, my responsibilities include overseeing operations, managing projects, ensuring compliance with regulations, and leading a team of engineers.

    • Overseeing day-to-day operations in the plant

    • Managing projects related to plant upgrades or expansions

    • Ensuring compliance with safety and environmental regulations

    • Leading and mentoring a team of engineers

    • Troubleshooting technical issues and implem

  • Answered by AI
  • Q3. Why is tan delta testing conducted in power transformers?
  • Ans. 

    Tan delta testing is conducted in power transformers to assess the insulation condition and detect any potential faults.

    • Tan delta testing helps in evaluating the insulation quality of power transformers.

    • It can detect any potential issues such as moisture, contamination, or aging of insulation materials.

    • By measuring the tan delta value, engineers can assess the dielectric losses in the transformer.

    • Regular tan delta test...

  • Answered by AI
  • Q4. What is a vector group?
  • Ans. 

    A vector group is a method used to represent the phase relationship between the primary and secondary windings of a transformer.

    • Vector group indicates the connection of transformer windings and the phase shift between them.

    • It is represented by a combination of letters and numbers, such as Yd1, Dyn11, etc.

    • Different vector groups have different phase relationships, affecting the transformer's performance and operation.

    • Ve...

  • Answered by AI
  • Q5. What should be considered when erecting an IDT (Inverter duty Transformer)?
  • Ans. 

    Considerations when erecting an IDT (Inverter duty Transformer)

    • Ensure the transformer is designed for inverter duty applications

    • Properly size the transformer based on the inverter's output power

    • Consider the harmonic content of the inverter's output when selecting the transformer

    • Provide adequate ventilation and cooling for the transformer to handle the increased heat generated by the inverter

    • Ensure proper grounding and ...

  • Answered by AI
  • Q6. What is the star-delta connection in power transformers?
  • Ans. 

    Star-delta connection is a method used in power transformers to reduce starting current and improve efficiency.

    • Star-delta connection involves connecting the primary windings of the transformer in a star configuration during starting, and then switching to a delta configuration during normal operation.

    • This method helps in reducing the starting current drawn by the transformer, which is beneficial for the power system.

    • It...

  • Answered by AI
  • Q7. What types of conductors are used in high-tension (HT) lines, and what are their current capacities?
  • Ans. 

    High-tension (HT) lines use different types of conductors with varying current capacities.

    • Types of conductors used in HT lines include aluminum, steel, and composite materials

    • Aluminum conductors are commonly used due to their lightweight and high conductivity

    • Steel conductors are used for their strength and durability

    • Composite conductors are a newer technology that offer a balance of strength and conductivity

    • Current cap...

  • Answered by AI
  • Q8. What is the distance between poles in 33KV high tension lines?
  • Ans. 

    The distance between poles in 33KV high tension lines is typically around 50-60 meters.

    • The distance between poles in high tension lines is determined by factors such as terrain, voltage level, and local regulations.

    • In general, the distance can range from 50 to 60 meters for 33KV high tension lines.

    • This distance is important to ensure proper support and insulation of the conductors between poles.

  • Answered by AI
  • Q9. What is the process of laying LT cables?
  • Ans. 

    The process of laying LT cables involves planning, trenching, laying the cables, jointing, testing, and backfilling.

    • Plan the route and depth of the trench for laying the cables.

    • Excavate the trench to the required depth and width.

    • Lay the cables in the trench, ensuring proper alignment and support.

    • Joint the cables together using appropriate connectors.

    • Test the cables for continuity and insulation resistance.

    • Backfill the ...

  • Answered by AI
  • Q10. What is the process for attaching modules?
  • Ans. 

    The process for attaching modules involves identifying connection points, aligning the modules, securing them in place, and testing for functionality.

    • Identify connection points on both modules

    • Align the modules properly to ensure a secure fit

    • Secure the modules in place using appropriate fasteners or connectors

    • Test the functionality of the attached modules to ensure proper connection

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why do you want to change jobs?
  • Ans. 

    Seeking new challenges and opportunities for growth in a more innovative environment.

    • Desire for new challenges and opportunities

    • Seeking growth and advancement

    • Looking for a more innovative work environment

  • Answered by AI
  • Q2. What can you share about your family?
  • Ans. 

    I come from a close-knit family of four, including my parents and younger sister.

    • My parents have always been supportive of my career choices and encouraged me to pursue my passion for engineering.

    • I have a younger sister who is currently studying computer science at university, following in my footsteps.

    • We enjoy spending quality time together, whether it's going on family vacations or simply having dinner at home.

  • Answered by AI
Contribute & help others!
anonymous
You can choose to be anonymous

Jhabua power Interview FAQs

How many rounds are there in Jhabua power interview?
Jhabua power interview process usually has 2 rounds. The most common rounds in the Jhabua power interview process are Resume Shortlist, Aptitude Test and Technical.
What are the top questions asked in Jhabua power interview?

Some of the top questions asked at the Jhabua power interview -

  1. How to find out inductance value of motor and pi value of transfor...read more
  2. Trouble shooting in hydraulics, pumpmaintenance and valve maintenan...read more
  3. Troubleshooting on pu...read more

Recently Viewed

INTERVIEWS

Tesla Power

No Interviews

PHOTOS

Sterlite Power Grid Ventures

No Photos

JOBS

Sterlite Power Grid Ventures

No Jobs

INTERVIEWS

Orb Energy

No Interviews

INTERVIEWS

Inox Group

No Interviews

COMPANY BENEFITS

Amplus Energy Solutions

No Benefits

INTERVIEWS

OMC Power

No Interviews

SALARIES

Amplus Energy Solutions

No Salaries

SALARIES

Sembcorp Gayathri Power

No Salaries

COMPANY BENEFITS

Sembcorp Gayathri Power

No Benefits

Tell us how to improve this page.

Jhabua power Interview Process

based on 4 interviews

Interview experience

3.8
  
Good
View more

Sun Pharmaceutical Industries

Join us and thrive in a company culture that inspires and empowers.

Interview Questions from Similar Companies

UTL Solar Interview Questions
3.5
 • 43 Interviews
Senvion Interview Questions
4.0
 • 19 Interviews
M E Energy Interview Questions
4.0
 • 17 Interviews
Gautam Solar Interview Questions
4.0
 • 16 Interviews
LM Wind Power Interview Questions
4.0
 • 13 Interviews
EVIO Interview Questions
4.0
 • 8 Interviews
View all

Jhabua power Reviews and Ratings

based on 57 reviews

3.5/5

Rating in categories

3.4

Skill development

3.3

Work-life balance

3.0

Salary

3.6

Job security

3.4

Company culture

2.7

Promotions

3.4

Work satisfaction

Explore 57 Reviews and Ratings
Deputy Manager
21 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Jhabua power with

UTL Solar

3.5
Compare

Danfoss Power Solutions

4.1
Compare

LM Wind Power

4.0
Compare

Senvion

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview