Filter interviews by
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
posted on 21 Jun 2024
I applied via LinkedIn and was interviewed before Jun 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 3 interview rounds.
Led a team in implementing a new customer relationship management system for a retail company.
Managed project timeline and budget effectively
Collaborated with cross-functional teams to gather requirements
Provided training and support to end users
Successfully launched the system with minimal disruptions
Manegement Topic of running our company
Current transformer secondary is open to prevent damage to the transformer and connected equipment.
An open secondary circuit prevents excessive current flow and protects the transformer from damage.
It allows for safe measurement and monitoring of current without risk of short circuits.
An open secondary also prevents damage to connected equipment by isolating it from high currents.
In case of a fault or overload, an open...
CT and PT are both electrical devices used in power systems, but they have different functions and applications.
CT stands for Current Transformer, while PT stands for Potential Transformer.
CTs are used to measure and transform high currents into manageable levels for instruments and protective relays.
PTs are used to measure and transform high voltages into low voltages for instruments and protective relays.
CTs are typi...
The single line diagram for HY to LT Panel diagram is a visual representation of the electrical connections and components in the system.
The single line diagram shows the flow of electrical power from the HY (High Voltage) side to the LT (Low Tension) side.
It includes the main components such as transformers, circuit breakers, switches, and control devices.
The diagram also indicates the interconnections between differe...
The number of circuit breakers used in an electrical system varies depending on the size and complexity of the system.
The number of circuit breakers used in an electrical system depends on factors such as the size of the system, the number of circuits, and the specific requirements of the building or facility.
Residential electrical systems typically have a main circuit breaker at the electrical panel, along with indivi...
In a power failure situation, effective management involves ensuring safety, communication, and contingency planning.
Ensure the safety of employees and customers by providing emergency lighting and clear evacuation procedures.
Maintain open lines of communication with staff, customers, and relevant authorities to provide updates and coordinate actions.
Implement contingency plans such as backup power sources, alternative...
B check in a generator refers to a comprehensive inspection and maintenance procedure to ensure its proper functioning.
B check involves a thorough examination of the generator's components, including the engine, fuel system, cooling system, electrical system, and control panel.
It includes tasks such as checking for leaks, inspecting belts and hoses, testing the battery, cleaning or replacing filters, and verifying prop...
I applied via Job Fair and was interviewed before Apr 2017. There were 5 interview rounds.
based on 1 interview
Interview experience
based on 15 reviews
Rating in categories
Regional Business Manager
53
salaries
| ₹24 L/yr - ₹48.5 L/yr |
Sales Manager
35
salaries
| ₹12 L/yr - ₹23.5 L/yr |
Territory Manager
34
salaries
| ₹9.6 L/yr - ₹15.8 L/yr |
Area Sales Manager
20
salaries
| ₹9 L/yr - ₹19 L/yr |
Manager
13
salaries
| ₹9.7 L/yr - ₹25.5 L/yr |
Mitsubishi Electric India
Delta Electronics
Livguard
Ukb Electronics