I applied via Referral and was interviewed in Apr 2024. There were 3 interview rounds.
V cycle is a software development model where each phase is completed before moving to the next, resembling the shape of a 'V'.
V cycle consists of two major phases - the left side of the 'V' represents the development phase, while the right side represents the testing phase.
Requirements are gathered at the top of the 'V', followed by design, implementation, and testing phases.
Each phase must be completed before progres...
Regression testing is the process of retesting a software application to ensure that new code changes have not adversely affected existing functionality.
Regression testing is performed after code changes to verify that the existing functionality still works correctly.
It helps in identifying any defects introduced by new code changes.
Automated testing tools are often used to streamline the regression testing process.
Reg...
Boundary value analysis is a software testing technique where test cases are designed around the boundaries of input ranges.
Focuses on testing at the boundaries of input ranges
Helps identify errors that occur at boundaries
Reduces the number of test cases needed
Examples: testing a range of 1-10 would include test cases for 0, 1, 10, and 11
Top trending discussions
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 6 interview rounds.
Introduction and few case study intraction with MD sir
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
The latest version of PPAP is PPAP 4th Edition.
PPAP stands for Production Part Approval Process.
The 4th Edition of PPAP was released in 2006.
It is a standardized process in the automotive industry to ensure that suppliers meet the requirements for production parts.
PPAP includes documentation such as design records, engineering change documents, and control plans.
It also involves conducting various tests and measurement...
FMEA is a method used during development to identify and mitigate potential failures in a system or process.
FMEA stands for Failure Mode and Effects Analysis.
It is a systematic approach to identify and prioritize potential failures in a system or process.
FMEA helps in understanding the potential causes and effects of failures.
It is used to assess the severity, occurrence, and detectability of failures.
By analyzing fail...
DVP&R stands for Design Verification Plan and Report. It is a process used to ensure that a product meets its design specifications.
DVP&R is a structured approach to testing and validating a product's design.
It involves creating a plan for testing the product, executing the tests, and documenting the results.
The plan includes details such as the test objectives, test methods, acceptance criteria, and test schedule.
The ...
NDC stands for National Drug Code. It is a unique identifier for drugs in the United States.
NDC is a 10-digit code that identifies drugs, including prescription and over-the-counter medications.
The first segment of the NDC represents the labeler code, which identifies the manufacturer or distributor of the drug.
The second segment represents the product code, which identifies the specific drug formulation and strength.
T...
PPAP file making is done during the production validation stage of NPD work.
PPAP file making is a part of the production validation process in NPD work
It involves documenting the production process and ensuring it meets customer requirements
PPAP file making is typically done after the design and development stages
It includes documentation such as control plans, process flow diagrams, and inspection records
The ppm in 6 sigma is 3.4 defects per million opportunities (DPMO).
6 sigma aims for a defect rate of 3.4 DPMO.
PPM stands for parts per million.
DPMO is a measure of process performance.
The lower the DPMO, the better the process performance.
Achieving 6 sigma means having a process that produces 99.99966% defect-free output.
Pareto chart is a problem-solving tool used to identify and prioritize the causes of a problem.
Pareto chart is a bar graph that displays the relative frequency or size of problems in descending order of importance.
It helps to identify the vital few causes that account for the majority of the problems.
It is based on the Pareto principle, also known as the 80/20 rule, which states that 80% of the effects come from 20% of...
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
Spares management involves inventory control, procurement, and maintenance planning.
Create a detailed inventory of all spares and their usage frequency.
Establish a procurement process that ensures timely availability of spares.
Implement a maintenance plan that includes regular inspection and replacement of spares.
Use technology such as barcoding and RFID to track spares and prevent loss or theft.
Regularly review and up...
Shift issues can be managed by effective communication, proper scheduling, and providing necessary resources.
Establish clear communication channels between team members and management
Create a schedule that takes into account employee preferences and availability
Ensure that all necessary resources are available for each shift
Regularly review and adjust the schedule as needed
Provide training and support for employees to ...
based on 1 interview
Interview experience
Senior Engineer
253
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
160
salaries
| ₹0 L/yr - ₹0 L/yr |
Technical Lead
131
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Software Engineer
101
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
97
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
Spark Minda
Varroc Group
Exide Industries