Q1. What input is required in ARCADY and PICADY software?

Ans.

ARCADY and PICADY software require input such as road geometry, traffic flow, and vehicle characteristics.

  • Road geometry data such as lane widths, radii, and gradients

  • Traffic flow data such as traffic volume, speed, and composition

  • Vehicle characteristics such as dimensions, speed, and acceleration

  • Other inputs such as signal timings and pedestrian crossings

Add your answer
right arrow

Q2. How do you review/check work of an originator in Civil3D Models?

Ans.

I review/check work of an originator in Civil3D Models by following a systematic approach.

  • I check for errors and inconsistencies in the model.

  • I verify that the model adheres to the project standards and specifications.

  • I ensure that the model is accurate and complete.

  • I communicate with the originator to clarify any issues or concerns.

  • I document any changes or revisions made to the model.

  • I perform a final review before submitting the model for approval.

Add your answer
right arrow
Jacobs Engineering Group Interview Questions and Answers for Freshers
illustration image

Q3. Frequency of cube casting & testing per cubic meter

Ans.

The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.

  • The frequency of cube casting and testing is determined by the project specifications and quality control requirements.

  • In general, cube casting and testing may be done at regular intervals during the construction process.

  • For example, in a large construction project, cube casting and testing may be done every 50 cubic meters of concrete poured.

  • The number of...read more

View 1 answer
right arrow

Q4. Manpower output for works like shuttering,steel,blockwork,plaster etc

Ans.

Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.

  • Manpower output for shuttering can range from 10-20 sqm per day depending on complexity

  • Steelwork output can vary from 50-100 kg per worker per day

  • Blockwork output can range from 50-100 blocks per worker per day

  • Plastering output can vary from 10-20 sqm per worker per day

  • Factors such as skill level, equipment availability, and proje...read more

Add your answer
right arrow
Discover Jacobs Engineering Group interview dos and don'ts from real experiences

Q5. Is code 1200 for billing purpose

Ans.

Code 1200 is not specifically for billing purposes.

  • Code 1200 is typically used in reference to a specific task or action, not billing.

  • It could be related to a specific product, service, or process within a company.

  • For example, code 1200 might indicate a specific troubleshooting step in a technical manual.

Add your answer
right arrow

Q6. Rate analysis of each items of construction

Ans.

Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.

  • Rate analysis helps in estimating the total cost of a construction project.

  • It involves breaking down the project into various activities and determining the cost of each activity.

  • Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead costs.

  • Rate analysis helps in comparing different constructi...read more

View 1 answer
right arrow
Are these interview questions helpful?

Q7. How to prepare IO summary and Alarm & setting list preparation.

Ans.

IO summary and Alarm & setting list preparation involves documenting all input/output points and alarm settings for a BMS system.

  • Gather all relevant information on input/output points, including location, type, and function.

  • Document alarm settings for each point, including high/low limits, priority levels, and notification methods.

  • Organize the information into a clear and concise summary for easy reference.

  • Review and update the IO summary and Alarm & setting list regularly to...read more

Add your answer
right arrow

Q8. Basic programming questions: what is a list, difference between list and array

Ans.

A list is a collection of items that can be of different data types, while an array is a collection of items of the same data type.

  • List can contain items of different data types, while array can only contain items of the same data type.

  • Lists are dynamic in size, while arrays have a fixed size.

  • In Python, a list is represented by square brackets [], while an array is represented by numpy arrays or arrays module.

Add your answer
right arrow
Share interview questions and help millions of jobseekers 🌟
man with laptop

Q9. What are your capabilities in Civil3D?

Ans.

I am proficient in Civil3D and have extensive experience in using it for designing and drafting civil engineering projects.

  • Expertise in creating and editing surfaces, alignments, profiles, and corridors

  • Ability to generate 3D models and perform earthwork calculations

  • Experience in creating plan and profile sheets, cross-sections, and quantity takeoffs

  • Familiarity with Civil3D add-ons such as AutoTURN and Hydraflow

  • Proficient in using Civil3D for various civil engineering projects...read more

Add your answer
right arrow

Q10. Roundabout Parameters and values for urban and rural roundabouts

Ans.

Roundabout parameters and values vary based on urban and rural settings.

  • Urban roundabouts typically have smaller diameters and tighter curves than rural roundabouts.

  • Rural roundabouts may have larger diameters and wider curves to accommodate larger vehicles.

  • Speed limits, traffic volume, and pedestrian and cyclist activity also influence roundabout design.

  • Roundabout parameters may include lane widths, splitter island widths, and apron widths.

  • Designers may also consider landscap...read more

Add your answer
right arrow

Q11. What are the parameters to pumps foundation height fixing ?

Ans.

The parameters for fixing pump foundation height include soil conditions, pump type, vibration analysis, and accessibility.

  • Soil conditions: The foundation height should be determined based on the soil's bearing capacity and settlement characteristics.

  • Pump type: Different pump types have different requirements for foundation height to ensure proper operation and maintenance.

  • Vibration analysis: The foundation height should be designed to minimize vibration and ensure stability ...read more

View 1 answer
right arrow

Q12. What is the difference between import cad & link cad?

Ans.

Import CAD brings a copy of the CAD file into the current project, while Link CAD creates a reference to the original CAD file.

  • Import CAD creates a duplicate of the CAD file within the project, increasing file size.

  • Link CAD maintains a connection to the original CAD file, allowing for real-time updates.

  • Changes made to the original CAD file will reflect in the linked CAD file, but not in the imported CAD file.

  • Import CAD is useful when the original CAD file may be modified or d...read more

Add your answer
right arrow

Q13. Documents needed for installation of any flow meter??

Ans.

Documents required for installation of a flow meter

  • Manufacturer's installation manual

  • Piping and instrumentation diagram (P&ID)

  • Electrical wiring diagram

  • Calibration certificate

  • Material test certificate (MTC) for piping

  • Safety data sheet (SDS) for chemicals used in installation

  • Permit for installation

  • Quality assurance plan (QAP)

  • As-built drawings

Add your answer
right arrow

Q14. How the PSV installation is done for open system and closed system both ?

Ans.

PSV installation for open and closed systems involves different methods.

  • For open systems, the PSV is typically installed directly on the vent line, allowing the excess pressure to be released to the atmosphere.

  • For closed systems, the PSV is installed on a closed vessel or piping system and is connected to a discharge line that leads to a safe location or a flare system.

  • The PSV installation for closed systems requires consideration of factors such as backpressure, relieving ca...read more

Add your answer
right arrow

Q15. Acceptance criteria of cube

Ans.

Acceptance criteria of cube includes dimensions, material, weight, and quality standards.

  • Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)

  • Material should be durable and suitable for intended use (e.g. plastic, wood, metal)

  • Weight should be within acceptable range based on material and size

  • Quality standards must be met in terms of finish, edges, and overall construction

Add your answer
right arrow

Q16. Stripping time of shutterings

Ans.

Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.

  • Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.

  • For example, timber formwork may require longer stripping time compared to steel formwork.

  • In hot weather, concrete may set faster, reducing the stripping time.

  • Proper curing can also affect the stripping time by ensuring the concrete reaches suff...read more

Add your answer
right arrow

Q17. BIM Application in Highway Models?

Ans.

BIM application in highway models involves creating a digital representation of the road and its infrastructure.

  • BIM can be used to design and visualize highway projects

  • It allows for collaboration between different stakeholders

  • BIM can help with clash detection and reduce errors in construction

  • It can also be used for maintenance and asset management

  • Examples include the use of BIM in the construction of the M25 motorway in the UK and the I-4 Ultimate project in Florida

Add your answer
right arrow

Q18. What is the purpose of using overlays in AutoCAD?

Ans.

Overlays in AutoCAD are used to superimpose one drawing on top of another for comparison or reference purposes.

  • Overlays allow users to easily compare different versions of a drawing by superimposing them on top of each other.

  • They can be used to reference external files or images within the current drawing.

  • Overlays can help in coordinating different disciplines' drawings, such as architectural and structural plans.

  • They are useful for checking alignment, dimensions, and other d...read more

Add your answer
right arrow

Q19. What is copy monitor in Autodesk Revit?

Ans.

Copy monitor in Autodesk Revit is a tool used to monitor changes in linked models and synchronize them with the current model.

  • Copy monitor allows users to track changes in linked models and update them in the current model.

  • It helps maintain consistency between different models in a project.

  • Users can easily identify and resolve conflicts or discrepancies between linked models.

  • Copy monitor can be used for elements like grids, levels, columns, walls, etc.

Add your answer
right arrow

Q20. What is the purpose of using a purge layer

Ans.

A purge layer is used to remove excess material and prevent contamination during the printing process.

  • Prevents contamination of the final product

  • Removes excess material from the print bed

  • Improves print quality by ensuring proper adhesion of layers

Add your answer
right arrow

Q21. How to perform RSM method ?

Ans.

Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.

  • Design a set of experiments based on a factorial design

  • Collect data from the experiments

  • Fit a regression model to the data

  • Analyze the model to determine optimal input settings for the response variable

View 1 answer
right arrow

Q22. Describe the codes. Ask for so many value and clause.

Ans.

Codes are sets of regulations and standards that govern the design, construction, and maintenance of structures.

  • Codes ensure safety, durability, and functionality of structures.

  • They provide guidelines for materials, design, construction, and inspection.

  • Examples of codes include International Building Code (IBC), American Society of Civil Engineers (ASCE) 7, and American Concrete Institute (ACI) 318.

  • Codes are regularly updated to reflect new technologies and best practices.

  • Com...read more

Add your answer
right arrow

Q23. What is Building Information Modelling?

Ans.

Building Information Modelling (BIM) is a digital representation of the physical and functional characteristics of a building.

  • BIM is a collaborative process that allows multiple stakeholders to work together on a building project.

  • It involves creating and managing digital representations of the physical and functional characteristics of a building.

  • BIM helps in improving coordination, efficiency, and accuracy in the design and construction process.

  • It can include 3D models, 4D s...read more

Add your answer
right arrow

Q24. Please explain the process/ project life cycle?

Ans.

The project life cycle is the series of phases a project goes through from initiation to closure.

  • Initiation: Define the project, identify stakeholders, and create a business case.

  • Planning: Develop a project plan, schedule, budget, and resource plan.

  • Execution: Implement the project plan, manage resources, and deliver the project.

  • Monitoring and Control: Track progress, manage changes, and ensure quality.

  • Closure: Close out the project, conduct lessons learned, and transition del...read more

View 1 answer
right arrow

Q25. Explain the pipe rack design starting from input to output

Ans.

Pipe rack design involves determining layout, sizing, and support requirements for pipes in an industrial facility.

  • Start by determining the layout of the pipe rack based on the piping system requirements and plant layout.

  • Calculate the pipe sizes and materials based on the flow rates, pressure, and temperature requirements.

  • Design the supports for the pipe rack to ensure stability and safety.

  • Consider factors such as seismic loads, wind loads, and thermal expansion in the design...read more

Add your answer
right arrow

Q26. how to make p&ID and perform line Sizing

Ans.

P&ID is made by identifying process equipment and connecting them with pipes. Line sizing is done based on process requirements.

  • Identify process equipment and their connections

  • Determine process requirements such as flow rate and pressure drop

  • Select appropriate pipe size based on process requirements

  • Consider factors such as fluid properties, pipe material, and layout

  • Use software tools such as AutoCAD or SmartPlant P&ID for efficient design

Add your answer
right arrow

Q27. Heat transfer phenomenon

Ans.

Heat transfer is the movement of thermal energy from one object to another due to a temperature difference.

  • Heat can be transferred through conduction, convection, and radiation.

  • Conduction is the transfer of heat through a material without any movement of the material itself.

  • Convection is the transfer of heat through the movement of fluids.

  • Radiation is the transfer of heat through electromagnetic waves.

  • Examples of heat transfer include cooking food on a stove, feeling the warm...read more

Add your answer
right arrow

Q28. What is shared parameter?

Ans.

Shared parameter is a parameter that can be used across multiple elements in a project.

  • Shared parameters allow for consistent data across different elements in a project.

  • They can be created and managed in software like Revit for BIM projects.

  • Examples include shared parameters for material types, cost estimates, or project phases.

Add your answer
right arrow

Q29. Piping design activities

Ans.

Piping design activities involve creating detailed plans and specifications for piping systems in various industries.

  • Developing piping layouts and routing plans

  • Selecting appropriate materials and components

  • Calculating pressure and flow rates

  • Creating detailed drawings and schematics

  • Collaborating with other engineers and stakeholders

  • Ensuring compliance with industry standards and regulations

Add your answer
right arrow

Q30. WHAT ARE WORKSETS

Ans.

Worksets are used in BIM software to organize and manage elements within a project.

  • Worksets allow for better organization of elements within a project

  • They can be used to control visibility and access to elements for different team members

  • Worksets can be used to divide a project into different sections or disciplines

  • They help improve collaboration and coordination among team members

Add your answer
right arrow

Q31. WHAT ARE SCOPEBOXES

Ans.

Scopeboxes are 3D bounding boxes used in BIM software to define the extent of a specific scope of work or area within a project.

  • Scopeboxes help in organizing and managing different parts of a project

  • They can be used to isolate specific areas for analysis or coordination

  • Scopeboxes can be linked to specific elements or views within the BIM model

Add your answer
right arrow

Q32. Plumber tools use

Ans.

Plumber tools are essential for various plumbing tasks, including pipe installation, repairs, and maintenance.

  • Plumbers use wrenches to tighten or loosen pipes and fittings.

  • Pipe cutters are used to cut pipes to the desired length.

  • Plunger is used to clear clogged drains and toilets.

  • Pipe wrenches are used to grip and turn pipes.

  • Torch and soldering tools are used for soldering and joining pipes.

  • Pipe threaders are used to create threaded connections.

  • Drain snakes are used to remove...read more

View 1 answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Jacobs Engineering Group

based on 81 interviews
Interview experience
4.1
Good
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

Mphasis Logo
3.4
 • 526 Interview Questions
JSW Steel Logo
3.9
 • 418 Interview Questions
Shapoorji Pallonji Group Logo
4.1
 • 209 Interview Questions
JBM Group Logo
4.0
 • 195 Interview Questions
TVS Motor Logo
4.0
 • 139 Interview Questions
Afcons Infrastructure Logo
4.3
 • 139 Interview Questions
View all
Recently Viewed
INTERVIEWS
Jacobs Engineering Group
No Interviews
INTERVIEWS
Damco Solutions
No Interviews
LIST OF COMPANIES
J. Kumar Infraprojects
Locations
INTERVIEWS
In Time Tec Visionsoft
No Interviews
INTERVIEWS
J. Kumar Infraprojects
No Interviews
INTERVIEWS
J. Kumar Infraprojects
No Interviews
INTERVIEWS
Jacobs Engineering Group
No Interviews
INTERVIEWS
smartData Enterprises
No Interviews
INTERVIEWS
smartData Enterprises
No Interviews
INTERVIEWS
J. Kumar Infraprojects
No Interviews
Top Jacobs Engineering Group Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter