Filter interviews by
Clear (1)
I applied via Campus Placement and was interviewed before Apr 2023. There were 3 interview rounds.
Top trending discussions
posted on 29 Feb 2024
I applied via Campus Placement
posted on 25 May 2024
I applied via Campus Placement and was interviewed in Apr 2024. There were 3 interview rounds.
posted on 13 May 2022
I applied via Walk-in and was interviewed in Apr 2022. There were 2 interview rounds.
posted on 3 Sep 2024
posted on 30 Aug 2024
posted on 9 Mar 2023
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
posted on 27 Nov 2021
Managing production line involves optimizing processes, ensuring quality control, and minimizing downtime.
Develop and implement standard operating procedures
Monitor production metrics and adjust processes as needed
Train and supervise production staff
Maintain equipment and perform regular maintenance checks
Implement quality control measures
Minimize downtime through efficient scheduling and preventative maintenance
Line rejection can be managed by identifying the root cause, implementing corrective actions, and monitoring the process.
Identify the root cause of rejection
Implement corrective actions to address the root cause
Monitor the process to ensure the corrective actions are effective
Use statistical process control to identify trends and prevent future rejections
posted on 12 Mar 2024
I appeared for an interview before Mar 2023.
posted on 10 Jan 2023
I applied via Ak job portal and was interviewed in Jul 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
Engineer
61
salaries
| ₹4.4 L/yr - ₹9 L/yr |
Senior Engineer
45
salaries
| ₹6.8 L/yr - ₹12.5 L/yr |
Assistant Engineer
41
salaries
| ₹3 L/yr - ₹6.3 L/yr |
Assistant Manager
36
salaries
| ₹9.4 L/yr - ₹15.1 L/yr |
Senior Executive
22
salaries
| ₹7 L/yr - ₹10 L/yr |
Mahindra Powerol
Kirloskar Electric Company
Cummins
Suzuki Motorcycle