Filter interviews by
Implemented a preventive maintenance program that reduced equipment downtime by 20%.
Developed and implemented a preventive maintenance program
Reduced equipment downtime by 20%
Improved overall equipment reliability and efficiency
Various products sell in the market depending on the industry, including consumer goods, electronics, pharmaceuticals, and more.
Consumer goods such as clothing, food, and household items are popular in the market.
Electronics like smartphones, laptops, and TVs are in high demand.
Pharmaceuticals including prescription drugs, over-the-counter medications, and supplements are essential products in the market.
Other pro...
Increasing efficiency involves optimizing processes, utilizing technology, and fostering a culture of continuous improvement.
Identify bottlenecks and streamline processes
Automate repetitive tasks
Implement lean manufacturing principles
Invest in advanced technology and tools
Train employees to work more efficiently
Encourage collaboration and communication
Set clear goals and monitor performance
Regularly review and imp...
To increase deaerator temperature, increase the steam flow rate or decrease the cooling water flow rate.
Increase the steam flow rate into the deaerator
Decrease the cooling water flow rate through the deaerator
Adjust the pressure of the steam entering the deaerator
Increase the surface area of the deaerator to enhance heat transfer
Improve the insulation of the deaerator to minimize heat loss
I have experience visiting complaint sites, focusing on effective communication and problem-solving to address concerns.
Conducted thorough assessments of the complaint sites to understand the issues at hand.
Engaged with stakeholders to gather insights and perspectives, ensuring all voices were heard.
Implemented a structured approach to problem-solving, prioritizing urgent issues first.
Followed up with complainants...
Troubleshooting involves identifying and resolving problems in a system or process.
Identify the problem and gather information about it
Develop and test hypotheses to determine the cause of the problem
Implement a solution and test to ensure it resolves the problem
Document the troubleshooting process and solution for future reference
Yes, I have worked on a project to develop a mobile application for a local restaurant.
Developed a mobile application for a local restaurant using React Native
Implemented features such as online ordering, menu display, and push notifications
Collaborated with a team of designers and developers to ensure timely delivery
Conducted user testing and made necessary improvements based on feedback
I will ensure product fitness by implementing quality control measures and conducting thorough testing.
Implementing quality control measures to ensure consistency and reliability
Conducting thorough testing to identify any defects or issues
Following industry standards and regulations to ensure product safety
Collaborating with cross-functional teams to address any concerns or issues
Continuously monitoring and improv...
Pumps are mechanical devices used to move fluids, and they come in various types based on their design and application.
Centrifugal Pumps: Use rotational energy to move fluids; commonly used in water supply systems.
Positive Displacement Pumps: Move fluid by trapping a fixed amount and forcing it into the discharge; examples include gear pumps and diaphragm pumps.
Submersible Pumps: Designed to be submerged in the fl...
Pumps are mechanical devices used to move fluids by converting mechanical energy into hydraulic energy.
Pumps are used in various applications like water supply, irrigation, and industrial processes.
They can be classified into positive displacement pumps and centrifugal pumps.
For example, a centrifugal pump is commonly used in water treatment plants.
Positive displacement pumps are often used in oil and gas industri...
posted on 26 Jan 2025
I appeared for an interview in Dec 2024.
As a Project Engineer - Civil, my duty on the project was to oversee the planning, design, and construction of civil engineering projects.
Managed project timelines and budgets
Coordinated with architects, contractors, and other stakeholders
Ensured compliance with building codes and regulations
Performed site inspections and quality control checks
Resolved any issues or challenges that arose during construction
The duration of a project can vary depending on the scope and complexity of the project.
The duration of a project can range from a few months to several years.
Factors such as project size, budget, resources, and unforeseen challenges can impact the timeline.
For example, a small residential construction project may take 6-12 months, while a large infrastructure project like a bridge or highway may take 2-5 years.
Project...
I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.
The value of water pH indicates its acidity or alkalinity.
Water pH is a measure of how acidic or alkaline the water is.
The pH scale ranges from 0 to 14, with 7 being neutral.
A pH below 7 indicates acidity, while a pH above 7 indicates alkalinity.
Pure water has a pH of 7.
Different substances can affect the pH of water, such as pollutants or minerals.
40% of 800 is 320.
Calculate 40% of 800 by multiplying 800 by 0.4.
40% of 800 = 800 * 0.4 = 320.
1 kilogram is equal to 0.001 metric tons.
1 kilogram = 0.001 metric tons
To convert kilograms to metric tons, divide by 1000
Example: 5 kilograms = 5 * 0.001 = 0.005 metric tons
pH scale is a measure of acidity or alkalinity of a solution on a scale of 0 to 14.
pH below 7 indicates acidity, with 0 being the most acidic
pH above 7 indicates alkalinity, with 14 being the most alkaline
Pure water has a pH of 7, considered neutral
Water properties include cohesion, adhesion, high specific heat, universal solvent, and density anomaly.
Cohesion: Water molecules stick to each other due to hydrogen bonding.
Adhesion: Water molecules stick to other substances due to polarity.
High specific heat: Water can absorb a lot of heat before temperature changes.
Universal solvent: Water can dissolve many substances due to its polarity.
Density anomaly: Water is mo...
I appeared for an interview in Oct 2024.
Air conditioning is a system that cools and dehumidifies air in an enclosed space to provide comfort.
Air conditioning systems use refrigerants to cool the air.
They remove heat and moisture from the air to create a more comfortable environment.
Air conditioning can also help improve air quality by filtering out pollutants and allergens.
Examples of air conditioning systems include central air conditioning units, window un...
Lead time is the amount of time it takes for a product to be delivered after an order is placed.
Lead time includes processing, production, and delivery time.
It is important for businesses to minimize lead time to improve customer satisfaction.
Example: If a company has a lead time of 5 days, it means it takes 5 days from order placement to delivery.
Lean manufacturing is a systematic method for eliminating waste within a manufacturing system while maximizing productivity.
Focuses on continuous improvement
Aims to reduce waste in all forms (time, resources, etc.)
Involves empowering employees to identify and solve problems
Uses tools like value stream mapping, 5S, and kanban
Originated from the Toyota Production System
Kaizen activity is a continuous improvement process that involves all employees in making small changes to improve efficiency and quality.
Kaizen is a Japanese term meaning 'change for the better'
It focuses on making small, incremental improvements in processes and systems
Kaizen involves all employees in the organization, from top management to frontline workers
Examples of kaizen activities include implementing 5S metho...
5 team members was in interview .
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
I am responsible for managing key accounts, developing new business opportunities, and ensuring customer satisfaction.
Managing key accounts to maintain and grow business relationships
Developing new business opportunities through market research and networking
Ensuring customer satisfaction by addressing any issues or concerns promptly
Vendor management involves overseeing relationships with suppliers to ensure quality, cost-effectiveness, and timely delivery of goods and services.
Identifying and selecting vendors based on criteria such as quality, price, and reliability
Negotiating contracts and terms with vendors to ensure favorable terms for the company
Monitoring vendor performance and addressing any issues or concerns that may arise
Managing relati...
I am responsible for managing key accounts, developing new business opportunities, and ensuring customer satisfaction.
Managing key accounts to maintain and grow business relationships
Developing new business opportunities through market research and networking
Ensuring customer satisfaction by addressing any issues or concerns in a timely manner
I applied via Approached by Company and was interviewed in Jun 2024. There were 3 interview rounds.
Paints work by forming a protective and decorative layer on surfaces through a combination of pigments, binders, solvents, and additives.
Pigments provide color and opacity to the paint
Binders hold the pigments together and adhere them to the surface
Solvents help in the application and drying of the paint
Additives improve properties like durability, gloss, and flow of the paint
Dispersion process refers to the distribution of particles or components within a medium.
Dispersion involves breaking down larger particles into smaller ones to evenly distribute them in a medium.
Common methods of dispersion include stirring, ultrasonication, and homogenization.
Examples of dispersion processes include mixing paint pigments in a solvent and dispersing nanoparticles in a polymer matrix.
The cycle time of the TSD process refers to the total time taken for one complete cycle of the process.
Cycle time is calculated by adding up the time taken for each individual step in the process.
It is important to optimize cycle time to improve efficiency and productivity.
For example, if the TSD process involves three steps that take 10 minutes, 15 minutes, and 20 minutes respectively, the cycle time would be 45 minut...
MCT stands for Medium Chain Triglycerides, important for energy production, weight management, and brain health.
MCTs are easily digested and absorbed by the body, providing a quick source of energy.
They can aid in weight management by increasing feelings of fullness and boosting metabolism.
MCTs have been shown to have cognitive benefits, supporting brain health and function.
Common food sources of MCTs include coconut o...
I am unable to disclose my previous CTC as it is confidential information.
Previous CTC is confidential information and I am unable to disclose it.
It is common practice not to disclose previous CTC during interviews.
Focus on discussing salary expectations for the new role instead of past CTC.
I applied via Company Website and was interviewed in May 2024. There were 5 interview rounds.
I follow safety precautions by wearing appropriate personal protective equipment, following proper procedures, and being aware of my surroundings.
Always wear the necessary personal protective equipment (PPE) such as helmets, gloves, and safety goggles.
Follow all safety procedures and protocols provided by the company or organization.
Be aware of your surroundings and potential hazards to prevent accidents.
Regularly insp...
I appeared for an interview in Apr 2025, where I was asked the following questions.
Top trending discussions
Some of the top questions asked at the Grasim Industries interview for experienced candidates -
The duration of Grasim Industries interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 90 interview experiences
Difficulty level
Duration
based on 3.1k reviews
Rating in categories
Assistant Manager
691
salaries
| ₹4.6 L/yr - ₹15.8 L/yr |
Assistant Engineer
463
salaries
| ₹3.2 L/yr - ₹7 L/yr |
Junior Engineer
327
salaries
| ₹2.5 L/yr - ₹6.2 L/yr |
Deputy Manager
278
salaries
| ₹5.6 L/yr - ₹20.5 L/yr |
Engineer
243
salaries
| ₹3 L/yr - ₹9 L/yr |
UltraTech Cement
JK Cement
Shree Cement
Dalmia Bharat Cement