Alarm indicating model faulty
Check for alarm code related to hardware failure
Look for error messages indicating model malfunction
Consult system documentation for specific alarm related to model fault
Power elements in telecommunications are components that provide electrical power to various devices and systems in the network.
Power supplies: Convert AC power from the grid to DC power for devices.
Batteries: Provide backup power in case of outages.
Power distribution units (PDUs): Manage and distribute power to different equipment.
Power over Ethernet (PoE): Delivers power to devices over Ethernet cables.
Generators: Us...
To handle a diesel generator in a desert area for 24/7 power supply, proper maintenance, monitoring, and fuel management are essential.
Regular maintenance checks to ensure the generator is in good working condition
Monitoring fuel levels and scheduling timely refills to avoid running out of fuel
Protecting the generator from extreme weather conditions in the desert
Having backup generators in case of any failures or break...
Automatic mode configurations for generator power on
Ensure automatic start is enabled in generator settings
Set up proper communication between generator and power source
Test automatic start functionality regularly to ensure reliability
The alarm that indicates an AC unit is faulty is typically the 'Fault' alarm.
The 'Fault' alarm is a common indicator of a malfunction in an AC unit.
Other alarms may include 'Low Pressure', 'High Pressure', 'Compressor Failure', etc.
I appeared for an interview in Jan 2022.
I appeared for an interview in Jan 2022.
Hayat Communication interview questions for popular designations
I appeared for an interview before May 2016.
I applied via Recruitment Consultant and was interviewed before Apr 2020. There were 4 interview rounds.
I appeared for an interview in Feb 2017.
posted on 3 May 2017
I appeared for an interview before May 2016.
I appeared for an interview in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes, which is 2 fishes.
To make the red fishes 98%, subtract 1% (2 fishes) from 99% (198 fishes).
To find the number of fishes to be removed, divide the difference by 1% (2 fishes).
Therefore, 50 fishes have to be removed to make the red fishes 98%.
based on 3 interviews
Interview experience
based on 58 reviews
Rating in categories
Telecom Engineer
7
salaries
| ₹8.8 L/yr - ₹14.4 L/yr |
Engineer
6
salaries
| ₹7.5 L/yr - ₹16 L/yr |
Project Manager
5
salaries
| ₹4.2 L/yr - ₹17.4 L/yr |
Team Lead
5
salaries
| ₹1 L/yr - ₹9.7 L/yr |
Telecommunication Engineer
5
salaries
| ₹1.2 L/yr - ₹8.3 L/yr |
Huawei Technologies
Shah Technical Consultants
Technocon Services
Teleindia Networks