An update survey is a follow-up survey conducted to gather new information or verify existing data.
Update surveys are typically conducted to assess changes in a project site or to verify previous survey data.
They may involve measuring new structures, boundaries, or features that were not included in the original survey.
Update surveys help ensure that project plans and estimates are accurate and up-to-date.
Examples of u...
Iam not interested in my office, but Side.
No education and me in my school.
posted on 21 Dec 2024
I was interviewed before Dec 2023.
The standard deduction as per IS 1200 is a fixed amount that can be deducted from the measured quantities of certain items in a construction project.
The standard deduction is typically used for items like scaffolding, formwork, and centering in construction projects.
It is a fixed percentage of the measured quantity, usually ranging from 2% to 5% depending on the item and project.
The purpose of the standard deduction is...
Material properties refer to the characteristics and behavior of materials used in construction projects.
Material properties include density, strength, durability, thermal conductivity, and elasticity.
Understanding material properties is crucial for selecting the right materials for a project.
Examples of material properties affecting construction include water absorption in concrete and thermal expansion in metals.
posted on 12 Feb 2024
I applied via LinkedIn and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Simple game style interview
I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Oct 2021. There were 3 interview rounds.
posted on 6 Jul 2024
posted on 24 Sep 2022
I applied via Company Website and was interviewed before Sep 2021. There were 3 interview rounds.
Some basic questions of mathematics up to 10th class.
posted on 26 Nov 2022
I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.
General mathematical question like work, force, percentage etc.
Secured advance in client billing is a payment made by the client to the contractor before the work is completed.
It is a form of pre-payment made by the client to the contractor
It is usually made to help the contractor cover the cost of materials and labor before the work is completed
The amount of the secured advance is usually a percentage of the total contract value
The contractor must provide security for the advance...
Shear force max depends on the material and cross-sectional shape of the beam.
Shear force max is the maximum force that a beam can withstand before it fails in shear.
It depends on the material properties of the beam, such as its yield strength and modulus of elasticity.
It also depends on the cross-sectional shape of the beam, such as whether it is rectangular, circular, or I-shaped.
Calculating shear force max requires ...
The wastage percentage varies depending on the type of work.
Wastage percentage for construction work can range from 5% to 20% depending on the type of material used.
For electrical work, the wastage percentage can be around 2% to 5% due to damaged or defective components.
In plumbing work, the wastage percentage can be around 10% to 15% due to incorrect measurements or damaged pipes.
For painting work, the wastage percent...
based on 2 reviews
Rating in categories
Civil Engineer
10
salaries
| ₹10 L/yr - ₹15.8 L/yr |
HSE Officer
9
salaries
| ₹7.8 L/yr - ₹14 L/yr |
Construction Management
5
salaries
| ₹36 L/yr - ₹55 L/yr |
QA QC Engineer
4
salaries
| ₹11.2 L/yr - ₹24 L/yr |
Safety Engineer
4
salaries
| ₹6 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Tata Projects
Hindustan Construction Company