Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Isc Projects Team. If you also belong to the team, you can get access from here

Isc Projects Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Isc Projects QA/QC Civil Engineer Interview Questions and Answers

Updated 3 Dec 2024

Isc Projects QA/QC Civil Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2020. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Building material test process
  • Q2. Earthwork , bitumen & concrete related test
Round 3 - HR 

(1 Question)

  • Q1. Salry demand & family background

I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Related of construction work on this site.
  • Q2. Railway work .ex. soil, and concrete

Interview Preparation Tips

Interview preparation tips for other job seekers - Always conform which type work on site .this type questions asked by intervier

QA/QC Civil Engineer Interview Questions Asked at Other Companies

Q1. What to do when any building material come at site, and their tes ... read more
Q2. How much cement content in your mix design and types of concretes ... read more
Q3. How to prepare method statments and how flexible are you in worki ... read more
asked in Anoc
Q4. How can perform the work perfectly under pressure by upper Manage ... read more
asked in Adani Group
Q5. What is Is code for RMC plant calibration

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Sep 2018. There were 6 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Documents cheked
  • Q2. About your self
  • Q3. QC related disscusion
  • Q4. Field related experince base disscusion and how to imrove our project
  • Q5. Same as round 3 but point out the IS base

Interview Preparation Tips

Round: Resume Shortlist
Experience: 3+ year experince

General Tips: Very good experince and the good skill full staff and disscusion is very useful in my life.So this atmosphere to helpful our field and knowledge.

Thanks
Manish Kumar
Asst.Manager
(QC Civil)
Aarvee associates pvt ltd
Skills: Communication, Body Language, Problem Solving, Leadership, Presentation Skills, Time Management
Duration: 1-4 weeks
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Present Work Experience
  • Ans. 

    Experienced QA/QC Civil Engineer with a focus on quality assurance in construction projects, ensuring compliance with standards.

    • Conduct regular site inspections to ensure adherence to project specifications and safety standards.

    • Implement quality control procedures, such as material testing and inspection, to maintain project integrity.

    • Collaborate with project managers and contractors to resolve quality issues and impro...

  • Answered by AI
  • Q2. Salary Expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Skill Important for any interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. They are asking about experience

I appeared for an interview in Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. They asked me about RAM and ROM

Interview Preparation Tips

Round: Technical Interview
Experience: I studied about them before so it was not a problem for me

Skills: Coding Skills
College Name: IIT Kharagpur

I appeared for an interview before Aug 2016.

Interview Questionnaire 

1 Question

  • Q1. Questions on C++

Interview Preparation Tips

Round: Resume Shortlist
Experience: Only those with Java, C++ and JavaScript were shortlisted.

Round: Test
Experience: Pretty basic
Duration: 3 hours

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.

Isc Projects Interview FAQs

How many rounds are there in Isc Projects QA/QC Civil Engineer interview?
Isc Projects interview process usually has 3 rounds. The most common rounds in the Isc Projects interview process are HR, Resume Shortlist and Technical.
What are the top questions asked in Isc Projects QA/QC Civil Engineer interview?

Some of the top questions asked at the Isc Projects QA/QC Civil Engineer interview -

  1. Related of construction work on this si...read more
  2. Earthwork , bitumen & concrete related t...read more
  3. Railway work .ex. soil, and concr...read more

Tell us how to improve this page.

Isc Projects QA/QC Civil Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 437 Interviews
AECOM Interview Questions
4.2
 • 116 Interviews
Apco Infratech Interview Questions
3.7
 • 114 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all

Isc Projects QA/QC Civil Engineer Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

4.0

Skill development

1.0

Work-life balance

2.0

Salary

1.0

Job security

1.0

Company culture

2.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Executive Accountant
20 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Senior Engineer
19 salaries
unlock blur

₹4.5 L/yr - ₹8.6 L/yr

Project Manager
16 salaries
unlock blur

₹7.7 L/yr - ₹29.5 L/yr

Site Engineer
15 salaries
unlock blur

₹3 L/yr - ₹4.8 L/yr

Assistant Manager
14 salaries
unlock blur

₹6.5 L/yr - ₹10 L/yr

Explore more salaries
Compare Isc Projects with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview