Filter interviews by
Flexible pavement construction involves multiple layers to distribute loads and provide durability against environmental factors.
1. Subgrade Preparation: Ensure a stable and compacted subgrade to support the pavement structure.
2. Granular Base Course: Lay a layer of crushed stone or gravel to provide drainage and load distribution.
3. Asphalt Binder Layer: Apply a binder layer of asphalt to enhance flexibility and ...
The current CTC is the salary the candidate is currently earning, while the expected CTC is the salary they are hoping to receive in the new position.
Current CTC refers to the candidate's current salary or compensation package.
Expected CTC refers to the salary or compensation package the candidate is expecting or hoping to receive in the new position.
It is important for the candidate to provide realistic and reaso...
Computer programming language is a set of instructions used to communicate with a computer. To download information from the internet, you can use web scraping techniques.
Computer programming language is a way to communicate with computers through a set of instructions.
To download information from the internet, you can use web scraping techniques like using libraries such as BeautifulSoup in Python or requests in ...
The duration and machinery requirement for dumping and compacting one lakh cum of soil.
The duration depends on the capacity of the machinery and the number of machines used.
The type of soil and the site conditions also affect the duration.
On average, it takes around 30-45 days to complete the task.
The machinery required includes excavators, bulldozers, dump trucks, and compactors.
Site management involves overseeing the operations and activities at a construction site, including labor and vendor management.
Site management involves coordinating and supervising all activities at a construction site.
It includes managing the labor force, ensuring they have the necessary skills and resources to complete tasks.
Labor management involves assigning tasks, monitoring progress, and addressing any issu...
Physical testing of cement, aggregate, soil, and concrete and calibration of batching plant and equipment.
Physical testing of cement involves determining its compressive strength, fineness, and setting time.
Aggregate testing includes determining its size, shape, and texture.
Soil testing involves determining its moisture content, density, and shear strength.
Concrete testing includes determining its compressive stre...
Site supervision involves overseeing the execution of HT, LT, and DTR installations.
Site supervision ensures that the installations are carried out according to specifications and safety standards.
It involves coordinating with contractors, technicians, and other stakeholders to ensure smooth execution.
Monitoring progress, resolving any issues or conflicts that may arise during the installation process.
Ensuring com...
In this aptitude test are held on some mathematics questions and computer based questions.
Computer programming language is a set of instructions used to communicate with a computer. To download information from the internet, you can use web scraping techniques.
Computer programming language is a way to communicate with computers through a set of instructions.
To download information from the internet, you can use web scraping techniques like using libraries such as BeautifulSoup in Python or requests in JavaS...
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.
I appeared for an interview before Jun 2024, where I was asked the following questions.
I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
PERSONAL DETAILS & EXPERIENCE
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
Physical testing of cement, aggregate, soil, and concrete and calibration of batching plant and equipment.
Physical testing of cement involves determining its compressive strength, fineness, and setting time.
Aggregate testing includes determining its size, shape, and texture.
Soil testing involves determining its moisture content, density, and shear strength.
Concrete testing includes determining its compressive strength,...
I applied via Naukri.com and was interviewed before Jun 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Dec 2021. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the IL&FS Engineering and Construction interview -
based on 10 interview experiences
Difficulty level
Duration
based on 427 reviews
Rating in categories
Senior Engineer
39
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Assistant Manager
22
salaries
| ₹6 L/yr - ₹10 L/yr |
Deputy Manager
22
salaries
| ₹7.2 L/yr - ₹12.5 L/yr |
Engineer
13
salaries
| ₹2.2 L/yr - ₹5.1 L/yr |
Senior Planning Engineer
11
salaries
| ₹5.2 L/yr - ₹7.2 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon