I applied via Walk-in and was interviewed in Feb 2023. There were 2 interview rounds.
The Grade of GSB at my previous site was 40 mm.
The Grade of GSB at my previous site was 40 mm.
GSB stands for Granular Sub Base.
The thickness of GSB is usually specified in millimeters.
GSB is a layer of compacted granular material used as a base for asphalt, concrete, or other paving materials.
Tolerances in base and sub-base coarse materials are critical for ensuring proper compaction and stability of the highway.
Tolerances for base coarse typically range from +/- 20mm to +/- 40mm depending on the specified thickness.
Tolerances for sub-base coarse are usually wider, ranging from +/- 50mm to +/- 100mm.
Proper compaction is essential to meet these tolerances and ensure the structural integrity of the highway.
To...
MDD is Maximum Dry Density, FDD is Field Dry Density. MDD is the maximum density achieved by compacting soil in the lab, FDD is the density achieved in the field after compaction.
MDD is determined through laboratory tests using standard compaction methods.
FDD is measured in the field using a nuclear density gauge or sand cone method.
MDD is used to determine the optimum moisture content for compaction.
FDD helps in asses...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
Billing codes are determined by the organization and industry standards.
Billing codes are used to identify specific products or services provided by an organization.
The codes are typically determined by the organization and may also follow industry standards.
Examples of billing codes include CPT codes for medical procedures and UPC codes for retail products.
based on 1 interview
Interview experience
Assistant Manager
133
salaries
| ₹4.2 L/yr - ₹13.2 L/yr |
Senior Engineer
91
salaries
| ₹4.1 L/yr - ₹8.7 L/yr |
Assistant Engineer
78
salaries
| ₹2.9 L/yr - ₹4.6 L/yr |
Engineer
73
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Structural Engineer
66
salaries
| ₹2.6 L/yr - ₹5.4 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon