Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Jain Housing & Constructions Team. If you also belong to the team, you can get access from here

Jain Housing & Constructions Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Jain Housing & Constructions Estimation Executive Interview Questions and Answers

Updated 23 Sep 2024

Jain Housing & Constructions Estimation Executive Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About your self
Round 2 - Technical 

(2 Questions)

  • Q1. Previous Working, Rate analysis & Quantity taken, IS Standard for Estimation IS1200
  • Q2. Method of Quantity Surveying
  • Ans. 

    Quantity surveying is a process of estimating the cost of construction projects by calculating the quantities of materials and labor required.

    • Quantity surveying involves measuring and estimating the quantities of materials, labor, and equipment needed for a construction project.

    • It also includes preparing cost estimates, budgets, and bills of quantities for the project.

    • Methods of quantity surveying include traditional m...

  • Answered by AI

Estimation Executive Jobs at Jain Housing & Constructions

View all

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What the sampling frequency for private density test in per square meter?
  • Ans. 

    The sampling frequency for private density test per square meter depends on the type of test being conducted.

    • The sampling frequency for a private density test per square meter varies depending on the type of test being conducted.

    • For example, a soil density test may require a sampling frequency of one sample per 100 square meters, while a concrete density test may require a sampling frequency of one sample per 10 square...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Alu-from

I applied via Walk-in

Interview Questionnaire 

2 Questions

  • Q1. Which channel partners are associated with you
  • Q2. Call top 5 channel partners & keep it on loud speaker

Interview Preparation Tips

Interview preparation tips for other job seekers - Be realistic
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Where did you see yourself in 5 down d line?
  • Q2. Why u join Emaar PJSC?

Interview Preparation Tips

Interview preparation tips for other job seekers - One of d pathetic company with their pathetic employees I hv ever seen they don’t know how to treat valuable employees
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General introduction about previous years experience
Round 3 - Technical 

(1 Question)

  • Q1. Profile related questions asked

I applied via Campus Placement and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. What is location preferance, are you willing to relocate
  • Ans. 

    I am open to relocation based on the needs of the company and the opportunity for growth.

    • I am flexible and willing to consider relocation for the right opportunity

    • I understand that being open to relocation can enhance my career prospects

    • I am willing to adapt to new environments and embrace new challenges

    • I believe that relocating can provide valuable experiences and broaden my horizons

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be analytic and have basic understanding of reasoning and have
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Start to handover process in a Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be well prepared in terms of all types of processes and sequences in construction. Situation based problem solving abilities and good communication skills.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Technically and mathematics and our I q test

Round 3 - HR 

(3 Questions)

  • Q1. Technically and basically
  • Q2. What about the drawing and detail of project and quantity how can be measure
  • Ans. 

    Measurements for project drawings and quantities can be determined through detailed analysis and calculations.

    • Measurements can be taken directly from the project drawings using scales and measuring tools.

    • Quantities can be calculated based on the dimensions provided in the drawings.

    • Software tools like AutoCAD and Revit can also be used to accurately measure quantities and dimensions.

    • Bill of Quantities (BOQ) can be prepa...

  • Answered by AI
  • Q3. Read the drawing proper and clear the all demarcation and prepare planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare confidential and fresh mind don't be afraid
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions, Finishing work, Basic knowledge of Fire and Plumbing work, Quality codes, Glazing work, ETC..
Round 3 - HR 

(1 Question)

  • Q1. Pay rolls and offer letter

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be confidence with your answer and have Site work knowledge.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Mivan related questions
  • Q2. Steel related questions
  • Q3. Personal question

Jain Housing & Constructions Interview FAQs

How many rounds are there in Jain Housing & Constructions Estimation Executive interview?
Jain Housing & Constructions interview process usually has 2 rounds. The most common rounds in the Jain Housing & Constructions interview process are HR and Technical.
How to prepare for Jain Housing & Constructions Estimation Executive interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Jain Housing & Constructions. The most common topics and skills that interviewers at Jain Housing & Constructions expect are Civil Engineering and Cost Estimation.
What are the top questions asked in Jain Housing & Constructions Estimation Executive interview?

Some of the top questions asked at the Jain Housing & Constructions Estimation Executive interview -

  1. Method of Quantity Survey...read more
  2. Previous Working, Rate analysis & Quantity taken, IS Standard for Estimation I...read more

Tell us how to improve this page.

Jain Housing & Constructions Estimation Executive Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 136 Interviews
DLF Interview Questions
4.0
 • 77 Interviews
Omaxe Interview Questions
4.1
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 34 Interviews
Ashiana Housing Interview Questions
4.0
 • 29 Interviews
View all
Executive Accountant
26 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Site Engineer
25 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Civil Site Engineer
13 salaries
unlock blur

₹1.6 L/yr - ₹5.5 L/yr

Senior Sales Executive
8 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Store Executive
7 salaries
unlock blur

₹2.4 L/yr - ₹4.1 L/yr

Explore more salaries
Compare Jain Housing & Constructions with

Sobha

3.8
Compare

Godrej Properties

3.7
Compare

DLF

3.9
Compare

Omaxe

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview