Filter interviews by
I applied via Company Website and was interviewed in Dec 2020. There were 3 interview rounds.
To make a product good quality, it needs to meet customer requirements and industry standards.
Understand customer needs and expectations
Define quality standards and requirements
Implement quality control processes
Conduct thorough testing and inspections
Continuously improve product based on feedback
Ensure compliance with industry regulations and standards
I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
The latest version of PPAP is PPAP 4th Edition.
PPAP stands for Production Part Approval Process.
The 4th Edition of PPAP was released in 2006.
It is a standardized process in the automotive industry to ensure that suppliers meet the requirements for production parts.
PPAP includes documentation such as design records, engineering change documents, and control plans.
It also involves conducting various tests and measurement...
FMEA is a method used during development to identify and mitigate potential failures in a system or process.
FMEA stands for Failure Mode and Effects Analysis.
It is a systematic approach to identify and prioritize potential failures in a system or process.
FMEA helps in understanding the potential causes and effects of failures.
It is used to assess the severity, occurrence, and detectability of failures.
By analyzing fail...
DVP&R stands for Design Verification Plan and Report. It is a process used to ensure that a product meets its design specifications.
DVP&R is a structured approach to testing and validating a product's design.
It involves creating a plan for testing the product, executing the tests, and documenting the results.
The plan includes details such as the test objectives, test methods, acceptance criteria, and test schedule.
The ...
NDC stands for National Drug Code. It is a unique identifier for drugs in the United States.
NDC is a 10-digit code that identifies drugs, including prescription and over-the-counter medications.
The first segment of the NDC represents the labeler code, which identifies the manufacturer or distributor of the drug.
The second segment represents the product code, which identifies the specific drug formulation and strength.
T...
PPAP file making is done during the production validation stage of NPD work.
PPAP file making is a part of the production validation process in NPD work
It involves documenting the production process and ensuring it meets customer requirements
PPAP file making is typically done after the design and development stages
It includes documentation such as control plans, process flow diagrams, and inspection records
The ppm in 6 sigma is 3.4 defects per million opportunities (DPMO).
6 sigma aims for a defect rate of 3.4 DPMO.
PPM stands for parts per million.
DPMO is a measure of process performance.
The lower the DPMO, the better the process performance.
Achieving 6 sigma means having a process that produces 99.99966% defect-free output.
Pareto chart is a problem-solving tool used to identify and prioritize the causes of a problem.
Pareto chart is a bar graph that displays the relative frequency or size of problems in descending order of importance.
It helps to identify the vital few causes that account for the majority of the problems.
It is based on the Pareto principle, also known as the 80/20 rule, which states that 80% of the effects come from 20% of...
I was interviewed in Jun 2022.
I am an experienced Senior Engineer with a strong background in software development and project management.
Over 10 years of experience in software development
Proficient in multiple programming languages such as Java, C++, and Python
Extensive knowledge of software development methodologies and best practices
Proven track record of successfully leading and delivering complex projects
Strong problem-solving and analytical ...
8D report is a problem-solving methodology used to identify, correct and prevent recurring problems.
8D stands for 8 Disciplines
It involves a team-based approach to problem-solving
The report includes a detailed description of the problem, root cause analysis, corrective actions, and preventive measures
Example: A manufacturing company received customer complaints about a defect in their product. The team used the 8D repo...
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
Spares management involves inventory control, procurement, and maintenance planning.
Create a detailed inventory of all spares and their usage frequency.
Establish a procurement process that ensures timely availability of spares.
Implement a maintenance plan that includes regular inspection and replacement of spares.
Use technology such as barcoding and RFID to track spares and prevent loss or theft.
Regularly review and up...
Shift issues can be managed by effective communication, proper scheduling, and providing necessary resources.
Establish clear communication channels between team members and management
Create a schedule that takes into account employee preferences and availability
Ensure that all necessary resources are available for each shift
Regularly review and adjust the schedule as needed
Provide training and support for employees to ...
based on 5 reviews
Rating in categories
Senior Engineer
253
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
160
salaries
| ₹0 L/yr - ₹0 L/yr |
Technical Lead
131
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Software Engineer
101
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
97
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
Spark Minda
Varroc Group
Exide Industries