Filter interviews by
Clear (1)
Top trending discussions
I appeared for an interview in Dec 2016.
A two-stroke engine completes a power cycle in two strokes of the piston, while a four-stroke engine completes it in four strokes.
Two-stroke engines have a simpler design and are lighter than four-stroke engines.
Two-stroke engines have a higher power-to-weight ratio but lower fuel efficiency compared to four-stroke engines.
Four-stroke engines have separate intake, compression, power, and exhaust strokes, while two-stro...
A pictorial representation of a SI engine with valve opening, TDC, and BDC.
SI engine stands for Spark Ignition engine, which is commonly used in gasoline-powered vehicles.
Valve opening refers to the movement of the intake and exhaust valves to allow fuel-air mixture in and exhaust gases out of the combustion chamber.
TDC (Top Dead Center) is the position of the piston at the extreme top of its stroke.
BDC (Bottom Dead Ce...
I would improve the fuel efficiency of TVS motorcycles by implementing advanced engine technology.
Implementing electronic fuel injection system for better fuel management
Introducing hybrid technology for improved mileage
Optimizing aerodynamics of the motorcycle for reduced drag
Using lightweight materials for better fuel economy
I am a dedicated production engineer with a strong background in manufacturing processes and quality control.
Graduated with a degree in Mechanical Engineering
Experience working in a manufacturing plant for 3 years
Proficient in CAD software for designing production layouts
Implemented lean manufacturing principles to improve efficiency
Led a team in reducing production downtime by 20%
I applied via Campus Placement and was interviewed before Aug 2021. There were 4 interview rounds.
I applied via Referral and was interviewed before Jan 2020. There were 3 interview rounds.
posted on 16 Nov 2021
I applied via Recruitment Consultant and was interviewed in Oct 2021. There was 1 interview round.
posted on 27 Nov 2021
Managing production line involves optimizing processes, ensuring quality control, and minimizing downtime.
Develop and implement standard operating procedures
Monitor production metrics and adjust processes as needed
Train and supervise production staff
Maintain equipment and perform regular maintenance checks
Implement quality control measures
Minimize downtime through efficient scheduling and preventative maintenance
Line rejection can be managed by identifying the root cause, implementing corrective actions, and monitoring the process.
Identify the root cause of rejection
Implement corrective actions to address the root cause
Monitor the process to ensure the corrective actions are effective
Use statistical process control to identify trends and prevent future rejections
posted on 11 Oct 2021
posted on 30 Aug 2024
I applied via Campus Placement and was interviewed in Mar 2024. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Jun 2022. There were 2 interview rounds.
based on 3 interviews
Interview experience
based on 2 reviews
Rating in categories
Engineer
61
salaries
| ₹4.4 L/yr - ₹9 L/yr |
Senior Engineer
45
salaries
| ₹6.8 L/yr - ₹12.5 L/yr |
Assistant Engineer
41
salaries
| ₹3 L/yr - ₹6.3 L/yr |
Assistant Manager
36
salaries
| ₹9.4 L/yr - ₹15.1 L/yr |
Senior Executive
22
salaries
| ₹7 L/yr - ₹10 L/yr |
Mahindra Powerol
Kirloskar Electric Company
Cummins
Suzuki Motorcycle