Q. What is the total cost of a residential building per built-up area?

Ans.

The total cost of a residential building per built up area depends on various factors such as location, materials used, labor costs, and amenities.

  • Total cost = Cost of land + Cost of construction + Cost of amenities

  • Cost of land can vary greatly depending on location and size of the plot

  • Cost of construction includes materials, labor, and overhead expenses

  • Cost of amenities such as landscaping, parking, and utilities should also be considered

  • Example: In a high-end neighborhood, ...read more

Asked in Esbee Realty

4d ago

Q. What is the thumb rule for calculating Mivan shuttering per square foot of built-up area?

Ans.

The thumb rule for calculation of mivan shuttering per sqft of built up area is typically around 0.15 to 0.20 sqft per sqft of built up area.

  • The thumb rule for mivan shuttering is generally around 0.15 to 0.20 sqft per sqft of built up area.

  • This rule may vary depending on the complexity of the structure and other factors.

  • For example, for a simple structure, the mivan shuttering calculation may be closer to 0.15 sqft per sqft of built up area.

  • However, for a more complex struct...read more

Asked in Esbee Realty

1d ago

Q. What is the rate of Mivan shuttering per square meter, including both material and labor costs?

Ans.

The rate of Mivan shuttering per Sqm includes both material and labor costs.

  • The rate of Mivan shuttering per Sqm can vary depending on factors such as location, project size, and contractor rates.

  • Material costs for Mivan shuttering may include aluminum formwork panels, pins, wedges, and other accessories.

  • Labor costs for Mivan shuttering involve the installation, dismantling, and maintenance of the formwork system.

  • For example, in a particular project, the rate of Mivan shutter...read more

Asked in Esbee Realty

2d ago

Q. How do you calculate the cost per built-up area of civil works?

Ans.

Cost calculation per built up area of Civil works involves determining the total cost of construction per unit area.

  • Calculate the total cost of construction including materials, labor, equipment, and overhead expenses.

  • Divide the total cost by the built up area to get the cost per unit area.

  • Consider factors such as site conditions, complexity of design, and local market rates.

  • Example: Total cost of construction is $100,000 for a built up area of 2000 sq. ft. Cost per unit area...read more

Are these interview questions helpful?

Asked in Esbee Realty

2d ago

Q. What is anchorage length in BBS?

Ans.

Anchorage length in BBS refers to the length of reinforcement bar required to transfer the load from the bar to the concrete.

  • Anchorage length is determined based on the diameter of the reinforcement bar and the type of load it will be subjected to.

  • It is essential to ensure proper anchorage length to prevent failure of the structure.

  • Anchorage length is typically specified in building codes and design standards.

  • For example, in a column reinforcement schedule, the anchorage leng...read more

Asked in Esbee Realty

4d ago

Q. ERP for management budgeting in Real Estate

Ans.

ERP systems are commonly used in Real Estate for management budgeting.

  • ERP systems help in integrating financial data for better budgeting and forecasting in Real Estate.

  • They streamline processes like expense tracking, revenue management, and financial reporting.

  • Examples of ERP systems used in Real Estate include Yardi, MRI Software, and RealPage.

  • These systems provide real-time insights and analytics to make informed budgeting decisions.

Cost Estimation Engineer Jobs

ExxonMobil logo
Gurgaon Career Event- Cost Estimation Engineer 5-10 years
ExxonMobil
3.8
Bangalore / Bengaluru
Chadha Industries logo
HVAC Cost Estimation Engineer 5-8 years
Chadha Industries
4.2
₹ 4 L/yr - ₹ 9 L/yr
New Delhi
Proman Infrastructure Services logo
Estimation and Costing Engineer - Crusher 6-11 years
Proman Infrastructure Services
3.7
Bangalore / Bengaluru

Asked in Esbee Realty

1d ago

Q. What are the coefficients of steel and concrete?

Ans.

The coefficient of steel and concrete refers to the thermal expansion properties of these materials.

  • The coefficient of thermal expansion for steel is typically around 12 x 10^-6 /°C.

  • The coefficient of thermal expansion for concrete is typically around 10 x 10^-6 /°C.

  • These coefficients are important to consider when designing structures to account for temperature changes.

5d ago

Q. Tool room machine and their process

Ans.

Tool room machines are used for manufacturing and repairing tools, dies, and molds.

  • Tool room machines include milling machines, lathes, grinders, and EDM machines.

  • Processes include cutting, shaping, drilling, and grinding.

  • Examples of tool room machines are Bridgeport milling machine, CNC lathe, surface grinder.

  • Tool room machines are essential for precision engineering and manufacturing industries.

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Asked in Esbee Realty

5d ago

Q. What is the lap zone in a column?

Ans.

Lap zone in column refers to the overlapping region where two reinforcement bars are spliced together.

  • Lap zone is typically located in the middle third of the column height for better load distribution.

  • Proper lap length and lap splice configuration are crucial for structural integrity.

  • Lap splices are commonly used in reinforced concrete columns to achieve required strength.

  • Lap length is determined based on the diameter of the reinforcement bars and the structural design requi...read more

Q. Calculation of enclosure

Ans.

Enclosure calculation involves determining the dimensions and materials needed for a structure to contain specific elements.

  • Identify the purpose of the enclosure (e.g., storage, protection).

  • Calculate the volume required based on the items to be enclosed.

  • Determine the materials needed (e.g., wood, metal) based on environmental factors.

  • Consider insulation and ventilation if necessary for temperature control.

  • Example: For a storage shed, calculate the cubic feet needed based on i...read more

Q. Costing of LV PANEL

Ans.

Costing of LV panels involves material, labor, overhead, and market factors for accurate estimation.

  • Identify materials: Steel, copper, insulation, and circuit breakers are key components.

  • Labor costs: Estimate hours for assembly, wiring, and testing based on complexity.

  • Overhead: Include factory costs, utilities, and administrative expenses.

  • Market factors: Consider demand fluctuations and supplier pricing for components.

  • Example: A basic LV panel may cost $5,000, while a complex...read more

Interview Experiences of Popular Companies

Ford Motor Logo
4.2
 • 161 Interviews
View all
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Cost Estimation Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Trusted by over 1.5 Crore job seekers to find their right fit company
80 L+

Reviews

10L+

Interviews

4 Cr+

Salaries

1.5 Cr+

Users

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2025 Info Edge (India) Ltd.

Follow Us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter
Profile Image
Hello, Guest
AmbitionBox Employee Choice Awards 2025
Winners announced!
awards-icon
Contribute to help millions!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos
Add office benefits
Add office benefits