Filter interviews by
I applied via Referral and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
Emphasis on questions related to contracts & Quantity surveying but also requires knowledge related to civil engineering like design, quality control,supervision, maintenance,safety, environment,gender ratio, land acquisition & rehabilitation and all other aspects of highway and bridge construction.
Top trending discussions
posted on 12 Aug 2022
Problum Statement
Define problum
Empathy map
Persona
UseFlow
Sitemap
Custmer Journey map
Low fedility wire frame
High fedility wireframe
Prototype test
I applied via Campus Placement and was interviewed in Jun 2021. There were 4 interview rounds.
A line chart for a 10 km action plan with safety precautions, procurement, manpower, and equipment.
Identify safety precautions needed for the project
Procure necessary equipment and manpower
Create a timeline for the project
Allocate resources efficiently
Ensure compliance with regulations and standards
Monitor progress and adjust plan as needed
To calculate pup-piece length for a 12 inch pipeline with two sections already lowered and overlap 5m and s-bend rolling, two 90 degree LR bends.
Calculate the total length of the pipeline
Subtract the length of the two sections already lowered and overlap 5m
Add the length of the two 90 degree LR bends
Divide the result by 2 to get the length of each pup-piece
Collapse and damage percentage for HDD crossings are calculated based on various factors such as soil type, borehole diameter, and drilling fluid properties.
Collapse percentage is calculated using the Mohr-Coulomb failure criterion
Damage percentage is calculated based on the tensile strength of the pipe and the bending stress induced during the pullback process
Factors such as soil type, borehole diameter, and drilling ...
Methodology for rock excavation involves drilling, blasting, and removal of debris. Quantity is measured by volume or weight.
Drilling holes in rock using specialized equipment
Placing explosives in the holes and detonating them
Removing the debris using heavy machinery
Measuring the quantity of rock excavated by volume or weight
Using software to calculate the amount of explosives needed for a specific excavation project
posted on 13 Apr 2021
I applied via Newspaper Ad and was interviewed in Mar 2021. There was 1 interview round.
posted on 7 Jan 2021
I applied via Referral and was interviewed in Sep 2020. There were 4 interview rounds.
Interview experience
based on 109 reviews
Rating in categories
PHD Research Scholar
25
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Research Scholar
17
salaries
| ₹4 L/yr - ₹8 L/yr |
Senior Research Fellow
14
salaries
| ₹4.3 L/yr - ₹6.2 L/yr |
Research Associate
14
salaries
| ₹2 L/yr - ₹8.1 L/yr |
Assistant Manager
13
salaries
| ₹3 L/yr - ₹6.2 L/yr |
IIT Bombay
National Chemical Laboratory
Reliance Industries
Tata Chemicals