Filter interviews by
Slump is a measure of concrete's consistency, footing is a structural element that supports a building, and column is a vertical structural member.
Slump is the measure of the consistency of concrete before it sets.
Footing is a structural element that transfers the load from a building to the soil.
Column is a vertical structural member that supports the load of a building.
Example: A slump test is conducted to determine ...
Grade M25 ratio is the mix ratio of cement, sand, and aggregate used in concrete construction.
Grade M25 ratio is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.
It is commonly used for construction of residential buildings, bridges, and pavements.
The strength of concrete produced with Grade M25 ratio is typically around 25 megapascals (MPa).
I applied via Indeed and was interviewed before Feb 2023. There was 1 interview round.
One way slab is supported on two opposite sides only, while two way slab is supported on all four sides.
One way slab is designed to carry loads in one direction only
Two way slab is designed to carry loads in both directions
One way slab is economical for small spans
Two way slab is more suitable for larger spans and heavy loads
Sump calculation involves determining the volume of a sump pit to ensure proper drainage and prevent flooding.
Calculate the length, width, and depth of the sump pit
Multiply the length, width, and depth to get the volume of the sump pit
Consider the flow rate of water entering the sump pit to determine its capacity
Ensure the sump pit is large enough to handle expected water flow
Account for any additional factors such as
The mix ratio of M20 concrete is 1:1.5:3 (1 part cement, 1.5 parts sand, 3 parts aggregate)
Mix ratio of M20 concrete is 1:1.5:3 (cement:sand:aggregate)
This means for every 1 part of cement, 1.5 parts of sand and 3 parts of aggregate are used
For example, if you have 1 bag of cement, you would need 1.5 bags of sand and 3 bags of aggregate
I applied via LinkedIn and was interviewed before Oct 2022. There were 3 interview rounds.
I have been told about myself. Wanted to know if they have any work experience. I was asked why I was leaving my previous company.
posted on 1 Apr 2021
posted on 1 Apr 2021
posted on 1 Apr 2021
posted on 5 May 2021
I applied via Company Website and was interviewed in Nov 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Aug 2020. There were 4 interview rounds.
posted on 29 Jun 2015
posted on 29 Jun 2015
based on 6 interviews
Interview experience
based on 31 reviews
Rating in categories
Civil Site Engineer
11
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Site Engineer
9
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Site Incharge
7
salaries
| ₹0.6 L/yr - ₹6.6 L/yr |
Mechanical Engineer
5
salaries
| ₹2 L/yr - ₹6 L/yr |
Store Incharge
4
salaries
| ₹3.6 L/yr - ₹5 L/yr |
Reliance Communications
Henry Harvin Education
GAO Tek
Tata Teleservices