i
Hartek Group
Filter interviews by
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
CSD working method involves using computer-aided design software to create electrical designs.
CSD stands for Computer-Aided Design.
Engineers use specialized software to create and modify electrical designs.
The software allows for precise measurements, simulations, and analysis of the designs.
Common CSD software includes AutoCAD Electrical, SolidWorks Electrical, and EPLAN.
Engineers can collaborate and share designs eas
Split factor in earthing determines the distribution of fault current between the earth and the equipment.
Split factor is the ratio of fault current flowing through the earth to the total fault current.
It helps in determining the effectiveness of the earthing system in safely dissipating fault currents.
A higher split factor indicates more fault current flowing through the earth, which can be dangerous.
Proper design of ...
Tertiary winding in Auto Transformer is used to provide a third output voltage level.
Tertiary winding allows for three different output voltage levels to be obtained from the transformer.
It can be used for applications where multiple voltage levels are required, such as in power distribution systems.
The tertiary winding is connected in series with the primary and secondary windings to create a three-winding transformer...
Top trending discussions
posted on 16 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 4 interview rounds.
Project details you done earlier..
posted on 16 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 4 interview rounds.
Project details you done earlier..
posted on 15 Feb 2024
I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.
posted on 29 Apr 2022
A.C to D.C. conversion can be done using a rectifier circuit.
A rectifier circuit can be used to convert A.C. to D.C.
The rectifier circuit can be half-wave or full-wave.
Half-wave rectifier only allows half of the A.C. wave to pass through, while full-wave rectifier allows the entire wave.
The rectifier circuit can be made using diodes.
The output of the rectifier circuit is not smooth and requires filtering using capacito...
posted on 25 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
posted on 21 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Oct 2020. There was 1 interview round.
posted on 23 Nov 2020
I applied via Referral and was interviewed before Nov 2019. There were 3 interview rounds.
Project Manager
28
salaries
| ₹5.2 L/yr - ₹13.5 L/yr |
Design Engineer
17
salaries
| ₹2 L/yr - ₹5.8 L/yr |
Senior Electrical Engineer
16
salaries
| ₹4.4 L/yr - ₹8 L/yr |
Electrical Engineer
14
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Assistant Manager
13
salaries
| ₹3.5 L/yr - ₹9 L/yr |
Sterlite Power
Adani Transmission
Tata Power
Power Grid Corporation of India