i
Indus Towers
Filter interviews by
I applied via Company Website and was interviewed in Dec 2021. There were 3 interview rounds.
The documents required for installing a mobile tower include land ownership documents, NOC from local authorities, structural stability certificate, and environmental clearance.
Land ownership documents to prove the availability of land for tower installation
No Objection Certificate (NOC) from local authorities to ensure compliance with regulations
Structural stability certificate to ensure the tower can withstand enviro...
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are used to increase or decrease the voltage of an alternating current (AC) power supply.
They consist of two coils of wire, called the primary and secondary, wrapped around a magnetic core.
When an AC current flows through the primary coil, it creates a magnetic field that in...
posted on 12 Jan 2025
I applied via Walk-in and was interviewed before Jan 2024. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Jun 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
Multiple questions for technical rounds
VoIP call flow refers to the sequence of events that occur during a VoIP call.
The call is initiated by the caller's device sending a SIP INVITE message to the recipient's device.
The recipient's device responds with a SIP 180 Ringing message to indicate that the call is being set up.
Once the call is answered, the devices exchange RTP packets containing the audio data.
When the call is finished, the devices send SIP BYE m
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 3 interview rounds.
EFL stands for English as a Foreign Language. OFC stands for Optical Fiber Cable.
EFL refers to the teaching or learning of English in a non-English speaking country.
OFC is a type of cable made of thin strands of glass or plastic that transmit data using light.
OFC is commonly used for high-speed internet and telecommunications.
EFL is often taught in language schools or universities to non-native speakers.
EFL teachers ma...
based on 1 review
Rating in categories
Assistant Manager
330
salaries
| ₹6 L/yr - ₹17 L/yr |
MIS Executive
316
salaries
| ₹1.6 L/yr - ₹5 L/yr |
Manager
260
salaries
| ₹8 L/yr - ₹26 L/yr |
Field Support Engineer
225
salaries
| ₹3.2 L/yr - ₹7.2 L/yr |
Senior Executive
214
salaries
| ₹1.9 L/yr - ₹10.6 L/yr |
Sterlite Technologies
Cisco
BT Business
Lumen Technologies