Upload Button Icon Add office photos

Filter interviews by

Gopani Iron & Power Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Heat transfer Mass transfer Unit operation. It three prepare well
  • Q2. Distillation and heat exchanger and pumps and valve
Round 2 - Group Discussion 

REFINERY and petrochemical company operation

Interview Preparation Tips

Interview preparation tips for other job seekers - I will prepare eagerly waiting for interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Ash handling operation working on reliance power plant singrauli
  • Ans. 

    Ash handling operation at Reliance Power Plant Singrauli involves the management of ash generated from the combustion of coal.

    • Ash handling involves collecting, transporting, and disposing of ash generated from the combustion process.

    • Different methods of ash handling include dry ash handling and wet ash handling.

    • Reliance Power Plant Singrauli may use technologies like ash slurry disposal system or pneumatic conveying sy...

  • Answered by AI
  • Q2. Clinikar grinder air compressor ht pump LT pump

Interview Preparation Tips

Interview preparation tips for other job seekers - Ash handling operation reliance power plant singrauli mp
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Preventive maintenance
  • Q2. Corrective maintenance
Round 2 - Assignment 

Overviews pumps and trableshooting

Interview Preparation Tips

Interview preparation tips for other job seekers - I am improve myself
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

A good DSA question, based on array manipulation and queues. Platform was Zoom call, so you can use any online IDE.

Round 2 - One-on-one 

(3 Questions)

  • Q1. Question related to previous job Experience
  • Q2. Questions related to OOPS concepts
  • Q3. Question on System Design and Fundamentals of Language.
Round 3 - Behavioral interview 

(4 Questions)

  • Q1. Past Experience
  • Q2. How you tackle with challenges in less time
  • Q3. How you handle complete new tech stack?
  • Q4. Approach towards trivial puzzles.
Round 4 - HR 

(1 Question)

  • Q1. Compensation Decisions

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep concepts clear, and you should back up your answers with real-life examples that everyone uses, so the interviewer can understand better and relate.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Coding Test 

Leetcode hard: 1. Similar to Queens problem DP based, 2. Coin change problem

Round 2 - Technical 

(2 Questions)

  • Q1. SSR vs Client rendering
  • Ans. 

    SSR renders the initial page on the server side while client rendering renders the page on the client side.

    • SSR improves SEO as search engines can crawl the fully rendered page on the server side.

    • Client rendering provides faster initial load times as only data is fetched initially and UI is rendered on the client side.

    • SSR is better for static content websites while client rendering is better for dynamic content websites...

  • Answered by AI
  • Q2. Performance Optimization

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Basic of electrical
  • Q2. Basic of motor and projects
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed in Mar 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Somic zf component pvt Ltd company very good.
  • Q2. All employees friendly person, I like that's company
  • Q3. I want to work in this company again
  • Q4. Technical Leader

Interview Preparation Tips

Interview preparation tips for other job seekers - I want to work in this company again.
It is very good company.

Junior Cased Hole Engineer Interview Questions & Answers

HLS Asia user image Anonymous

posted on 16 Feb 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at University of Petroleum and Energy Studies (UPES), Dehradun and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Two considerations while performing Drilling. Function of Cementing/Why cementing is done.
  • Q2. Why power is transferred at high volatage to the field.

Interview Preparation Tips

Topics to prepare for HLS Asia Junior Cased Hole Engineer interview:
  • Logging
  • basic electrical
  • Drilling
Interview preparation tips for other job seekers - Clear basics of Petroleum Engineering and basic electrical as well.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. I have knowledge of Electrical Field.
  • Q2. Electrical component
  • Q3. Electrical Wiring estimation
  • Ans. 

    Electrical wiring estimation involves calculating the amount of wiring needed for a project.

    • Determine the total length of wiring required based on the layout of the building or system

    • Consider the type and gauge of wires needed for different components

    • Factor in any special requirements such as conduit or cable trays

    • Estimate the cost of materials and labor for the wiring installation

  • Answered by AI
  • Q4. Autocad knowledge
  • Q5. I am interested in Electrical engineering jobs
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. What was the roll in this company
  • Q2. I am a sr supervisor
  • Q3. What was site management
  • Ans. 

    Site management involves overseeing the operations and maintenance of a specific location or facility.

    • Responsibilities include ensuring safety protocols are followed

    • Managing staff and resources efficiently

    • Maintaining equipment and facilities

    • Coordinating with other departments or organizations

    • Implementing policies and procedures

    • Example: A site manager at a construction site would be responsible for overseeing the constr...

  • Answered by AI
  • Q4. What was office management
  • Ans. 

    Office management involves overseeing and coordinating administrative activities within an office setting.

    • Involves organizing and coordinating office operations and procedures

    • Includes managing office supplies, equipment, and facilities

    • Responsible for overseeing administrative staff and delegating tasks

    • Ensures efficient workflow and communication within the office

    • May involve budgeting and financial management for office

  • Answered by AI
  • Q5. What was labour management
  • Ans. 

    Labour management involves overseeing and coordinating the workforce to ensure productivity and efficiency.

    • Labour management includes tasks such as scheduling shifts, assigning duties, monitoring performance, and resolving conflicts.

    • Effective labour management can lead to increased productivity, reduced costs, and improved employee satisfaction.

    • Examples of labour management tools include time tracking software, perform...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I want this job

Gopani Iron & Power Interview FAQs

How to prepare for Gopani Iron & Power interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Gopani Iron & Power. The most common topics and skills that interviewers at Gopani Iron & Power expect are Chemical Engineering, Civil, EEE, Electrical Engineering and Industrial Engineering.

Tell us how to improve this page.

Gopani Iron & Power Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 832 Interviews
JSW Steel Interview Questions
3.9
 • 575 Interviews
Vedanta Limited Interview Questions
3.8
 • 44 Interviews
ArcelorMittal Interview Questions
4.1
 • 29 Interviews
Vizag Steel Interview Questions
4.1
 • 28 Interviews
Monnet Group Interview Questions
4.4
 • 10 Interviews
View all

Gopani Iron & Power Reviews and Ratings

based on 30 reviews

4.2/5

Rating in categories

3.7

Skill development

3.9

Work-life balance

3.7

Salary

3.9

Job security

3.8

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 30 Reviews and Ratings
Electrical Engineer
8 salaries
unlock blur

₹1.2 L/yr - ₹4 L/yr

Quaity Control Engineer
4 salaries
unlock blur

₹1 L/yr - ₹3 L/yr

Electrical Shift Engineer
4 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

1st class Boiler Attendant
4 salaries
unlock blur

₹3 L/yr - ₹3.5 L/yr

General Manager Commercial
4 salaries
unlock blur

₹18.6 L/yr - ₹18.6 L/yr

Explore more salaries
Compare Gopani Iron & Power with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

ArcelorMittal Nippon Steel

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview