Filter interviews by
I applied via Walk-in
Contracts are legally binding agreements between parties outlining the terms and conditions of a project or service.
Contracts define the scope of work, responsibilities, payment terms, and dispute resolution mechanisms.
Clauses in contracts include indemnity clauses, termination clauses, force majeure clauses, and dispute resolution clauses.
Contracts can be written or verbal, but written contracts are recommended for cl...
Variations in quantity surveying refer to changes in the scope of work or specifications of a project.
Variations can be initiated by the client, contractor, or due to unforeseen circumstances.
Variations must be documented and agreed upon by all parties involved.
The cost and time implications of variations need to be carefully assessed and managed.
Examples of variations include changes in materials, design modifications
I applied via Approached by Company and was interviewed before May 2021. There was 1 interview round.
Answers to questions related to Instrumentation Supervisor position
An instrument is a device used to measure or control a process variable
Calibration is necessary to ensure accuracy and reliability of measurements
4 m.a is the minimum current required to operate a loop
0 to 20 m.a is not used because it does not provide a clear indication of a fault in the loop
Secondary cables are used for longer distances while primary ...
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.
There are various types of concrete used in construction, and each type requires different testing methods.
Types of concrete include plain, reinforced, pre-stressed, lightweight, and high-strength.
Testing methods include slump test, compressive strength test, flexural strength test, and water absorption test.
Slump test measures the consistency of fresh concrete, compressive strength test measures the strength of harden...
Points to consider while rebar fixing
Ensure proper spacing and alignment of rebars as per design
Use appropriate binding wire to tie the rebars together
Ensure proper lap length of rebars as per design
Ensure proper cover to the rebars to prevent corrosion
Ensure proper anchorage of rebars at the ends
Ensure proper placement of rebars in beams, columns, slabs, etc.
Ensure proper curing of concrete after rebar fixing
During formwork inspection, various items need to be checked to ensure safety and quality of the structure.
Check the formwork design and ensure it meets the specifications
Inspect the formwork materials for any damage or defects
Check the formwork supports and ensure they are stable and properly placed
Inspect the formwork ties and braces to ensure they are secure and properly placed
Check the formwork for proper alignment...
Top trending discussions
Quantitative reasoning
I applied via LinkedIn and was interviewed in Nov 2024. There were 3 interview rounds.
Logic test and personality test
I am a sustainability consultant with a background in environmental science and experience in implementing sustainable practices.
Background in environmental science
Experience in implementing sustainable practices
Passionate about promoting sustainability in various industries
Passionate about promoting sustainable practices and making a positive impact on the environment.
Passionate about environmental conservation and sustainability
Believe in the importance of implementing sustainable practices in businesses
Excited about the opportunity to help organizations reduce their carbon footprint
Previous experience in sustainability projects or initiatives
I faced a challenge in my previous role when implementing a sustainability program for a large corporation.
Resistance from upper management to allocate resources for sustainability initiatives
Difficulty in engaging employees at all levels to participate in sustainability efforts
Lack of buy-in from stakeholders outside of the organization
Balancing short-term financial goals with long-term sustainability objectives
posted on 30 Dec 2024
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
OSHA standards applicable to building construction include fall protection, hazard communication, scaffolding safety, and electrical safety.
Fall protection requirements include guardrails, safety nets, and personal fall arrest systems.
Hazard communication standards require employers to provide information about hazardous chemicals used on site.
Scaffolding safety regulations cover proper construction, use, and maintenan...
AISC codes applicable to steel structures include AISC 360 for design of structural steel buildings and AISC 341 for seismic design.
AISC 360 - Specification for Structural Steel Buildings
AISC 341 - Seismic Provisions for Structural Steel Buildings
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 2 Aug 2024
I applied via Company Website
The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.
Company has a strong financial position
Ongoing projects are in progress
Company has a good reputation in the industry
Employee growth refers to the development and advancement of an individual within their career.
Employee growth involves acquiring new skills and knowledge
It includes taking on more responsibilities and challenges
Career progression and promotions are indicators of employee growth
Action points at site level refer to specific tasks or activities that need to be completed on the construction site.
Action points are typically identified during site inspections or progress meetings.
They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.
Examples of action points could be revising drawings to address conflicts, obtaining necess...
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
based on 80 reviews
Rating in categories
HSE Officer
11
salaries
| ₹4 L/yr - ₹12 L/yr |
Civil Engineer
8
salaries
| ₹4.4 L/yr - ₹12.3 L/yr |
Assistant Quantity Surveyor
6
salaries
| ₹7.3 L/yr - ₹11 L/yr |
Construction Management
4
salaries
| ₹25 L/yr - ₹60 L/yr |
QA QC Engineer
4
salaries
| ₹10 L/yr - ₹16.5 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Tata Projects
Hindustan Construction Company