The Hydraulic Powerpack problem involves troubleshooting and resolving issues related to hydraulic powerpacks.
Identify the specific problem with the hydraulic powerpack
Check for any leaks or damaged components
Inspect the hydraulic fluid level and quality
Examine the pressure and flow rate of the hydraulic system
Test the functionality of valves, pumps, and motors
Troubleshoot electrical connections and controls
Perform nec...
I applied via Walk-in and was interviewed before Apr 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.
based on 2 reviews
Rating in categories
TCS
Accenture
Wipro
Cognizant