Managing a negative client requires effective communication, empathy, and problem-solving skills.
Listen actively to their concerns and acknowledge their frustrations
Empathize with their situation and offer solutions to address their issues
Set clear expectations and boundaries for communication and project scope
Document all communication and agreements to avoid misunderstandings
Involve senior management or a mediator if...
Managing cross-functional teams requires clear communication, collaboration, and a shared understanding of goals and expectations.
Establish clear roles and responsibilities for each team member
Encourage open communication and active listening
Set clear goals and expectations for the project
Create a shared understanding of project timelines and milestones
Provide regular feedback and recognition for team members
Resolve co...
Top trending discussions
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.
Develop a detailed project plan outlining tasks, timelines, and resources required
Coordinate with suppliers for timely delivery of materials
Ensure proper equipment and manpower are available for the execution
Implement quality control measures to ensure the final product meets specifications
Regularly monitor p...
posted on 11 Sep 2022
I was interviewed in Aug 2022.
Bituminous laying temperature is 130-150°C and rolling temperature is 80-100°C.
Bituminous laying requires higher temperature than rolling.
Temperature range ensures proper compaction and adhesion.
Temperature can vary based on the type of bitumen and aggregate used.
Proper temperature control is crucial for quality bituminous pavement.
Material suitability criteria for aggregate in construction projects.
Aggregate size should be 26.5 mm or less.
Water absorption should not exceed 2%.
Soundness test should show Naso4 not more than 12% and Mgso4 not more than 18%.
Angle of abrasion should be less than 35% with max FI & EI less than 35%.
Equivalent weight of sand should not be less than 50%.
Aggregate should not be alkaline reactive.
MDD & MCC should be as per
The design procedure for DLC mix includes using M15 grade concrete, minimum cement content of 150 kg/cum, and achieving a compressive strength of at least 10 MPA after 7 days of curing.
Use M15 grade concrete with aggregate and cement ratio of 12:1
Minimum cement content of 150 kg/cum, or 120 kg/cum if fly ash content is over 20%
Achieve a compressive strength of at least 10 MPA after 7 days of curing
DLC mix should be hom...
The question is about the suitability of aggregate size and water absorption for PQC with a total thickness of 300mm and tolerance of +/-6mm.
Aggregate size of 31.5mm is suitable for PQC with a total thickness of 300mm and tolerance of +/-6mm.
Water absorption to GSB DLC being the same for PQC is also suitable.
The suitability of the material is important for the successful completion of the project.
The design procedure for cement concrete includes minimum cement content, strength requirements, dowel bar and tie bar specifications, and surface preparation and curing techniques.
Minimum cement content of 360 kg/cum if fly ash is more than 20%, and 310 kg/cum otherwise
Flexural strength of cement concrete after 28-day curing should be 4.5 MPa, and compressive strength should be 40 MPa
Dowel bar size of 32mm dia and 300...
based on 1 interview
Interview experience
Project Manager
27
salaries
| ₹5.2 L/yr - ₹13.5 L/yr |
Design Engineer
18
salaries
| ₹2.5 L/yr - ₹8 L/yr |
Senior Electrical Engineer
16
salaries
| ₹4.4 L/yr - ₹8 L/yr |
Electrical Engineer
14
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Assistant Manager
12
salaries
| ₹4.8 L/yr - ₹9 L/yr |
Sterlite Power
Adani Transmission
Tata Power
Power Grid Corporation of India