Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by India Power Corporation Team. If you also belong to the team, you can get access from here

India Power Corporation Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

India Power Corporation Assistant Manager Interview Questions and Answers for Experienced

Updated 28 Feb 2024

India Power Corporation Assistant Manager Interview Experiences for Experienced

1 interview found

Assistant Manager Interview Questions & Answers

user image Suman Mandal

posted on 28 Feb 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2023. There were 4 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Question from relevant stream.
Round 2 - One-on-one 

(1 Question)

  • Q1. Personality test
Round 3 - Case Study 

Past case study and how you slove it

Round 4 - HR 

(1 Question)

  • Q1. Some assessment and salary discussion

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(7 Questions)

  • Q1. Previous job roles & responsibilitys
  • Q2. Background verification
  • Q3. Salary discussion
  • Q4. Briefing about RenewSys
  • Q5. Documents verification
  • Q6. Finally selected
  • Q7. Offer letter released

Interview Preparation Tips

Interview preparation tips for other job seekers - NC
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Release to work
  • Q2. Release to over all experience
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - One-on-one 

(7 Questions)

  • Q1. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and belt clamping take-up up and blumber block top cover open and slue Ba...
  • Ans. 

    Belt clamping take-up pulley up and blumber block top cover open and slue Barring remove and new slue Barring checking and replace and bolts nut tightening sure and top cover fixed and bolts nut tightening sure and belt clamping and tackup pulley down and paper work cancelled and conveyer belt running ok

  • Answered by arbindkumarsingh
  • Q2. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and v-scraper remove and new v-scraper replace and bolts nut tigh...
  • Q3. Roller changed and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and fream number mark and Roller shift and Roller cut change and walked awa...
  • Q4. Motor replace work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and motor remove and new motor replace and bolts nut tightening sure and ...
  • Ans. 

    Old motor bolts nut open and new motor replace and bolts nut tightening sure and Dayal gauge eliminate process ok and paper work cancelled and conveyer belt running ok

  • Answered by arbindkumarsingh
  • Q5. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and gear box remove and new gear box replace and bolts nut tighten...
  • Ans. 

    Walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tightening sure and Dayal gauge eliminate process ok paper work cancelled and conveyer belt running ok

  • Answered by arbindkumarsingh
  • Q6. Conveyer Barring checking and savings greasing work and safety first and all ppes sure and paper work and all pulley checking and savings Greasing sure and paper work cancelled and conveyer belt running o...
  • Q7. Fluid coupling oil replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolt nut open and old clean and fresh and new Oli Pur dropped and bolt...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Material , cad modelling
  • Q2. Previous projects, welding ndt

Interview Preparation Tips

Interview preparation tips for other job seekers - Welding , ndt , calculations, modeling, nut blots , Assembly
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
-

I applied via Walk-in and was interviewed before May 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Technical & sense of humor knowledge position related

Round 3 - One-on-one 

(4 Questions)

  • Q1. The previous job related knowledge and technical knowledge
  • Q2. Previous job responsibilities, working & process
  • Q3. Previous job-related process , equipment
  • Q4. What is your plant process
  • Ans. 

    Our plant process involves several stages including raw material procurement, production, quality control, and packaging.

    • We start by procuring high-quality raw materials from trusted suppliers.

    • The raw materials are then processed through various stages of production to create the final product.

    • Throughout the production process, we have strict quality control measures in place to ensure the product meets our high standa...

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. HR-related formalities, policy and system discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - More study related previous job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. As per our resume past experience
Round 3 - One-on-one 

(1 Question)

  • Q1. Details about Job description
Round 4 - HR 

(1 Question)

  • Q1. Personal information and previous experience documents
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About experience
Round 2 - One-on-one 

(2 Questions)

  • Q1. What type liaison you do at your present organization
  • Ans. 

    I regularly liaise with various departments to ensure smooth operations and communication.

    • Coordinate with sales team to track inventory levels

    • Collaborate with HR for recruitment and training programs

    • Communicate with IT department for software updates

    • Work closely with finance team for budget planning

  • Answered by AI
  • Q2. What is TSR and 30 years record of land.
  • Ans. 

    TSR stands for Town Survey Record, a document maintained by the government that contains details of land ownership and usage over the past 30 years.

    • TSR is a record maintained by the government to keep track of land ownership and usage.

    • It contains information about the history of land transactions, ownership changes, and land use patterns over the past 30 years.

    • TSR is important for verifying land ownership, resolving di...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interviews and excellent HR response
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to manage 100mw wtg spare
  • Ans. 

    Managing 100mw wtg spare involves efficient planning, inventory management, and proactive maintenance.

    • Develop a comprehensive spare parts inventory management system

    • Regularly assess the condition of spare parts and replace as needed

    • Implement preventive maintenance strategies to minimize downtime

    • Establish strong relationships with suppliers to ensure timely availability of spare parts

    • Monitor and analyze data to identify...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. WTG operation and different between synchronous and asynchronous generator
  • Ans. 

    WTG operation involves converting wind energy into electrical energy. Synchronous generators produce power at a constant speed, while asynchronous generators vary in speed.

    • Wind turbine generators (WTGs) convert wind energy into electrical energy through the use of a rotor and a generator.

    • Synchronous generators produce power at a constant speed that is synchronized with the grid frequency.

    • Asynchronous generators, also k...

  • Answered by AI
  • Q2. Explain as per WTG technology
  • Ans. 

    WTG technology refers to Wind Turbine Generator technology used in renewable energy production.

    • WTG technology involves the use of wind turbines to generate electricity.

    • The turbines are typically placed in locations with high wind speeds to maximize energy production.

    • The generated electricity is then fed into the grid for distribution to consumers.

    • Maintenance of the turbines is crucial to ensure optimal performance and ...

  • Answered by AI

India Power Corporation Interview FAQs

How many rounds are there in India Power Corporation Assistant Manager interview for experienced candidates?
India Power Corporation interview process for experienced candidates usually has 4 rounds. The most common rounds in the India Power Corporation interview process for experienced candidates are Technical, One-on-one Round and Case Study.
How to prepare for India Power Corporation Assistant Manager interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at India Power Corporation. The most common topics and skills that interviewers at India Power Corporation expect are Coal, 220Kv, ABAP, AMR and Agreements.
What are the top questions asked in India Power Corporation Assistant Manager interview for experienced candidates?

Some of the top questions asked at the India Power Corporation Assistant Manager interview for experienced candidates -

  1. Question from relevant stre...read more
  2. Personality t...read more

Tell us how to improve this page.

India Power Corporation Assistant Manager Interview Process for Experienced

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Power Interview Questions
3.9
 • 170 Interviews
Suzlon Group Interview Questions
4.1
 • 131 Interviews
Renewsys India Interview Questions
4.0
 • 15 Interviews
SHV Energy Interview Questions
3.7
 • 14 Interviews
View all
India Power Corporation Assistant Manager Salary
based on 60 salaries
₹4.5 L/yr - ₹10.5 L/yr
18% less than the average Assistant Manager Salary in India
View more details

India Power Corporation Assistant Manager Reviews and Ratings

based on 15 reviews

4.1/5

Rating in categories

3.5

Skill development

4.0

Work-life balance

3.5

Salary

3.9

Job security

3.6

Company culture

3.3

Promotions

3.7

Work satisfaction

Explore 15 Reviews and Ratings
Assistant Manager
60 salaries
unlock blur

₹4.5 L/yr - ₹10.5 L/yr

Deputy Manager
37 salaries
unlock blur

₹5 L/yr - ₹13.5 L/yr

Executive
34 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Executive Engineer
19 salaries
unlock blur

₹3.2 L/yr - ₹7.2 L/yr

Assistant General Manager
12 salaries
unlock blur

₹16 L/yr - ₹27 L/yr

Explore more salaries
Compare India Power Corporation with

Suzlon Group

4.1
Compare

Tata Power

3.9
Compare

Dhoot Transmission

3.7
Compare

SAEL Industries Limited

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview