i
Gopalan Enterprises
Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2024. There were 4 interview rounds.
Specialize in sustianable building and your ambition to make a positiv
Environmentally friendly construction
Friendly construction
posted on 1 Dec 2021
I applied via Campus Placement and was interviewed before Dec 2020. There were 4 interview rounds.
Reinforcement and rebar are steel bars used to reinforce concrete structures. They are commonly used in block work.
Reinforcement and rebar are used to provide tensile strength to concrete structures.
They are commonly used in block work to reinforce the walls and provide stability.
Rebar is typically made of carbon steel and is available in various sizes and shapes.
The size and spacing of the rebar depend on the design a...
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
I am currently working at a construction site in downtown city.
Construction site in downtown city
Working on a high-rise building project
Coordinating with architects, contractors, and workers
Ensuring adherence to safety regulations and project timelines
I applied via Referral and was interviewed in Jun 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Sep 2021. There were 3 interview rounds.
Real estate sales offer a dynamic and challenging environment with unlimited earning potential.
Real estate is a constantly evolving industry with new challenges and opportunities every day.
The earning potential in real estate sales is virtually unlimited, with commissions based on the value of the properties sold.
Working in real estate sales allows for a flexible schedule and the ability to work independently.
Real esta...
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
posted on 25 Jan 2025
I appeared for an interview before Jan 2024.
I have always been fascinated by the potential for growth and investment in real estate.
Passion for real estate market trends and opportunities
Enjoy working with people and helping them find their dream homes
Excited about the potential for financial growth and success in the industry
I reside in a cozy apartment in downtown Seattle.
I live in downtown Seattle
I have a cozy apartment
My residence is in a city
I can join the department within two weeks of receiving an offer.
I can start within two weeks of receiving an offer.
My current job requires a two-week notice period.
I have some personal commitments that I need to wrap up before starting.
Excel, english , finance
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Site Engineer
13
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Civil Site Engineer
11
salaries
| ₹1.9 L/yr - ₹4.4 L/yr |
Facility Manager
10
salaries
| ₹4.2 L/yr - ₹8.4 L/yr |
Senior Engineer
9
salaries
| ₹4.2 L/yr - ₹8.4 L/yr |
Project Engineer
9
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Knight Frank
SMEC
Berkadia
Indiabulls Real Estate