I applied via Referral and was interviewed in Jun 2019. There was 1 interview round.
Heat load calculation is the process of determining the amount of heat energy that needs to be removed or added to a space to maintain a comfortable temperature.
Heat load calculation takes into account factors such as the size of the space, the number of occupants, the amount of sunlight entering the space, and the type of equipment and appliances in the space.
The calculation involves determining the heat gain or loss ...
Equipment planning involves selecting the appropriate HVAC system based on building requirements and constraints.
Assess building requirements and constraints
Determine appropriate HVAC system type (e.g. central, split, VRF)
Select equipment based on system type and building needs
Consider energy efficiency and sustainability
Ensure compliance with codes and regulations
BOQ & tender preparation process involves creating a detailed list of materials and labor required for a project and soliciting bids from contractors.
Create a detailed Bill of Quantities (BOQ) that lists all materials and labor required for the project
Solicit bids from contractors by sending out a Request for Quotation (RFQ) or Request for Proposal (RFP)
Evaluate bids based on criteria such as cost, experience, and repu...
I applied via Walk-in and was interviewed before Apr 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.
based on 4 reviews
Rating in categories
Electrical Design Engineer
5
salaries
| ₹4.2 L/yr - ₹8.4 L/yr |
TCS
Accenture
Cognizant
Infosys