Technical aptitude related to wiring, symbol identify, software related
I was interviewed in Nov 2024.
The procedure for wind calculation as per IS code involves determining the design wind speed, selecting the appropriate terrain category, and calculating the wind pressure.
Determine the design wind speed based on the location and height of the structure.
Select the appropriate terrain category (rural, urban, etc.) as per IS code guidelines.
Calculate the wind pressure using the formula provided in the IS code.
Consider fa...
A STAAD model for a fixed pole is a structural analysis and design model used to determine the stability and strength of a pole that is fixed in place.
In a STAAD model for a fixed pole, the pole is typically modeled as a vertical member with fixed supports at the base.
The model considers factors such as wind loads, dead loads, and any other relevant loads that may act on the pole.
The analysis helps in determining the s...
Key considerations in designing a square base plate
Ensure the base plate is large enough to support the load without excessive deflection
Select appropriate material and thickness to meet structural requirements
Consider the connection details for attaching the base plate to the structure
Account for any potential corrosion or environmental factors that may affect the base plate
Include provisions for anchor bolts or other...
My name is John Smith.
Full name is John Smith
Common name in English-speaking countries
Easy to remember and pronounce
I have 2 years of experience working as a Junior Assistant in a busy office environment.
2 years of experience as a Junior Assistant
Proficient in office administration tasks
Skilled in using Microsoft Office suite
Excellent communication and organizational skills
I have worked on various types of projects including data analysis, event planning, and marketing campaigns.
Data analysis project for a retail company to identify customer trends
Event planning project for a charity fundraiser event
Marketing campaign project for a new product launch
I have experience operating various types of office equipment such as printers, scanners, and copiers.
Printers
Scanners
Copiers
To plan for production tomorrow, it is important to assess current inventory, review upcoming orders, allocate resources, and communicate with team members.
Assess current inventory levels to determine what needs to be produced
Review upcoming orders to prioritize production schedule
Allocate resources such as materials, equipment, and manpower accordingly
Communicate with team members to ensure everyone is aware of their
The least count of a micrometer is 0.01 mm and the least count of a caliper is 0.02 mm.
Micrometer least count: 0.01 mm
Caliper least count: 0.02 mm
Concentricity, total runout, flatness, rf, and rt are important measurements in engineering and manufacturing.
Concentricity refers to the tolerance of the center point of a feature relative to its axis.
Total runout measures the maximum amount a feature may vary from true circularity when rotated.
Flatness is the deviation of a surface from a perfect plane.
Rf (roughness factor) and Rt (roughness total) are measurements o...
posted on 20 Jan 2025
I applied via Campus Placement and was interviewed in Dec 2024. There were 2 interview rounds.
posted on 11 Jan 2025
I applied via Naukri.com and was interviewed in May 2024. There were 3 interview rounds.
Coding+ mcqs questions are there. It is time based test.
posted on 13 Jan 2025
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
Project approaches are the methods or strategies used to plan, execute, and complete a project.
Project management methodologies such as Agile, Waterfall, and Scrum
Risk management approaches to identify and mitigate potential project risks
Change management strategies to handle changes during the project
Communication plans to ensure effective communication among project stakeholders
Project Life Cycle is the series of phases that a project goes through from initiation to completion.
Initiation: Define the project at a broad level.
Planning: Develop a detailed project plan.
Execution: Carry out the project plan.
Monitoring and Controlling: Track and manage project performance.
Closing: Finalize all activities and formally close the project.
Example: In construction, project life cycle includes design, co
based on 23 reviews
Rating in categories
Quality Engineer
12
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Production Supervisor
9
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Design Engineer
6
salaries
| ₹2 L/yr - ₹3.8 L/yr |
Quality Inspector
6
salaries
| ₹1.5 L/yr - ₹2.2 L/yr |
Quality Supervisor
5
salaries
| ₹3 L/yr - ₹4 L/yr |
Kirloskar Ferrous Industries
Electrosteel Casting
Steelcast
Dynamatic Technologies