Filter interviews by
I applied via Company Website and was interviewed in Aug 2024. There was 1 interview round.
Duct measurement can be calculated by determining the cross-sectional area of the duct and multiplying it by the air velocity.
Calculate the cross-sectional area of the duct (A = πr^2 for circular ducts, A = l x w for rectangular ducts)
Measure the air velocity using an anemometer
Multiply the cross-sectional area by the air velocity to get the duct measurement
Aspect ratio is the ratio of the width to the height of an image or screen.
Aspect ratio is typically expressed as two numbers separated by a colon, such as 16:9.
Common aspect ratios include 4:3 (standard TV), 16:9 (widescreen TV), and 3:2 (35mm film).
Aspect ratio affects how images and videos are displayed on screens, with wider ratios showing more content horizontally.
I applied via Approached by Company and was interviewed in May 2024. There were 3 interview rounds.
posted on 23 Mar 2024
I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.
I applied via LinkedIn and was interviewed before Feb 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Fraud control at site is crucial and can be achieved through a combination of measures.
Implementing strict access control measures
Conducting regular audits and inspections
Establishing clear policies and procedures for reporting and investigating fraud
Training employees on fraud prevention and detection
Collaborating with law enforcement agencies
Using technology to monitor and detect fraudulent activities
Parameters of a project include scope, time, cost, quality, resources, and risks.
Scope defines the boundaries and deliverables of the project.
Time refers to the project schedule and deadlines.
Cost includes the budget and financial resources required for the project.
Quality refers to the standards and expectations for the project outcomes.
Resources include the people, equipment, and materials needed for the project.
Risk...
I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.
Rate analysis of 1 cum of B/W
B/W stands for Brickwork
Rate analysis involves calculating the cost of materials, labor, and equipment required for a project
Factors that affect the rate analysis include location, availability of materials, and labor costs
The rate analysis for 1 cum of B/W would depend on the specific project requirements and materials used
based on 10 reviews
Rating in categories
Project Engineer
39
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Project Engineer Hvac
22
salaries
| ₹2.6 L/yr - ₹4.6 L/yr |
Project Manager
22
salaries
| ₹4.4 L/yr - ₹11 L/yr |
Senior Project Engineer
17
salaries
| ₹4 L/yr - ₹6.4 L/yr |
Assistant Project Manager
15
salaries
| ₹4.1 L/yr - ₹6.6 L/yr |
Blue Star
Voltas
Daikin
Carrier