I applied via Company Website
Solar power generation is the process of converting sunlight into electricity using solar panels.
Solar power generation harnesses the energy from the sun to produce electricity.
It involves the use of solar panels, which contain photovoltaic cells that convert sunlight into direct current (DC) electricity.
The DC electricity is then converted into alternating current (AC) electricity using an inverter.
Solar power generat...
To generate more electricity using solar, we can increase the efficiency of solar panels, use advanced tracking systems, and implement solar power storage solutions.
Increase the efficiency of solar panels by using high-quality materials and improving manufacturing processes
Utilize advanced tracking systems to maximize the amount of sunlight captured by solar panels throughout the day
Implement solar power storage soluti...
I applied via Referral and was interviewed before May 2021. There was 1 interview round.
Good generation can be maintained by ensuring proper maintenance of equipment and regular training of personnel.
Regular maintenance of equipment
Proper training of personnel
Using advanced technology
Implementing safety measures
Monitoring and analyzing data
Continuous improvement
Collaboration with other departments
Effective communication
Top trending discussions
posted on 16 Aug 2021
posted on 14 Jan 2022
posted on 2 Apr 2022
I applied via Referral and was interviewed in Jan 2022. There were 4 interview rounds.
Expected CTC should be based on the candidate's experience, skills, and the industry standards.
Consider the candidate's years of experience in the field
Take into account the candidate's technical skills and expertise
Research industry standards for Senior Engineer salaries
Discuss with the candidate their salary expectations and negotiate if needed
A working drum elements system is a mechanism that allows for the efficient and effective movement of drums.
The system should be designed to handle drums of various sizes and weights
It should include components such as rollers, conveyors, and lifters
The system should be automated to reduce manual labor and increase productivity
Regular maintenance and inspections are necessary to ensure the system is functioning properl
I applied via Company Website and was interviewed in Feb 2022. There were 4 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
posted on 22 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
Meter testing as per IS standard involves verifying the accuracy and functionality of meters used for measuring electricity, water, gas, etc.
Meter testing should be conducted in accordance with the relevant IS standard (e.g. IS 13779 for electricity meters).
Testing involves checking the accuracy of the meter readings under various load conditions.
Calibration of the meter should be done periodically to ensure accurate m...
Distance relay configuration involves setting the relay to operate based on the distance of a fault from the relay location.
Distance relay settings include reach, time delay, and pickup values.
Testing involves injecting a fault at a known distance and verifying the relay operates within the set parameters.
Secondary injection testing can be used to simulate fault conditions for testing purposes.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Engineer
9
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Senior Engineer
9
salaries
| ₹3.6 L/yr - ₹7 L/yr |
Junior Engineer
7
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Electrical Engineer
6
salaries
| ₹2 L/yr - ₹4 L/yr |
Solar Technician
5
salaries
| ₹2 L/yr - ₹2.5 L/yr |
Dhoot Transmission
R.K.M Powergen
SHV Energy
Senvion