Filter interviews by
Be the first one to contribute and help others!
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
The screening process involves reviewing resumes, conducting interviews, skills assessments, and background checks.
Reviewing resumes to assess qualifications and experience
Conducting interviews to evaluate communication and fit
Skills assessments to test technical abilities
Background checks for verification of information provided
Reference checks to gather feedback from previous employers
Shortlisted candidates are aligned for interviews at the client site based on availability, location, and client preferences.
Coordinate with the client to determine their availability for interviews
Consider the location of the client site and the candidates' proximity
Take into account any specific preferences or requirements the client may have
Schedule interviews accordingly to ensure a smooth process
Its of 1 hrs - basically focus on psychometric test
Parts of pumps and motors include impeller, casing, shaft, bearings, and seals.
Impeller: Rotating component that generates the flow in a pump.
Casing: Encloses and supports the impeller and other parts of the pump.
Shaft: Transfers power from the motor to the impeller.
Bearings: Support and align the shaft within the pump.
Seals: Prevent leakage of fluid from the pump.
Parts of pumps and motors include impeller, casing, shaft, bearings, and motor housing.
Impeller: Rotating component that generates the flow within the pump.
Casing: Encloses the impeller and directs the flow of fluid through the pump.
Shaft: Transfers the rotational energy from the motor to the impeller.
Bearings: Support the shaft and reduce friction during rotation.
Motor housing: Encloses the motor and provides protecti
posted on 14 Oct 2024
I applied via Campus Placement and was interviewed in Sep 2024. There was 1 interview round.
I have worked on various projects including a web application for tracking personal finances and a mobile app for managing grocery lists.
Developed a web application using React.js and Node.js for tracking personal finances
Created a mobile app using Flutter for managing grocery lists
Implemented RESTful APIs for communication between frontend and backend systems
Async await in JavaScript is a way to write asynchronous code that looks synchronous, making it easier to manage promises.
Async functions return a promise.
Await keyword is used inside async functions to wait for a promise to resolve.
Async await helps avoid callback hell and makes code more readable and maintainable.
Sharding is a technique used in DBMS to horizontally partition data across multiple databases to improve performance and scalability.
Sharding involves breaking up a large database into smaller, more manageable pieces called shards.
Each shard contains a subset of the data, allowing for parallel processing and improved performance.
Sharding helps distribute the workload across multiple servers, reducing the load on any si...
Self motivate for any work and good skill
posted on 19 Dec 2024
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
Experienced housekeeping supervisor with a strong attention to detail and excellent organizational skills.
Over 5 years of experience in housekeeping management
Skilled in training and supervising staff
Proven track record of maintaining high cleanliness standards
Excellent communication and problem-solving abilities
In my previous company, I was responsible for overseeing the housekeeping staff, creating schedules, managing inventory, and ensuring cleanliness standards were met.
Overseeing housekeeping staff
Creating schedules
Managing inventory
Ensuring cleanliness standards
posted on 17 Nov 2024
Electrical engineers are responsible for designing, developing, testing, and supervising the manufacturing of electrical equipment.
Designing electrical systems and equipment
Developing new technologies and products
Testing equipment for safety and efficiency
Supervising the manufacturing process
Troubleshooting and repairing electrical equipment
posted on 10 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
Transformer vector group is a method used to represent the phase shift between the primary and secondary windings of a transformer.
Transformer vector group indicates the relationship between the primary and secondary winding phases.
It helps in determining the connection and phase shift of the transformer windings.
Common vector groups include Yy0, Yd1, Dyn11, etc.
Vector group is important for parallel operation of trans
VBD test is conducted in transformers to ensure insulation integrity and detect any potential faults.
VBD test helps in identifying any weak spots in the insulation of the transformer
It helps in preventing breakdowns and ensuring the safety and reliability of the transformer
By conducting VBD test, any potential faults can be detected early and necessary maintenance can be carried out
It is a standard procedure in transfo
I was interviewed in Sep 2024.
based on 1 review
Rating in categories
Sodexo
ISS Facility Services
BVG India
Leadec India