i
Intertek
Filter interviews by
I applied via Approached by Company and was interviewed in Dec 2023. There were 5 interview rounds.
I'm simply and hard worker.
Loading, unloading weight quantity, and quality are important factors in ensuring product integrity.
Loading and unloading processes should be carefully monitored to prevent damage to the products.
Weight verification should be conducted to ensure accurate quantity of goods.
Quality checks should be performed to ensure that the products meet the required standards.
Examples: using weighing scales to measure the weight of g...
As per requirement opening closing stock date wise must
Timming attendance stock date wise Wearhouse equipment management PB opening closing
Planning for job work as per 3rd party
Operation Reporting details of commodities stock date location attend person date wise
Top trending discussions
I applied via Referral and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
Materials used in engineering can be classified into metals, polymers, ceramics, and composites.
Metals: strong, durable, conductive (e.g. steel, aluminum)
Polymers: lightweight, flexible, insulating (e.g. plastic, rubber)
Ceramics: hard, brittle, heat-resistant (e.g. porcelain, glass)
Composites: combination of materials for specific properties (e.g. carbon fiber reinforced polymers)
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
I follow various NDT methods such as visual inspection, liquid penetrant testing, magnetic particle testing, ultrasonic testing, and radiographic testing.
Visual inspection involves examining the surface of a component for any visible defects.
Liquid penetrant testing uses a liquid dye to detect surface-breaking defects.
Magnetic particle testing uses magnetic fields to identify surface and near-surface defects.
Ultrasonic...
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
The process for installing solar panels involves site assessment, mounting the panels, connecting to the electrical system, and testing functionality.
Site assessment to determine optimal location for maximum sunlight exposure
Mounting the panels securely on the roof or ground
Connecting the panels to the electrical system using inverters and wiring
Testing functionality through performance monitoring and inspection
Various types of quality tests are conducted in solar systems to ensure efficiency and reliability.
Quality tests for solar panels include performance testing, durability testing, and efficiency testing.
Other quality tests may involve checking for defects in materials, connections, and overall construction.
Regular maintenance and monitoring are also important quality control measures in solar systems.
Diploma in electrical engineering
I applied via Company Website
I applied via Approached by Company and was interviewed in Jun 2022. There was 1 interview round.
Some of the top questions asked at the Intertek Quality Executive interview -
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Inspection Engineer
318
salaries
| ₹0 L/yr - ₹0 L/yr |
Lab Technician
171
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
163
salaries
| ₹0 L/yr - ₹0 L/yr |
Chemist
65
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
58
salaries
| ₹0 L/yr - ₹0 L/yr |
SGS
Bureau Veritas
TÜV NORD
DNV GL